Installation Guide Blizzard
5 AP-75261 – Rev. 2.0 – 19/12/07
Table of contents
1 Installation environment......................................................................................................... 9
1.1 Installation environment requirements......................................................................................... 9
1.2 Dimensions Blizzard .................................................................................................................. 10
1.3 Required Space ......................................................................................................................... 11
2 Verification of packaged items ............................................................................................ 13
2.1 Contents Blizzard printer unit box.............................................................................................. 14
2.2 Contents Printer stand box ........................................................................................................ 14
2.3 Contents Installation kit.............................................................................................................. 15
2.4 Contents Blizzard starter kit ....................................................................................................... 16
2.5 Contents Unwinder/Winder 100................................................................................................. 21
3 Unpacking procedure ........................................................................................................... 23
3.1 Unpack the printer...................................................................................................................... 23
3.2 Unpack the stand ....................................................................................................................... 26
4 Assembling the unit.............................................................................................................. 27
4.1 Assembling the stand................................................................................................................. 27
4.2 Installing the printer on the stand............................................................................................... 28
4.3 Remove protective materials. .................................................................................................... 30
4.4 Levelling the printer.................................................................................................................... 31
4.5 Install the Unwinder/Winder 100................................................................................................ 33
4.6 Install the waste bottle ............................................................................................................... 34
5 Connecting the cables.......................................................................................................... 35
5.1 Connecting the foot switch......................................................................................................... 35
5.2 Connecting the power cable ...................................................................................................... 36
5.3 Connecting the printer to the PC ............................................................................................... 38
6 Loading ink for first time ...................................................................................................... 43
6.1 Parts needed.............................................................................................................................. 43
6.2 First ink load procedure ............................................................................................................. 44
7 Loading media....................................................................................................................... 51
7.1 Loading roll media...................................................................................................................... 51
7.2 Loading sheet media.................................................................................................................. 51
8 Head adjustments verification ............................................................................................. 53
8.1 Head Slant Check ...................................................................................................................... 54
8.2 Front and Back........................................................................................................................... 55
8.3 Bi-Directional.............................................................................................................................. 56
8.4 Uni-Directional ........................................................................................................................... 59
8.5 Micro Shift 1/720” for FAST modes ........................................................................................... 60
9 Test printing .......................................................................................................................... 63
10 Periodical Maintenance cycles ............................................................................................ 65
10.1 Done by the end user................................................................................................................. 65
10.2 Done by an Authorized Mutoh Technician................................................................................. 66
Feedback sheet first ink load procedure............................................................................................ 67