- 3 -
M985023 (5/19)
OPTIONAL TO FINISHED FLOOR
USUALLY BETWEEN
FINISHED
FLOOR
915mm
(36")
1525mm
(60")
TO
914mm
(36")
2
LEVEL
VERTICAL
CENTER LINE
DRILLED
MOUNTING
HOLES
ROTATE
CLOCKWISE
TO LOCK
LOCK
UNLOCK
LARGE
DIAMETER UP
C/L
6
1 1
1
8
7
3
4
5
5
5
Fig. A Fig. B Fig. C
7
INSTALLATION INSTRUCTIONS
n The SLIDE BAR (1) works best when secured to the wall studs or cross brace using WOOD SCREWS. If mounting into
the studs is not possible, use appropriate wall fasteners provided to secure the installation.
n Mark a vertical center line in the location you wish to install the SLIDE BAR (1). NOTE: The height from the finished floor
is optional. See rough-in drawing for suggested dimensions.
n Determine desired height from the nished oor to the lower support and mark a horizontal center line. Slide the two
WALL ESCUTCHEONS (5) away from the MOUNTING FLANGES (3). Position the SLIDE BAR (1) as shown in Fig. A and
mark the location of the six mounting holes to be drilled. Fig. A. Using a #10 masonry drill, drill six mounting holes
1-1/4” max. deep. Fig. B.
n Install the six ANCHORS (2) provided into the mounting holes. Use a hammer to lightly tap ANCHORS (2) into place.
Make sure they are installed ush against the nished wall. Fig. B.
n Align and place the SLIDE BAR MOUNTING FLANGES (3) over the installed ANCHORS (2). Secure the SLIDE BAR (1)
to the wall with the SCREWS (4) provided. Fig. B.
n Push WALL ESCUTCHEONS (5) against nished wall. Rotate WALL ESCUTCHEONS (5) clockwise to lock into
position. Fig. C.
n Make sure larger diameter side of SPRAY HOLDER (6) is facing upward. If not rotate SPRAY HOLDER (6) 180 dergees.
Rotate the LEVER HANDLE (7) to the unlocked position. Push the SPRAY HOLDER (6) side onto the SLIDE BAR (1).
Push the LEVER HANDLE SIDE (7) over the SPRAY HOLDER ARMS (8) until the two snap together.
n Check operation of SLIDE BAR (1) by rotating HOLDER LEVER (7) and moving HAND SHOWER HOLDER (9) up and down.
Rotate LEVER HANDLE (7) back to lock HAND SHOWER HOLDER (6). Fig. B.