Miele PT8807SH Installation guide

Type
Installation guide

This manual is also suitable for

38.15
en - US
Mat. NR. 09 883 210 / 02
Installation plan
Tumble dryer
PT 8807 EL (Electrically heated)
Mat. NR. 09 883 210 / 02
2
It is essential to read the operating and installation instructions before
installing, commissioning or using the machine.
This avoids the risk of accidents or damage.
All rights reserved
U.S.A.
Miele, Inc.
National Headquarters
9 Independence Way
Princeton, NJ 08540
Phone:
Fax:
www.mieleusa.com
Technical Service & Support
Nationwide
Phone:
800-991-9380
Fax:
800-220-1348
8
00-991-9380
609-419-4241
Installation plan: PT 8807 EL
Date: 2015-Sep-15 Page: 8
Technical datasheet
Tumble dryer:
Heating:
PT 8807
Electric (EL)
Legend:
Abbreviations in bold type:
Connection required
en - US
Abbreviations in circle with dashes:
Connection optional or required depending on model version
Optional extras:
BS
Concrete base
mm
100
4“
mm
50
2“
mm
1.200
47“
mm
1.400
55“
Machine connections:
Electrical
connection
Voltage
V
3 AC 208
Frequency
Hz
60
Rated load
kW
27.4
Fuse rating
A
3 × 90
Connection cable, min. cross-section
mm²
AWG 16
Cable screw connector
M 50
Connection cable to be ordered separately.
Electrical connection must comply with national
regulations
If machines are hard-wired, a multi-pole main switch must
be provided on site.
A wall socket or main isolator must be accessible after
installation.
Equipotential
bonding
Connection with male thread
mm
10 × 35
with washers and nut
M
10
Accessories not included.
If necessary, equipotential bonding with good galvanic
contact must be provided in accordance with all
appropriate national and local regulations.
Peak load
energy
management
Control contact voltage
V
AC 230
Connection cable, min. cross-section
mm²
5 × 1,5
Connection cable to be ordered separately.
Connection via a flexible supply lead with a separate
isolator is recommended. The isolator should be visible
and easily accessible after machine installation.
Vented
m³/h
1.100
38,85 cu ft/h
Max. Nominal air flow in vented mode
Max. Permissible pressure loss
Connection on machine side (ext. diameter)
mm
150
6“
Connection pipe provided on site (int. diameter)
mm
150
6“
Max. temperature
°C
80
176 °F
As relative humidity inside the vent ducting can be as high
as 100%, suitable measures must be taken to prevent a
backflow of condensate into the machine.
Pa 300 0.04 PSI
Installation plan: PT 8807 EL
Date: 2015-Sep-15
Page: 9
Air intake Standard connection: Air intake from installation site
Unobstructed air intake into room recommended
(corresponding to 3 times the vent cross-section of
machine)
cm²
531
32 cu in
A sufficient supply of fresh air should be ensured to
replace the air extracted.
Alternative connection: Ducted air intake (from outside
building)
Connector on machine (int. diameter)
mm
161
6 ½“
Connection pipe provided on site (ext. diameter)
mm
160
6 ¼“
Lid removal exposes live components! For safety
reasons, the pipe connected for central air intake should
be at least 900 mm long and secured using two screws.
Fittings
(supplied)
mm
6 × 40
mm
10 × 50
Without base
2 × clamps
2 × screws DIN 571 (Ø × length)
2 × rawl plugs (Ø × length)
The machine should be bolted to the floor.
Fixing materials for a floating screed floor are to be
provided on site.
mm
6 × 40
mm
10 × 50
On concrete platform
2 × clamps
2 × screws DIN 571 (Ø × length)
2 × rawl plugs (Ø × length)
The machine must be bolted to the floor!
Fixing materials for a floating screed floor are to be
provided on site.
Machine data
Unit width
mm
1.206
47 ½“
Machine depth
mm
1.384
54 ½“
Unit height
mm
1.640
64 ½“
Casing width
mm
1.200
47 ¼“
Casing depth
mm
1.279
50 ½“
Minimum width of delivery access to installation site
mm
1.220
48“
Recommended rear wall gap (measured to front of
machine)
mm
1.800
71“
Min. wall gap (to rear edge of lid)
mm
500
19 ¾“
kg
287 632 lb
N
3.708
Watt
973
dB (A)
73,6
Net weight
Max. load bearing in operation
Average heat dissipation
(dependent on ambient room temperature and program
selected)
A Noise level
A Sound pressure level
dB (A)
62
Installation should only be carried out by authorised installers in accordance with all local and national regulations!
Follow installation instructions when installing machine. All rights reserved. Measurements in millimeters [inches].
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9

Miele PT8807SH Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI