FSR 244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
43051 LIT1479A
1. REMOVE AND DISCARD TEMPORARY COVER AND SCREWS.
TEMPORARY COVER
(8) FLAT HEAD SCREW
2. INSTALL CABLE INTERFACES AND CONNECTOR PLATES IF PREVIOUSLY
NOT INSTALLED. CLEAN AREA IN AND AROUND ENTIRE TOP EDGE OF
BOX AND APPLY 1/4" CONTINUOUS BEAD OF RTV SILICONE SEALANT.
CLEAN AND APPLY SEALANT
AROUND ENTIRE EDGE
CLEAN AND APPLY SEALANT
AROUND ENTIRE EDGE
COVER
(8) O-RING
(8) FLAT HEAD SCREW
3. INSTALL COVER WITH SUPPLIED O-RINGS AND FLAT HEAD SCREWS.
INSTALL FINISHED FLOORING MATERIAL.
FL-500P/600P COVER INSTALLATION INSTRUCTIONS
NOTE: COVER SHIM KIT (FL-500P-CSK OR
FL-600P-CSK) MAY BE REQUIRED TO
SET THE HEIGHT OF BOX "PRE-POUR"
SO THE TOP OF FINISH COVER
MATCHES TOP OF FINISHED FLOOR.