613-002643 Rev. C
x950 Switches
Advanced Layer 3+
AlliedWare Plus™ v5.4.9-1
AT-x950-28XSQ Switch
AT-x950-28XTQm Switch
AT-XEM2-12XT Ethernet Line Card
AT-XEM2-12XTm Ethernet Line Card
AT-XEM2-12XS Ethernet Line Card
AT-XEM2-4QS Ethernet Line Card
AT-XEM2-1CQ Ethernet Line Card
AT-PWR600 AC Power Supply
AT-FAN05 Fan Module
Installation Guide for Virtual Chassis
Stacking
Copyright 2019 Allied Telesis, Inc.
All rights reserved. No part of this publication may be reproduced without prior written permission from Allied Telesis, Inc.
Allied Telesis, VCStack, and the Allied Telesis logo are trademarks of Allied Telesis, Incorporated. All other product names, company
names, logos or other designations mentioned herein are trademarks or registered trademarks of their respective owners.
Allied Telesis, Inc. reserves the right to make changes in specifications and other information contained in this document without prior
written notice. The information provided herein is subject to change without notice. In no event shall Allied Telesis, Inc. be liable for
any incidental, special, indirect, or consequential damages whatsoever, including but not limited to lost profits, arising out of or related
to this manual or the information contained herein, even if Allied Telesis, Inc. has been advised of, known, or should have known, the
possibility of such damages.
3
Electrical Safety and Emissions Standards
This product meets the following standards.
Electrical Safety: UL 60950-1 (
C
UL
US
), EN 60825-1 (TUV), EN 60925-1 (TUV)
U.S. Federal Communications Commission
Radiated Energy
Note: This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15
of FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the
equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency
energy and, if not installed and used in accordance with this instruction manual, may cause harmful interference to radio
communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case
the user will be required to correct the interference at his own expense.
Note: Modifications or changes not expressly approved of by the manufacturer or the FCC, can void your right to operate
this equipment.
Industry Canada
This Class A digital apparatus complies with Canadian ICES-003.
Cet appareil numérique de la classe A est conforme à la norme NMB-003 du Canada.
Warning: In a domestic environment this product may cause radio interference in which case
the user may be required to take adequate measures.
EMI (Emissions) FCC Class A
CISPR 22 Class A
EN 55032 Class A
VCCI Class A
ICES-003 Class A
RCM
EAC Certification
EMC (Immunity) EN 55024
EN 61000-3-2
EN 61000-3-3
Electrical and Laser Safety UL 60950-1 (
C
UL
US
)
EN 60925-1 (TUV)
EN 60825-1
RoHS RoHS6
Laser Safety EN60825-1
4
Translated Safety Statements
Important: Safety statements that have the symbol are translated into multiple languages in the
Translated Safety Statements document at www.alliedtelesis.com/library.
Remarque: Les consignes de sécurité portant le symbole sont traduites dans plusieurs langues
dans le document Translated Safety Statements, disponible à l'adresse www.alliedtelesis.com/
library.
5
Preface ...............................................................................................................................................................................13
Document Conventions .......................................................................................................................................................14
Contacting Allied Telesis .....................................................................................................................................................15
Chapter 1: Overview ........................................................................................................................................................ 17
x950 Switches .....................................................................................................................................................................18
Features ..............................................................................................................................................................................20
Hardware Features.......................................................................................................................................................20
XEM2 Ethernet Line Cards...........................................................................................................................................20
Management Software and Interfaces .........................................................................................................................21
Management Methods..................................................................................................................................................21
Management Panel ......................................................................................................................................................21
Power Supplies ............................................................................................................................................................21
Ports 1 to 24 on the AT-x950-28XSQ Switch......................................................................................................................22
SFP and SFP+ Transceivers........................................................................................................................................22
LEDs.............................................................................................................................................................................23
Ports 1 to 24 on the AT-x950-28XTQm Switch....................................................................................................................24
Cable Requirements.....................................................................................................................................................24
LEDs.............................................................................................................................................................................25
Ports 25 to 37......................................................................................................................................................................26
QSFP28 Transceivers..................................................................................................................................................26
QSFP+ Transceivers....................................................................................................................................................26
Breakout Cables...........................................................................................................................................................26
LEDs.............................................................................................................................................................................27
Port Numbering ............................................................................................................................................................28
XEM2 Ethernet Line Cards..................................................................................................................................................30
AT-XEM2-12XT Line Card...................................................................................................................................................32
RJ-45 Ports ..................................................................................................................................................................32
LEDs.............................................................................................................................................................................33
AT-XEM2-12XTm Line Card................................................................................................................................................34
AT-XEM2-12XS Line Card...................................................................................................................................................36
Transceivers.................................................................................................................................................................36
LEDs.............................................................................................................................................................................37
AT-XEM2-4QS Line Card....................................................................................................................................................38
Transceivers.................................................................................................................................................................38
LEDs.............................................................................................................................................................................38
AT-XEM2-1CQ Line Card....................................................................................................................................................40
Transceivers.................................................................................................................................................................40
LEDs.............................................................................................................................................................................40
Management Panel .............................................................................................................................................................42
USB Port ......................................................................................................................................................................42
NET MGMT Ethernet Management Port......................................................................................................................43
Console (RS-232) Port.................................................................................................................................................44
Switch ID LED..............................................................................................................................................................44
eco-friendly Button .......................................................................................................................................................45
Optional Direct Attach Cables..............................................................................................................................................46
AT-PWR600 Power Supply .................................................................................................................................................47
LEDs.............................................................................................................................................................................48
AT-FAN05 Cooling Fan.......................................................................................................................................................49
Contents
Contents
6
Designating Ports in the Command Line Interface ............................................................................................................. 50
Software and Hardware Releases...................................................................................................................................... 52
Chapter 2: Virtual Chassis Stacking ..............................................................................................................................53
Overview............................................................................................................................................................................. 54
Stacking Guidelines............................................................................................................................................................ 55
Stack Trunks....................................................................................................................................................................... 56
Ports 1 to 24................................................................................................................................................................ 56
Ports 25 to 37 with 40Gbps Transceivers.................................................................................................................... 60
Ports 25 to 37 with 100Gbps Transceivers.................................................................................................................. 61
XEM2 Line Cards ........................................................................................................................................................ 63
Unsupported Trunks.................................................................................................................................................... 65
Master and Member Switches............................................................................................................................................ 69
Selection of the Master Switch.................................................................................................................................... 69
Switch ID Numbers............................................................................................................................................................. 70
Optional Feature Licenses.................................................................................................................................................. 71
Planning a Stack................................................................................................................................................................. 72
Stack Worksheet................................................................................................................................................................. 73
Chapter 3: Beginning the Installation ............................................................................................................................77
Reviewing Safety Precautions............................................................................................................................................ 78
Installation Options............................................................................................................................................................. 83
Choosing a Site for the Chassis.......................................................................................................................................... 84
Unpacking the Switch ......................................................................................................................................................... 85
Verifying the Accessory Kit................................................................................................................................................. 89
Unpacking the AT-PWR600 AC Power Supply................................................................................................................... 91
Chapter 4: Installing Power Supplies and Optional XEM2 Line Card .........................................................................95
Installing AT-PWR600 AC Power Supplies......................................................................................................................... 96
Installing an Optional XEM2 Ethernet Line Card .............................................................................................................. 100
Chapter 5: Installing the Switch on a Table .................................................................................................................105
Chapter 6: Installing the Switch in an Equipment Rack .............................................................................................109
Beginning the Installation.................................................................................................................................................. 110
Required Items.......................................................................................................................................................... 110
Switch Orientations in the Equipment Rack............................................................................................................... 110
Removing the Bumper Feet.............................................................................................................................................. 112
Installing the Switch.......................................................................................................................................................... 113
Chapter 7: Installing the Switch on a Wall ...................................................................................................................117
Switch Orientations on a Wall........................................................................................................................................... 118
Recommended Minimum Wall Area Dimensions.............................................................................................................. 119
Plywood Base for a Wall with Wooden Studs................................................................................................................... 121
Installation Guidelines....................................................................................................................................................... 123
Tools and Material..................................................................................................................................................... 123
Installing the Plywood Base.............................................................................................................................................. 125
Installing the Switch on the Plywood Base ....................................................................................................................... 126
Installing the Switch on a Concrete Wall........................................................................................................................... 129
Chapter 8: Configuring the Master Switch ..................................................................................................................133
Command Summary......................................................................................................................................................... 134
PLATFORM PORTMODE INTERFACE.................................................................................................................... 134
STACKPORT............................................................................................................................................................. 135
STACK ENABLE ....................................................................................................................................................... 135
STACK PRIORITY..................................................................................................................................................... 136
STACK RENUMBER................................................................................................................................................. 136
SWITCH PROVISION................................................................................................................................................ 136
Powering On a Switch....................................................................................................................................................... 138
Starting a Local Management Session............................................................................................................................. 141
General Steps for the Master Switch................................................................................................................................ 143
Configuring the Master Switch - Part I.............................................................................................................................. 145
Configuring the Master Switch - Part II............................................................................................................................. 148
AT-x950-28XSQ Switch and VCStack Installation Guide
7
Verifying the Master Switch...............................................................................................................................................151
What to Do Next................................................................................................................................................................153
Chapter 9: Configuring Member Switches ..................................................................................................................155
General Steps for Member Switches.................................................................................................................................156
Configuring a Member Switch - Part I................................................................................................................................158
Configuring a Member Switch - Part II...............................................................................................................................161
Verifying a Member Switch................................................................................................................................................163
What to Do Next................................................................................................................................................................165
Chapter 10: Powering On and Verifying the Stack ..................................................................................................... 167
Powering on the Stack.......................................................................................................................................................168
Verifying the Stack.............................................................................................................................................................169
Chapter 11: Cabling the Networking Ports .................................................................................................................. 171
Cabling Twisted Pair Ports ................................................................................................................................................172
Guidelines to Handling Twisted Pair or Fiber Optic Transceivers .....................................................................................173
Installing Transceivers.......................................................................................................................................................174
Installing Direct Attach Cables...........................................................................................................................................180
Chapter 12: Replacing Modules ................................................................................................................................... 183
Replacing XEM2 Ethernet Line Cards...............................................................................................................................184
Replacing PWR600 AC Power Supplies ...........................................................................................................................189
Replacing FAN05 Modules................................................................................................................................................194
Removing Fan Modules .............................................................................................................................................194
Installing Fan Modules ...............................................................................................................................................196
Chapter 13: Troubleshooting ........................................................................................................................................ 199
Appendix A: Technical Specifications ......................................................................................................................... 205
Physical Specifications......................................................................................................................................................206
Environmental Specifications.............................................................................................................................................208
Power Specifications.........................................................................................................................................................209
Certifications......................................................................................................................................................................212
RJ-45 Twisted Pair Port Pinouts on the AT-XEM2-12XT and AT-XEM2-12XTm Line Cards............................................213
RJ-45 Style Serial Console Port Pinouts...........................................................................................................................214
Contents
8
9
Figure 1: Front Panels of the x950 Switches........................................................................................................................18
Figure 2: Rear Panel of the x950 Switches ..........................................................................................................................19
Figure 3: Link and Activity LEDs for Ports 1 to 24................................................................................................................23
Figure 4: Link and Activity LEDs for Ports 1 to 24 on the AT-x950-28XTQm Switch ...........................................................25
Figure 5: QSFP-4SFP10G-3CU or QSFP-4SFP10G-5CU Copper Breakout Cable ............................................................26
Figure 6: ET3-MPO08-4LC-5 or ET3-MPO08-4LC-10 Fiber Optic Breakout Cable.............................................................27
Figure 7: LEDs for Ports 25 to 37.........................................................................................................................................27
Figure 8: XEM2 Ethernet Line Cards....................................................................................................................................30
Figure 9: AT-XEM2-12XT Line Card.....................................................................................................................................32
Figure 10: AT-XEM2-12XTm Line Card................................................................................................................................34
Figure 11: AT-XEM2-12XS Line Card..................................................................................................................................36
Figure 12: AT-XEM2-4QS Line Card....................................................................................................................................38
Figure 13: AT-XEM2-1CQ Line Card....................................................................................................................................40
Figure 14: Management Panel .............................................................................................................................................42
Figure 15: Switch ID LED with the eco-friendly Mode Disabled ...........................................................................................44
Figure 16: Switch ID LED with the eco-friendly Mode Enabled............................................................................................45
Figure 17: AT-PWR600 Power Supply.................................................................................................................................47
Figure 18: AT-FAN05 Fan Module........................................................................................................................................49
Figure 19: PORT Parameter in the Command Line Interface...............................................................................................50
Figure 20: Slot Numbers for Port Numbering .......................................................................................................................50
Figure 21: Example Stacks of AT-x950-28XSQ Switches with Trunks of 10Gbps Ports......................................................58
Figure 22: Example Stacks of AT-x950-28XTQm Switches with Trunks of 10Gbps Ports...................................................59
Figure 23: Example Stacks of Two Switches with Trunk Ports 25 to 37 and 40Gbps Links.................................................60
Figure 24: Example Stacks of Three or Four Switches with Trunk Ports 25 to 37 and 40Gbps Links .................................61
Figure 25: Example Stacks with Trunks Ports 33 to 37 and 100Gbps Links.........................................................
...............62
Figure 26: Example Trunk Using AT-XEM2-12XT Line Cards .............................................................................................63
Figure 27: Example Trunk Using AT-XEM2-12XS Line Cards.............................................................................................64
Figure 28: Example Trunk Using AT-XEM2-4QS Line Cards...............................................................................................64
Figure 29: Unsupported Trunk with Different Numbers of Links Between Switches ............................................................65
Figure 30: Unsupported Trunk with Mixed Cables................................................................................................................65
Figure 31: Unsupported Trunk with Both Base and XEM2 Line Card Ports.........................................................................66
Figure 32: Unsupported Trunk of Connected Base and Line Card Ports.............................................................................66
Figure 33: Unsupported Trunk with Only One Link Between Switches................................................................................67
Figure 34: Unsupported Trunk with Different Port Speeds...................................................................................................67
Figure 35: Not Recommended Stack Trunk of AT-XEM2-1CQ Line Cards..........................................................................67
Figure 36: Unsupported Trunk with a 10Gbps Breakout Cable............................................................................................68
Figure 37: Unsupported Trunk with Intermediary Network Devices .....................................................................................68
Figure 38: Installation Options..............................................................................................................................................83
Figure 39: Removing Accessories........................................................................................................................................85
Figure 40: Removing the Shipping Partition.........................................................................................................................86
Figure 41: Lifting the Switch from the Shipping Box.............................................................................................................87
Figure 42: Removing the Switch from the Shipping End-caps and Protective Bag..............................................................87
Figure 43: Accessory Kit.......................................................................................................................................................89
Figure 44: Removing the Power Cord and Documents from the AT-PWR600 AC Power Supply........................................91
Figure 45: Removing the Partition from the AT-PWR600 AC Power Supply Shipping Box .................................................92
Figure 46: Removing the Power Supply from the Shipping Box...........................................................................................93
Figure 47: Removing the Power Supply from the Shipping End-caps and Protective Bag ..................................................93
Figure 48: Removing the Blank Power Supply Panel from Slot PSU B................................................................................97
Figure 49: Sliding the AT-PWR600 AC Power Supply into the Switch.................................................................................98
Figures
Figures
10
Figure 50: Seating the Power Supply on the Internal Connector..........................................................................................99
Figure 51: Removing the Blank Line Card Cover ...............................................................................................................100
Figure 52: Removing the Ethernet Line Card from the Anti-static Bag...............................................................................101
Figure 53: Sliding the Ethernet Line Card into the Slot.......................................................................................................101
Figure 54: Seating the Ethernet Line Card in the Expansion Slot.......................................................................................102
Figure 55: Tightening the Two Captive Screws on the Ethernet Line Card........................................................................103
Figure 56: Parts of the Bumper Feet...................................................................................................................................105
Figure 57: Holes for Bumper Feet.......................................................................................................................................106
Figure 58: Inserting the Rivet Housing into the Bumper Foot.............................................................................................106
Figure 59: Placing the Bumper Foot on a Base Corner Hole..............................................................................................107
Figure 60: Inserting the Rivet into the Bumper Foot...........................................................................................................107
Figure 61: Bracket Holes on the Switch..............................................................................................................................110
Figure 62: Switch Orientations in an Equipment Rack........................................................................................................111
Figure 63: Removing the Bumper Feet...............................................................................................................................112
Figure 64: Attaching the Equipment Rack Brackets ...........................................................................................................114
Figure 65: Installing the Switch in an Equipment Rack.......................................................................................................114
Figure 66: Positions of the Switch on the Wall....................................................................................................................118
Figure 67: Minimum Wall Area Dimensions with the Front Panel on the Left.....................................................................119
Figure 68: Minimum Wall Area Dimensions with the Front Panel on the Right..................................................................120
Figure 69: Switch on the Wall with a Plywood Base...........................................................................................................121
Figure 70: Steps to Installing the Switch with a Plywood Base...........................................................................................122
Figure 71: Installing the Brackets to the Switch for Wall Installation...................................................................................126
Figure 72: Attaching the Switch to the Plywood Base ........................................................................................................127
Figure 73: Marking the Locations of the Bracket Holes on a Concrete Wall.......................................................................130
Figure 74: Installing the Switch on a Concrete Wall ...........................................................................................................131
Figure 75: Connecting the AC Power Cord.........................................................................................................................138
Figure 76: Securing the Power Cord with the Restraining Strap ........................................................................................139
Figure 77: Connecting the Power Cord to an AC Power Source........................................................................................139
Figure 78: Connecting the Management Cable to the Console RS-232 Port.....................................................................141
Figure 79: User Exec Mode Prompt...............................................................................................
.....................................142
Figure 80: Powering Off the Switch....................................................................................................................................153
Figure 81: SHOW STACK Command.................................................................................................................................169
Figure 82: Handle on 100Gbps Transceivers for AT-XEM2-1CQ Line Cards ....................................................................173
Figure 83: SP10T Transceivers..........................................................................................................................................175
Figure 84: Installing an SFP or SFP+ Transceiver .............................................................................................................177
Figure 85: Installing 40Gbps Fiber Optic Transceivers in AT-XEM2-4QS Line Cards........................................................178
Figure 86: Installing 100Gbps QSFP28 Transceivers in Base Ports 25, 29, 33, 37...........................................................178
Figure 87: Installing 100Gbps QSFP28 Transceivers in AT-XEM2-1CQ Line Cards.........................................................179
Figure 88: Installing SP10TW Direct Attach Cables ...........................................................................................................180
Figure 89: Attaching QSFPCU Cables................................................................................................................................181
Figure 90: Loosening the Screws on the Ethernet Line Card.............................................................................................185
Figure 91: Disconnecting an Ethernet Line Card from the Switch......................................................................................186
Figure 92: Sliding an Ethernet Line Card from the Switch..................................................................................................186
Figure 93: Placing the Ethernet Line Card in its Anti-static Bag.........................................................................................187
Figure 94: Installing the Line Card Blank Cover .................................................................................................................187
Figure 95: Tightening the Two Screws on the Line Card Blank Panel................................................................................188
Figure 96: Disconnecting the AC Power Cord from the Power Source ..............................................................................189
Figure 97: Opening the Restraining Strap on the Power Supply........................................................................................190
Figure 98: Disconnecting the Power Cord from the Power Supply.....................................................................................190
Figure 99: Removing the Power Supply .............................................................................................................................191
Figure 100: Removing a Power Supply..............................................................................................................................192
Figure 101: Installing the Blank Power Supply Cover............................................................................
.............................193
Figure 102: Loosening the Screws on the Fan Module ......................................................................................................194
Figure 103: Disconnecting the FAN05 Module from the Switch .........................................................................................195
Figure 104: Sliding the Fan Module from the Switch..........................................................................................................195
Figure 105: Removing the Fan Module from the Shipping Container.................................................................................196
Figure 106: Aligning the FAN05 Module in the Switch Slot ................................................................................................197
Figure 107: Seating the FAN05 Module on the Internal Connector....................................................................................197
Figure 108: Tightening the Two Captive Screws on the FAN05 Module............................................................................198
Figure 109: Pin Layout (Front View) of Ports on AT-XEM2-12XT and AT-XEM2-12XTm Line Cards................................213
11
Tables
Table 1: Link and Activity Status LEDs for Ports 1 to 24 .....................................................................................................23
Table 2: Twisted Pair Ports 1 to 24 on the AT-x950-28XTQm Switch .................................................................................24
Table 3: Link and Activity LEDs for Ports 1 to 24 on the AT-x950-28XTQm Switch ............................................................25
Table 4: Link and Activity Status LEDs for 40Gbps QSFP+ or 100Gbps QSFP28 Transceivers ........................................27
Table 5: Link and Activity Status LEDs for 10Gbps Breakout Cables .................................................................................28
Table 6: Port Numbering for Ports 25 to 37 .........................................................................................................................29
Table 7: XEM2 Ethernet Line Cards ....................................................................................................................................30
Table 8: Twisted Pair Ports on the AT-XEM2-12XT Line Card ............................................................................................32
Table 9: Port Link and Activity LEDs on the AT-XEM2-12XT Line Card .............................................................................33
Table 10: Twisted Pair Ports on the AT-XEM2-12XTm Line Card .......................................................................................34
Table 11: Link and Activity LEDs on the AT-XEM2-12XTm Line Card ................................................................................35
Table 12: Port Link and Activity LEDs on the AT-XEM2-12XS Line Card ...........................................................................37
Table 13: Port Link and Activity Status LEDs on the AT-XEM2-4QS Line Card ..................................................................39
Table 14: Link and Activity Status LEDs for 10Gbps Breakout Cables ...............................................................................39
Table 15: Port Link and Activity Status LED on the AT-XEM2-1CQ Line Card ...................................................................40
Table 16: NET MGMT Port LED ..........................................................................................................................................43
Table 17: Optional Direct Attach Cables ..............................................................................................................................46
Table 18: LEDs on the AT-PWR600 Power Supply .............................................................................................................48
Table 19: PORT Parameter Format .....................................................................................................................................50
Table 20: Software and Hardware Releases ......................................................................................................................52
Table 21: Maximum Number of Trunk Ports Per XEM2 Line Card ......................................................................................63
Table 22: Stacking Worksheet .............................................................................................................................................73
Table 23: Stacking Worksheet Columns ..............................................................................................................................74
Table 24: Example of a Completed Stack Worksheet .........................................................................................................75
Table 25: Configuring the Master Switch - Part I ...............................................................................................................145
Table 26: Configuring the Master Switch- Part II ...............................................................................................................148
Table 27: Verifying the Master Switch ...............................................................................................................................151
Table 28: Configuring a Member Switch - Part I ................................................................................................................158
Table 29: Configuring a Member Switch - Part II ...............................................................................................................161
Table 30: Verifying a Member Switch ................................................................................................................................163
Table 31: Transceivers for the Base Transceiver Slots .....................................................................................................174
Table 32: Transceivers for XEM2 Ethernet Line Cards .....................................................................................................175
Table 33: Product Dimensions ...........................................................................................................................................206
Table 34: Product Weights ................................................................................................................................................206
Table 35: Ventilation Requirements ...................................................................................................................................207
Table 36: Environmental Specifications .............................................................................................................................208
Table 37: Maximum Power Consumptions (Watts) ...........................................................................................................209
Table 38: Typical Power Savings in eco-friendly Mode (Watts) ........................................................................................209
Table 39: Input Voltages ....................................................................................................................................................210
Table 40: Maximum Power Supply Efficiency (Based on 100V Input Voltage) .................................................................210
Table 41: Heat Dissipations (British Thermal Units/Hour) .................................................................................................210
Table 42: Product Certifications .........................................................................................................................................212
Table 43: Pin Signals for AT-XEM2-12XT and AT-XEM2-12XTm Line Cards ..................................................................213
Table 44: RJ-45 Style Serial Console Port Pin Signals .....................................................................................................214
Tables
12
13
Preface
This guide contains the installation instructions for the x950 Series of
advanced Layer 3+ Ethernet switches. The instructions explain how to
build a virtual stack of up to four units with the Virtual Chassis Stacking
(VCStack) feature. For instructions on how to install the switches as stand-
alone devices, refer to the x950 Series Installation Guide for Stand-alone
Switches.
This preface contains the following sections:
“Document Conventions” on page 14
“Contacting Allied Telesis” on page 15
Preface
14
Document Conventions
This document uses the following conventions:
Note
Notes provide additional information.
Caution
Cautions inform you that performing or omitting a specific action
may result in equipment damage or loss of data.
Warning
Warnings inform you that performing or omitting a specific action
may result in bodily injury.
x950 Series Installation Guide for VCStack
15
Contacting Allied Telesis
For assistance with this product, you may contact Allied Telesis technical
support by going to the Support & Services section of the Allied Telesis
web site at www.alliedtelesis.com/support. The page has links to the
following services:
24/7 Online Support — Enter our interactive support center to
search for answers to your product questions in our knowledge
database, to check support tickets, to learn about RMAs, and to
contact Allied Telesis technical experts.
USA and EMEA phone support — Select the phone number that
best fits your location and customer type.
Hardware warranty information — Learn about Allied Telesis
warranties and register your product online.
Replacement Services — Submit a Return Merchandise
Authorization (RMA) request via our interactive support center.
Documentation — View the most recent installation and user
guides, software release notes, white papers, and data sheets for
your products.
Software Downloads — Download the latest software releases for
your managed products.
For sales or corporate information, go to www.alliedtelesis.com/contact
and select your region.
Preface
16
17
Chapter 1
Overview
The chapter contains the following sections:
“x950 Switches” on page 18
“Features” on page 20
“Ports 1 to 24 on the AT-x950-28XSQ Switch” on page 22
“Ports 1 to 24 on the AT-x950-28XTQm Switch” on page 24
“Ports 25 to 37” on page 26
“XEM2 Ethernet Line Cards” on page 30
“AT-XEM2-12XT Line Card” on page 32
“AT-XEM2-12XTm Line Card” on page 34
“AT-XEM2-12XS Line Card” on page 36
“AT-XEM2-4QS Line Card” on page 38
“AT-XEM2-1CQ Line Card” on page 40
“Management Panel” on page 42
“Optional Direct Attach Cables” on page 46
“AT-PWR600 Power Supply” on page 47
“AT-FAN05 Cooling Fan” on page 49
“Designating Ports in the Command Line Interface” on page 50
“Software and Hardware Releases” on page 52
Chapter 1: Overview
18
x950 Switches
The front panels of the switches are shown in Figure 1.
Figure 1. Front Panels of the x950 Switches
The rear panel is shown in Figure 2 on page 19.
XEM2 Line Card
Expansion Slot
Ports 25, 29, 33, 37:
40Gbps or 100Gbps
Transceivers, or
10Gbps Breakout Cables
Management
Panel
Ports 1 to 24:
1Gbps SFP or 10Gbps
SFP+ Transceivers
XEM2 Line Card
Expansion Slot
Ports 25, 29, 33, 37:
40Gbps or 100Gbps
Transceivers, or
10Gbps Breakout Cables
Management
Panel
Ports 1 to 24:
100Mbps, 1/2.5/5/10Gbps
Twisted Pair
AT-x950-28XTQm Switch
AT-x950-28XSQ Switch
x950 Series Installation Guide for VCStack
19
Figure 2. Rear Panel of the x950 Switches
Two AT-FAN05 Cooling Fan
Modules
Two Slots for AT-PWR600
Power Supply Modules
Chapter 1: Overview
20
Features
The main hardware features of the x950 Switches are listed here.
Hardware
Features
The switches have the following hardware features:
1RU height
24 ports on the AT-x950-28XSQ Switch for 1Gbps SFP or 10Gbps
SFP+ transceivers. Refer to “Ports 1 to 24 on the AT-x950-28XSQ
Switch” on page 22.
24 twisted pair ports on the AT-x950-28XTQm Switch with speeds
of 1/2.5/5/10Gbps. Refer to “Ports 1 to 24 on the AT-x950-
28XTQm Switch” on page 24.
Four ports for 40Gbps QSFP+ or 100Gbps QSFP28 transceivers,
or 10Gbps breakout cables. Refer to “Ports 25 to 37” on page 26.
One expansion slot for an optional XEM2 Ethernet line card. Refer
to “XEM2 Ethernet Line Cards” on page 30.
The switches supports two power supplies for primary and
redundant power. Refer to “AT-PWR600 Power Supply” on
page 47.
The units come with two pre-installed fan modules. Refer to “AT-
FAN05 Cooling Fan” on page 49.
The switches come with brackets for standard 19-inch equipment
racks or wall installation.
The XEM2 Ethernet line cards, power supplies, and fan modules
are hot-swappable.
XEM2 Ethernet
Line Cards
The XEM2 Ethernet line cards are listed here:
AT-XEM2-12XT Card features 12 twisted pair ports with speeds of
100Mbps and 1/10Gbps, and RJ-45 connectors. Refer to “AT-
XEM2-12XT Line Card” on page 32.
AT-XEM2-12XTm Card features 12 twisted pair ports with speeds
of 100Mbps and 1/2.5/5/10Gbps, and RJ-45 connectors. Refer to
“AT-XEM2-12XTm Line Card” on page 34.
AT-XEM2-12XS Card features 12 ports for 1Gbps SFP or 10Gbps
SFP+ transceivers. Refer to “AT-XEM2-12XS Line Card” on
page 36.
AT-XEM2-4QS Card features four ports for 40Gbps QSFP+
transceivers. Refer to “AT-XEM2-4QS Line Card” on page 38.
AT-XEM2-1CQ Card features one port for the 100Gbps QSFP28
transceiver. Refer to “AT-XEM2-1CQ Line Card” on page 40.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176
  • Page 177 177
  • Page 178 178
  • Page 179 179
  • Page 180 180
  • Page 181 181
  • Page 182 182
  • Page 183 183
  • Page 184 184
  • Page 185 185
  • Page 186 186
  • Page 187 187
  • Page 188 188
  • Page 189 189
  • Page 190 190
  • Page 191 191
  • Page 192 192
  • Page 193 193
  • Page 194 194
  • Page 195 195
  • Page 196 196
  • Page 197 197
  • Page 198 198
  • Page 199 199
  • Page 200 200
  • Page 201 201
  • Page 202 202
  • Page 203 203
  • Page 204 204
  • Page 205 205
  • Page 206 206
  • Page 207 207
  • Page 208 208
  • Page 209 209
  • Page 210 210
  • Page 211 211
  • Page 212 212
  • Page 213 213
  • Page 214 214

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI