Morningstar Prostar MPPT Quick start guide

Type
Quick start guide
Optional Accessories
Quick Start Guide
14
Warning: Shock Hazard
Testbetweenallterminalsand
groundbeforetouching.
PoweroraccessoryterminalsareNOT
electricallyisolatedfromDCinputandmay
be energized with hazardous
solar voltage.
Switch 1: Load/Lighting
Switches 2 & 3: System Voltage
Specifications:
Switches 4, 5, & 6: Battery Type Selection
Switch 7: Battery Equalization
Switch 8: Meterbus/MODBUS Settings
Operational Configuration:
Lighting
Normal
PSMPPT25
NominalBatteryVoltage 12/24V
Max.PVOpenCircuitVoltage 120V
NominalMaximumInputPower 350/700W
MaximumBatteryChargingCurrent 25A
RatedLoadCurrent 25A
PSMPPT40
12/24V
120V
560/1120W
40A
30A
©2020MorningstarCorporation.AllRightsReserved.
In the box:
Mounting
Screws(x4)
MountingTemplate
Tools Required:
#2PhilipsScrewdriver
3/16(5mm)&3/32"(2.5mm)FlatheadScrewdriver
Drillwitha1/8"(3mm)bit
*AMenuMapisalsoincludedwithmeteredversions,
butisnotshowninthisguide.
WireBox
RelayDriver(RD1)
RemoteMeter(RM10)
EthernetMeterBus
Converter(EMC1)
Safety Information:
Warning: Shock Hazard
TheProStarMPPTcontrollermustbeinstalledbya
qualifiedtechnicianinaccordancewiththeelectrical
regulationsofthecountryofinstallation.
Warning: Shock Hazard
ThisunitisnotprovidedwithaGFDIdevice.Thischarge
controllermustbeusedwithanexternalGFDIdeviceas
requiredbytheArticle690oftheNationalElectricalCode
fortheinstallationlocation.
IMPORTANT: READtheProStarInstallationManual
forsafetyandregulatoryinformation,instructionson
configurationandoperation,
andwarrantyinformation.
FerriteChokes
PVGroundFaultProtection
(GFPD150VandGFPD600V)
RemoteTemperature
Sensor(RTS)
Scan QR Code to go
directly to the
ProStar MPPT
Installation Manual
and warranty
information online.
Contact Information:
TechnicalSupport:Support.morningstarcorp.com
Phone:12153214457
AUTO 12V
24V
ManualEQ AutoEQ
ProStarChargeController
MODBUSMeterbus
Today’s Battery Voltage
Min12.26V
Max12.84V
SystemVoltage Switch2
Auto OFF
12 OFF
Switch3
OFF
ON
24 ON OFF
Mode Switch1
Normal OFF
Lighting ON
Mode Switch8
Meterbus OFF
MODBUS ON
1Sealed*3Sealed*
4AGM/
Flooded*
5Flooded 6Flooded 7L162Sealed* Custom**
Mode Switch7
ManualEqualization OFF
AutoEqualization ON
WarrantyRegistration:https://www.morningstarcorp.com/productregistration/
FloatCancelVoltage
12.10Volts
FloatExitTimeOut 60minutes
AbsorptionExtensionTime AbsorptionTime+30minutes
AbsorptionExtensionVoltage
12.50Volts
SharedSettings SetPoint
SharedSettings SetPoint
TemperatureCompensationCoEfficient –30millivolts/°C/12Volts
EqualizeTimeOut EqualizeTime+60minutes
DIPSwitch
Setting
BatteryType
Absorption
Stage
(Volts)
Float
State
(Volts)
Equalize
Stage
(Volts)
Absorption
Time
(Minutes)
Equalize
Time
(Minutes)
Equalize
Timeout
(Minutes)
Equalize
Interval
(days)
LVD
(Volts)
LVR
Volts)
4 5 6
OFF OFF OFF 1Sealed* 14.00 13.50 ‐‐‐ 150 ‐‐‐ ‐‐‐ ‐‐‐ 11.5 12.6
OFF OFFON 2Sealed* 14.15 13.50 14.40 150 60 120 28 11.5 12.6
OFFON OFF 3Sealed* 14.30 13.50 14.60 150 60 120 28 11.5 12.6
OFFON ON 4AGM/Flooded* 14.40 13.50 15.10 180 120 180 28 11.5 12.6
ONOFF OFF 5Flooded 14.60 13.50 15.30 180 120 180 28 11.5 12.6
ONOFFON 6Flooded 14.70 13.50 15.40 180 180 240 28 11.5 12.6
ON ONOFF 7L16 15.40 13.40 16.00 180 180 240 14 11.5 12.6
ON ON ON 8Custom**
Custom Custom Custom Custom Custom Custom Custom Custom Custom
*“Sealed”batterytypesincludeGelandAGMBatteries
**Lithiumionandsomeotherbatterytypesrequirecustomprogramming.Morningstarprovidesdownloadablesettingsforselectedbattery
manufacturershere:https://www.morningstarcorp.com/energystoragepartnerprogram/
NOTE:TheProStarMPPTcanbeprogrammedtoaccommodateawiderangeofchargingparameters.
