Danfoss OVR Override Box Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Danfoss OVR Override Box Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Identification
General Information
INSTRUCTIONS
OVR Override Box
The OVR board is designed for 3” snap track mounting. It
can be mounted (1) inside of a Danfoss I/O enclosure, or
(2) in control panels where codes and good electrical
practice permit.
The OVR enclosure door is hinged on the left side. Install
the box so there is no interference with the door opening.
Each OVR connected to an AKC 55 must have a unique
address starting with 01. Each address switch has an
arrow pointer which is also a screwdriver slot for setting
the address.
4/99 Danfoss Inc. BOVR.499 [OVRInstall]
Up to 95 I/O nodes (OI8, RO8, SI8, AKC 16x Smart Case
Controllers, etc) can be connected to one AKC 55.
A maximum of 5 cable runs (1 shown) can be used to
connect any combination of nodes to the AKC 55.
The total length of all I/O cable runs (including stubs) is
limited to 5000 feet. Use point-to-point (“daisy-chain”
connections between boards.
The last I/O board on each cable run must be terminated.
Terminations are supplied with the AKC 55 controller as
shown.
When necessary, individual I/O boards can be placed on
individual stubs up to a maximum of 25 feet long off a main
cable run.
I/O Network Configuration
/