Skov DA 10K Tunnel Inlet Mounting Guide

  • Hello! I've reviewed the SKOV DA 10K Tunnel Inlet Mounting Guide and I'm ready to assist you. This document provides detailed instructions on how to install the tunnel inlet, including mounting the frame, installing the pulling mechanisms, and mounting a bird net and insulation plate. Feel free to ask me any questions about the installation process or the product's features.
  • What type of ventilation is the DA 10K tunnel inlet designed for?
    Can the DA 10K tunnel inlet be mounted in any wall?
    In which direction can the inlet flaps open?
    What is the purpose of the DA 10K insulation plate?
DA 10K Tunnel Inlet
Mounting Guide
612941 • 2022-08-05
English For other language variants of this document we refer to:
Español Para otras variantes del idioma de este documento, visite:
Français Pour les versions dans d'autres langues de ce document veuillez consulter:
http://docs.skov.com/1189
DA 10K Tunnel Inlet
2 Mounting Guide
Product and Documentation Changes
SKOV A/S reserves the right to change this document and the product herein described without further notice.
In case of doubt, please contact SKOV A/S.
The date of change appears from the front and back pages.
Note
All rights belong to SKOV A/S. No part of this manual may be reproduced in any manner whatsoever without
the expressed written permission of SKOV A/S in each case.
All reasonable efforts have been made to ensure the accuracy of the information contained in this manual.
Should any mistakes or imprecise information occur in spite of this, SKOV A/S would appreciate being noti-
fied thereof.
Irrespective of the above, SKOV A/S shall not accept any liability with regard to loss or damage caused or
alleged to be caused by reliance on any information contained herein.
Copyright by SKOV A/S.
DA 10K Tunnel Inlet
1 Product description ....................................................................................................................................... 4
2 Product survey ............................................................................................................................................... 5
3 Mounting guide............................................................................................................................................... 8
3.1 Recommended tools.................................................................................................................. 8
3.2 Wall inlet positioning................................................................................................................. 9
3.3 Mounting of tunnel inlet ............................................................................................................ 9
3.3.1 Preparing hole in wall................................................................................................................... 9
3.3.2 Mounting in wall ......................................................................................................................... 11
3.3.3 Check the tightness ................................................................................................................... 12
3.3.4 Foaming ..................................................................................................................................... 14
3.3.5 Jointing....................................................................................................................................... 14
3.4 Mounting tunnel inlet parts..................................................................................................... 15
3.4.1 Coupling rod............................................................................................................................... 16
3.4.2 Toggle joints............................................................................................................................... 17
3.4.3 Wheel set ................................................................................................................................... 18
3.4.4 Bracket for single pull................................................................................................................. 18
3.4.5 Brackets for pull rod ................................................................................................................... 19
3.4.6 Pull rod....................................................................................................................................... 19
3.4.7 Clip for pull rod........................................................................................................................... 20
3.4.8 Coil spring .................................................................................................................................. 20
3.4.9 String.......................................................................................................................................... 21
3.5 Mounting of pulling system above the tunnel inlet .............................................................. 22
3.5.1 Support bracket for pulling system............................................................................................. 22
3.5.2 Wall inlet bracket for pull rod...................................................................................................... 24
3.5.3 String on Support Bracket and Wall Inlet Bracket...................................................................... 25
3.5.4 Clip on Pull Rod Above Inlet ...................................................................................................... 26
3.5.5 Coil spring over inlet .................................................................................................................. 26
3.6 Mounting of bird net ................................................................................................................ 27
3.7 Installation examples............................................................................................................... 28
3.7.1 Pull for 1 row of inlets (flaps open downwards) ......................................................................... 28
3.7.2 Pull for 1 row of inlets (flaps open upwards) .............................................................................. 30
3.7.3 Pull for 2 rows of inlets............................................................................................................... 31
4 Maintenance.................................................................................................................................................. 32
4.1 Recycling/Disposal .................................................................................................................. 32
5 Technical data .............................................................................................................................................. 33
5.1 Dimensioned sketch ................................................................................................................ 34
Mounting Guide
DA 10K Tunnel Inlet
4 Mounting Guide
1 Product description
DA 10K tunnel inlet is used as an air inlet in houses with Tunnel ventilation or Combi-Tunnel ventilation.
The tunnel inlet can be mounted directly in interior walls or exterior walls.
The tunnel inlet can be turned so that the inlet flaps open downwards or upwards.
The tunnel inlet is available both with high-insulated inlet flaps made from PVC (polyvinyl chloride) with insula-
tion and with semi-insulated inlet flaps made from PVC (polyvinyl chloride).
The inlet is delivered with the inlet flaps installed. Regulation set is installed on-site.
Opening range into the house is 370 mm.
Figure1: Drawing of tunnel inlet in 1 row.
Figure2: Drawing of tunnel inlet in 2 rows.
DA 10K Tunnel Inlet
Mounting Guide 5
2 Product survey
433707 DA 10K tunnel inlet, highly insulated
DA 10K tunnel inlet with high insulating property is used for mounting on a
wall where insulation is required.
The mounting parts are used for assembling the tunnel inlet.
433708 DA 10K tunnel inlet, semi-insulated
DA 10K is used for mounting in walls with a minimum outside temperature
over 5°C and where insulation is not necessary.
The mounting parts are used for assembling the tunnel inlet.
DA 10K Tunnel Inlet
6 Mounting Guide
433713 DA 10K tunnel inlet, transparent
DA 10K transparent is used for installation in walls where insulation is not
necessary.
DA 10K transparent can be used in areas where it is desirable for both an
inlet feature and light in the livestock house.
The mounting parts are used for assembling the tunnel inlet.
433710 Wall inlet bracket for pull rod
The bracket is used when the tunnel inlet is mounted inside the house, and
a pulling system above the inlet is requested, contrary to the normal posi-
tion below the inlet.
2 per inlet.
433711 Tunnel inlet, support bracket
The bracket is used when the tunnel inlet is mounted inside the house, and
a pulling system above the inlet is requested, contrary to the normal posi-
tion below the inlet.
1 per inlet
433709 DA 10K tunnel inlet, bird net
Net protects against birds.
Net size = 17x17 mm.
Dimensions = 1350x1006 mm
1 per inlet.
DA 10K Tunnel Inlet
Mounting Guide 7
433702 Tunnel inlet screw kit
Used for mounting of the tunnel inlet.
Contains 24 4.8x70 tapping screws.
1 sets per inlet.
433719 DA 10K insulation plate
The plate is used to minimize draft and heat loss during cold periods, when
DA 10K is not in use.
The plate should always be used if the dimensioned outside temperature is
less than -10°C.
Supplied with mounting set and mounting guide.
1 per inlet.
DA 10K Tunnel Inlet
8 Mounting Guide
3 Mounting guide
Check that the parts ordered are present and undamaged before starting work. Please read through the entire
guide before starting assembly and fitting.
Avoid any impact when handling the inlet.
3.1 Recommended tools
A list of tools recommended for the installation of the tunnel inlet can be seen below.
Item Description
Cordless drill
Screwdriver bits
Drill kit
Sealant gun
Hammer
Utility knife
Wedge
Marker pens
Tape measure
Foam gun
Chisel
Ladder
Screwdriver
DA 10K Tunnel Inlet
Mounting Guide 9
Item Description
Allen key
Spirit level
Try square
3.2 Wall inlet positioning
The positioning of the inlet in a wall depends on the layout of the building and the house layout. The positioning
may therefore only be made according to directions communicated by SKOV A/S or representatives of the com-
pany.
3.3 Mounting of tunnel inlet
3.3.1 Preparing hole in wall
Mark out the correct number of holes according to mea-
surements.
Remember always to use a spirit level.
DA 10K Tunnel Inlet
10 Mounting Guide
Make diagonal measurement.
Cut the holes.
DA 10K Tunnel Inlet
Mounting Guide 11
3.3.2 Mounting in wall
Ensure that the inlet is placed in the middle of the hole.
Use wedges to center the inlet in the hole.
Avoid pushing the inlet into place during mounting.
Make sure that the inlet flaps close tightly.
Predrill the holes according to the instructions be-
low
Use a spirit level to ensure that the inlet has a correct
position.
Screw screws into the predrilled holes and mount the in-
let on the wall.
Center mark or 2 mm hole when mounting in a sandwich
panel. Material thickness ≤ 1mm.
4 mm hole when mounting in steel profiles. Material
thickness >1mm ≤ 2mm.
4.5 mm hole when mounting in steel profiles. Material
thickness >2 mm ≤ 4 mm.
Recommended screw: Tapping screw 4.8x70 A2.
Recommended tightening: 5.1 Nm.
Please make sure not to over-tighten the screws as they
are tightened directly against plastic.
Make sure that the internal dimensions are still accord-
ing to the drawing.
DA 10K Tunnel Inlet
12 Mounting Guide
3.3.3 Check the tightness
Press the inlet flaps at both ends.
No gaps = ok.
If there is a gap, use wedges to straighten the frame.
If necessary, use wedges from stacking blocks.
Break off the wedge.
DA 10K Tunnel Inlet
Mounting Guide 13
Loosen the screws and insert wedges behind the inlet
frame until all flaps close tightly.
Retighten the screws.
Check that there are no gaps after attachment, on both
sides, of all inlet flaps.
If there are only gaps with 1 flap it may be because the
flap is twisted.
The flap is corrected by twisting the flap in the opposite
direction.
DA 10K Tunnel Inlet
14 Mounting Guide
3.3.4 Foaming
The excess part of the wedges should be removed before foaming.
Wet the faces with water from a mist sprayer before proceeding with the foaming.
Use a one-component Polyurethane foam to seal the joint around the inlet.
A. Foam the entire depth of the inlet in the corners and approx. 100 mm to each side of the corners.
B. On the middle part of the inlet, it is important to foam the edge only, as the foam may otherwise cause the in-
let to warp.
The inlet from the back
Polyurethane foam
Polyurethane foam
3.3.5 Jointing
For pointing a 1-component elastic joint sealer free of solvents must be used.
C. Apply a sealing edge of joint sealer between the inlet and the wall – both on the inside and the outside.
The inlet from the back
Sealing edge, inside
Sealing edge, outside
DA 10K Tunnel Inlet
Mounting Guide 15
3.4 Mounting tunnel inlet parts
(A)
(B)
(C)
(D) (E)
(F)
(G)
(H)
(A) Coupling rod [}16]
(B) Toggle joints [}17]
(C) Wheel set [}18]
(D) Pull rod [}19]
(E) Bracket for single pull [}18]
(F) Clip for pull rod [}20]
(G) Brackets for pull rod [}19]
(H) String [}21]
DA 10K Tunnel Inlet
16 Mounting Guide
3.4.1 Coupling rod
(C)
(B)
(C)
(C)
(A)
First mount the coupling rods (A), and then coupling rods
(B), on both sides.
Mount clip (C) for the hinge joint.
DA 10K Tunnel Inlet
Mounting Guide 17
3.4.2 Toggle joints
Mount the toggle joint on the right and left sides.
DA 10K Tunnel Inlet
18 Mounting Guide
3.4.3 Wheel set
Mount the wheel set on both sides.
3.4.4 Bracket for single pull
Mount the bracket for single pull opposite the pulling di-
rection. See the marking on the bottom frame of the in-
let.
DA 10K Tunnel Inlet
Mounting Guide 19
3.4.5 Brackets for pull rod
Drill four 3 mm holes.
Mount the bracket for the pull rod in the pulling direction.
3.4.6 Pull rod
Turn the top part of the bracket for the pull rod to sepa-
rate the 2 parts.
Mount the pull rod when all the brackets for the pull rod
have been mounted.
Click the top part of the bracket for the pull rod.
DA 10K Tunnel Inlet
20 Mounting Guide
3.4.7 Clip for pull rod
Add clip firmly to the pull rod, 225 mm from the bracket
for single pull.
3.4.8 Coil spring
Mount coil spring in the opposite direction to the move-
ment.
See documentation for mounting set.
/