Consultthebatterymanufacturerforoptimalbatterychargingsettings.
ToChangeSettings:
Onmeteredmodels,usetheinterfaceonthemeterorusethesoftwareavailableathttps://www.morningstarcorp.com/msview/.
Onnonmeteredmodels,usethesoftwareavailableathttps://www.morningstarcorp.com/msview/.
SeetheProStarInstallation,Operations,andMaintenanceManualforadditionalinformation/guidance.
MS001538rev.B
DC Load(s)*
32
ProStar MPPT™ Charge Controller
Quick Start Guide
LOAD
SOLAR
BATTERY
+
+
+
RTS
SENSE
GND
DIP
ON
1 2 34 5 6 7 8
6"(15cm)MAXIMUMDistance
fromBattery(+)Terminal
(+)
(–)
(+)
(–)
120VocMaximum
(+)
(–)
Solar Disconnect*
(PV GFP required per
NEC 690)
Photovoltaic (PV) Array
Battery / Battery Bank
Battery Disconnect*
*Fuseorbreakersizingbased
onrequiredwireampacity
DC Load
Disconnect*
(—)Voltage
SenseConductor
Primary Ground
Electrode Conductor
(System Ground)
(+)Voltage
Sense
Conductor
DIP
ON
12345678
DIP Switch Block
(enlarged)
(SeePage4forsettings)
Remote
Temperature
SensorConductor
ChassisGround
DCtoGround
Bond
FerriteChoke
FerriteChoke
FerriteChoke
RJ11
Cable
Fuse
Power UP Sequence:
1. ConnectBattery/BatteryBank.
2. ConnectSolar.
Power DOWN Sequence:
1. DisconnectSolar.
2. DisconnectBattery/BatteryBank.
Mounting:
#2
4.Placethecontrollerontothehangingscrews.
Securethecontrollerinplacewiththeother2screws(3&4).
5. PlacetheWireBox(ifused)belowthecontrollerandsecurein
placeusingit’smountingscrewsinholesA,B,C&D.
1/8"
(3mm)
1. Removethefrontcoverofthechargecontroller.
RemovethefrontcoverfromtheWireBox,ifincluded.
2. UsetheMountingTemplatetopredrillthemountingholes.
a. FortheProStarChargeController:
Drillholes1,2,3,&4.
b. ToincludetheoptionalWireBox:
DrilltheadditionalholesA,B,
C,&D.
3. Placeascrewonwhichtohangthecontrollerinholes1&2.
Backthescrewoutto0.150"or
(3.8mm).
3
4
1
2
A
B
C
D
MountingTemplate
0.150"(3.8mm)offbackplane
[3.8mm]
ScrewHeadHeightfor#1&#2:
DoNOT exceed0.250"(6.4mm)
Minimum
Clearance
Requirements
Caution: Equipment Damage
DonotexposetheProStarCCtoweather.Locatein
adry,protectedareatopreventequipmentdamage.
Ensuretheminimumclearancerequirementsare
followedtoprovideadequateventilationand
preventtheunitfromoverheating.
6"
6"
2"
2"
IMPORTANT: Exampleonly.Actualwiringmayvary.READtheProStar
Installation,Operations,andMaintenanceManualformandatorysafety
requirements.Allconfigurationmustcomplywithlocalandnationalelectric
codes.Consultyourlocalelectricauthoritytoensurecompliance.
Thisillustrationrepresentsatypicaloffgridinstallation.Forusewithan
inverter,refer
totheinverter’sinstallationmanualforadditionalinformation.
RelayDriver
Optional
Accessories
RemoteMeter
EthernetMeterBus
Converter
Negative (–)
Positive (+)
Ground
LEGEND
IMPORTANT:
Ensurethereisonly 1 DCNegativetoGround
Bondintheentiresystem.
NOTE:Theoptionalwireboxisnotshowninthis
illustrationaswiringdoesnotchange.
Communications
Lighting
Security
Industrial
Residential
Battery
(–)
SeetheMorningstarPVStringCalculatorat:
http://stringcalculator.morningstarcorp.com/
Component
PowerTerminals
WireSize
2.5‐16mm
2
/
#14‐6AWG
ToolRequired
3/16"(5mm)
FlatheadScrewdriver
BatteryVoltageSense
0.25‐1.0mm
2
/
#24‐16AWG
3/32"(2.5mm)
FlatheadScrewdriver
OptionalWireBox
#2AWG(Max.)
3/16"(5mm)
FlatheadScrewdriver
CoverScrews
(ProStarorWireBox)
‐‐‐ #2PhilipsScrewdriver
Wiring and Torque Requirements
Torque(Max)
35inlbs.(3.9Nm)
5inlbs.(0.56Nm)
35inlbs.(3.9Nm)
5inlbs.(0.56Nm)
RemoteTemperature
Sensor
(included)
3/32"(2.5mm)
FlatheadScrewdriver
5inlbs.(0.56Nm)
Securinghardware
notshown.
  • Page 1 1
  • Page 2 2

Morningstar Prostar MPPT Quick start guide

Type
Quick start guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI