Huawei BTS3900L LTE Installation guide

Type
Installation guide

This manual is also suitable for

BTS3900L (Ver.C)
Installation Guide
Issue 07
Date 2013-11-08
HUAWEI TECHNOLOGIES CO., LTD.
Copyright © Huawei Technologies Co., Ltd. 2013. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or representations
of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Huawei Technologies Co., Ltd.
Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website: http://www.huawei.com
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
i
About This Document
Purpose
This document describes the procedure for installing a BTS3900L (Ver.C) (referred to as
BTS3900L) cabinet, boards, modules, and cables. It also provides checklists for hardware
installation.
Product Versions
The following table lists the product versions related to this document.
Product Name Product Version
BTS3900L V100R007C00
BTS3900L GSM V100R014C00
BTS3900L WCDMA V200R014C00
BTS3900L LTE V100R005C00
Intended Audience
This document is intended for:
l Base station installation engineers
Organization
1 Changes in BTS3900L (Ver.C) Installation Guide
This chapter describes the changes in BTS3900L (Ver.C) Installation Guide.
2 Preparing for Installation
This section describes the tools and meters that need to be available before the installation. It
also describes the skills and qualifications that the installation engineers must possess.
BTS3900L (Ver.C)
Installation Guide
About This Document
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
ii
3 Information About the Installation
This section provides important notes for the BTS3900L cabinet with -48 V AC power. Before
a cabinet is installed, you must familiar with the cabinet structure, application scenario, and
space requirements. This document describes how to install the BTS3900L cabinet configured
with the RFUs. For details about how to install the BTS3900L cabinet configured with RFUs
and RRUs, see the BTS3900L (RFU+RRU) Installation Guide.
4 Unpacking the Equipment
This chapter describes how to unpack and check the delivered equipment to ensure that all the
materials are included and intact.
5 Obtaining the ESN
This chapter describes how to obtain the Electronic Serial Number (ESN). The ESN is a unique
identifier of a Network Element (NE). Record the ESN for later commissioning of the base
station before installation.
6 Installation Process
The installation procedure mainly involves installing the cabinet and installing cables. In
addition, installing optional modules according to the requirements onsite may also be included
in the installation procedure.
7 Checking Installed Modules and Cables
This section describes how to check the internal modules and cables that are installed before
delivery.
8 Installing the Cabinet
This chapter describes the procedure for installing the BTS3900L cabinet.
9 Installing a PGND Cable
The PGND cable is used to connect the PGND screws on the cabinet and the ground bar to ensure
proper grounding of the cabinet.
10 (Optional) Installing the Modules
The mandatory modules in the cabinet are already installed. The optional modules can be
installed on site according to different field requirements.
11 Installing the Cables
The cables in the BTS3900L cabinet are already installed. You need to install only the cables
led into the cabinet and cables for optional components.
12 Installation Checklist
Check the installation items, installation environment, and cable-related items after the cabinets
and devices are all installed.
13 Powering On the BTS3900L
This section describes how to power on the BTS3900L cabinet and handle the power supply
failure to the components in the cabinet.
BTS3900L (Ver.C)
Installation Guide
About This Document
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
iii
Conventions
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol Description
Indicates an imminently hazardous situation which, if not
avoided, will result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, may result in minor or moderate injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to personal
injury.
Calls attention to important information, best practices and
tips.
NOTE is used to address information not related to personal
injury, equipment damage, and environment deterioration.
General Conventions
The general conventions that may be found in this document are defined as follows.
Convention Description
Times New Roman Normal paragraphs are in Times New Roman.
Boldface Names of files, directories, folders, and users are in
boldface. For example, log in as user root.
Italic Book titles are in italics.
Courier New
Examples of information displayed on the screen are in
Courier New.
Command Conventions
The command conventions that may be found in this document are defined as follows.
BTS3900L (Ver.C)
Installation Guide
About This Document
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
iv
Convention Description
Boldface The keywords of a command line are in boldface.
Italic Command arguments are in italics.
[ ] Items (keywords or arguments) in brackets [ ] are optional.
{ x | y | ... } Optional items are grouped in braces and separated by
vertical bars. One item is selected.
[ x | y | ... ] Optional items are grouped in brackets and separated by
vertical bars. One item is selected or no item is selected.
{ x | y | ... }
*
Optional items are grouped in braces and separated by
vertical bars. A minimum of one item or a maximum of all
items can be selected.
[ x | y | ... ]
*
Optional items are grouped in brackets and separated by
vertical bars. Several items or no item can be selected.
GUI Conventions
The GUI conventions that may be found in this document are defined as follows.
Convention Description
Boldface Buttons, menus, parameters, tabs, window, and dialog titles
are in boldface. For example, click OK.
> Multi-level menus are in boldface and separated by the ">"
signs. For example, choose File > Create > Folder.
Keyboard Operations
The keyboard operations that may be found in this document are defined as follows.
Format Description
Key Press the key. For example, press Enter and press Tab.
Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt
+A means the three keys should be pressed concurrently.
Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A means
the two keys should be pressed in turn.
Mouse Operations
The mouse operations that may be found in this document are defined as follows.
BTS3900L (Ver.C)
Installation Guide
About This Document
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
v
Action Description
Click Select and release the primary mouse button without moving
the pointer.
Double-click Press the primary mouse button twice continuously and
quickly without moving the pointer.
Drag Press and hold the primary mouse button and move the
pointer to a certain position.
BTS3900L (Ver.C)
Installation Guide About This Document
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
vi
Contents
About This Document.....................................................................................................................ii
1 Changes in BTS3900L (Ver.C) Installation Guide..................................................................1
2 Preparing for Installation.............................................................................................................5
2.1 Document Preparations...................................................................................................................................................6
2.2 Preparing Tools and Meters............................................................................................................................................6
2.3 Skills and Requirements for Onsite Personnel...............................................................................................................7
3 Information About the Installation...........................................................................................8
3.1 Configurations of the BTS3900L Cabinet......................................................................................................................9
3.2 Application Scenario of the BTS3900L Cabinet (Only RFUs Configured).................................................................11
3.3 Application Scenario of the BTS3900 Cabinet (RRUs and RFUs Configured)...........................................................12
3.4 Installation Clearance and Position Requirements.......................................................................................................14
4 Unpacking the Equipment.........................................................................................................17
5 Obtaining the ESN......................................................................................................................19
6 Installation Process.....................................................................................................................21
7 Checking Installed Modules and Cables................................................................................23
8 Installing the Cabinet.................................................................................................................26
8.1 Installing the Cabinet Without a Base..........................................................................................................................27
8.2 Installing the Cabinet with Base on the Concrete Floor...............................................................................................32
8.3 Installing a Cabinet with Base on an ESD Floor..........................................................................................................36
9 Installing a PGND Cable...........................................................................................................43
10 (Optional) Installing the Modules.........................................................................................45
10.1 Installing the GPS surge protector..............................................................................................................................46
10.2 Installing the GATM and Bias-Tee............................................................................................................................49
10.3 Installing the DCDU-11B...........................................................................................................................................52
10.4 Installing the BBU Case.............................................................................................................................................56
10.5 Installing the BBU Components.................................................................................................................................57
11 Installing the Cables.................................................................................................................61
11.1 Cabling Requirements................................................................................................................................................63
BTS3900L (Ver.C)
Installation Guide
Contents
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
vii
11.2 Cable Routes...............................................................................................................................................................69
11.3 Installing the Power Cables........................................................................................................................................72
11.3.1 Standard Powering Scenario....................................................................................................................................72
11.3.2 Small Configuration Scenario I: 2x80A in Upper and Lower Shelves...................................................................74
11.3.3 Small Configuration Scenario II: 2x80A in Lower Shelf in Parallel.......................................................................76
11.3.4 Small Configuration Scenario III: 2x80A in Upper Shelf in Parallel......................................................................79
11.4 Installing a BBU Power Cable....................................................................................................................................82
11.5 (Optional) Installing RRU Power Cables...................................................................................................................83
11.6 Installing the Transmission Cables.............................................................................................................................86
11.6.1 Installing an E1/T1 Cable........................................................................................................................................86
11.6.2 Installing an FE/GE Optical Cable..........................................................................................................................87
11.6.3 Installing an FE/GE Cable.......................................................................................................................................89
11.7 Installing the Monitoring Signal Cables.....................................................................................................................90
11.7.1 (Optional) Installing the Inter-BBU Signal Cable...................................................................................................90
11.7.2 (Optional)Installing the Monitoring Signal Cable for the EMU.............................................................................95
11.7.3 Installing a BBU Alarm Cable.................................................................................................................................96
11.8 Installing an RF Jumper..............................................................................................................................................97
11.9 Installing the CPRI Cable...........................................................................................................................................98
11.10 (Optional)Installing a CPRI Optical Fiber..............................................................................................................100
12 Installation Checklist..............................................................................................................104
13 Powering On the BTS3900L...................................................................................................107
BTS3900L (Ver.C)
Installation Guide Contents
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
viii
1 Changes in BTS3900L (Ver.C) Installation
Guide
This chapter describes the changes in BTS3900L (Ver.C) Installation Guide.
07 (2013-11-08)
This is the seventh official release.
Compared with issue 06 (2013-08-23), no topic is added.
Compared with issue 06 (2013-08-23), this issue incorporates the following changes:
Topic Change Description
l 3.1 Configurations of the BTS3900L
Cabinet
l 3.3 Application Scenario of the
BTS3900 Cabinet (RRUs and RFUs
Configured)
Deleted the description of that a DCDU-11B or
DCDU-12B can be configured in the
BTS3900L (Ver.C) cabinet.
Installing a DCDU-11B Deleted the steps of installing a DCDU-12B on
the wall.
11.5 (Optional) Installing RRU Power
Cables
l Deleted the description of installing RRU
power cables when a DCDU-12B is
installed to supply power.
l Added the steps of installing a ground clip
to ground RRU power cables near the
feeder window when the RRUs are installed
outdoors.
Compared with issue 06 (2013-08-23), the following topic is deleted:
l Installing a DCDU-11B or DCDU-12B in a Cabinet
BTS3900L (Ver.C)
Installation Guide
1 Changes in BTS3900L (Ver.C) Installation Guide
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1
06 (2013-08-23)
This is the sixth official release.
Compared with issue 05 (2013-05-27), this issue adds the following contents:
l Installing a DCDU-11B or DCDU-12B in a Cabinet
l 11.7.3 Installing a BBU Alarm Cable
Compared with issue 05 (2013-05-27), this issue incorporates the following changes:
Topic Change Description
l 3.1 Configurations of the BTS3900L
Cabinet
l 3.3 Application Scenario of the
BTS3900 Cabinet (RRUs and RFUs
Configured)
Added the description of that a DCDU-11B or
DCDU-12B can be configured in the
BTS3900L (Ver.C) cabinet.
Installing a DCDU-11B Added the steps of installing a DCDU-12B on
the wall.
11.5 (Optional) Installing RRU Power
Cables
Added the description of installing RRU power
cables when a DCDU-12B is installed to
supply power.
Compared with issue 05 (2013-05-27), no information is deleted.
05 (2013-05-27)
This is the fifth official release.
Compared with issue 04 (2012-12-30), no topic is added or deleted.
Compared with issue 04 (2012-12-30), this issue incorporates the following changes:
Topic Change Description
11.7.1 (Optional) Installing the Inter-
BBU Signal Cable
Modified the steps of binding and routing the
inter-BBU signal cable.
04 (2012-12-30)
This is the fourth official release.
Compared with 03 (2012-11-08), no topic is added.
Compared with 03 (2012-11-08), this issue incorporates the following change:
Topic Change Description
10.5 Installing the BBU Components Added the precautions for installing boards.
BTS3900L (Ver.C)
Installation Guide 1 Changes in BTS3900L (Ver.C) Installation Guide
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2
Topic Change Description
11.7.1 (Optional) Installing the Inter-BBU
Signal Cable
Modified the description of BBU
interconnection signal cables in the
prerequisites.
Compared with 03 (2012-11-08), no information is deleted.
03 (2012-11-08)
This is the third commercial release.
Compared with 02 (2012-06-20), no topic is added.
Compared with 02 (2012-06-20), this issue incorporates the following change:
Content Change Description
11.10 (Optional)Installing a CPRI Optical
Fiber
Added a picture for routing CPRI fiber optic
cables.
11.2 Cable Routes Optimized the description of the cable routing
policies.
Compared with 02 (2012-06-20), no topic is deleted.
02 (2012-06-20)
This is the second official release.
Compared with 01 (2012-04-25), this issue adds the following contents:
l (Optional)Installing the RRU Input Power Cable
l 11.10 (Optional)Installing a CPRI Optical Fiber
Compared with 01 (2012-04-25), no topic is changed.
Compared with 01 (2012-04-25), no topic is deleted.
01 (2012-04-25)
This is the first commercial release.
Compared with Draft B (2012-03-20), no topic is added.
Compared with Draft B (2012-03-20), this issue incorporates the following change:
Content Change Description
11.7.1 (Optional) Installing the Inter-BBU
Signal Cable
Added the method to identify the type of
optical modules.
BTS3900L (Ver.C)
Installation Guide
1 Changes in BTS3900L (Ver.C) Installation Guide
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3
Compared with Draft B (2012-03-20), no topic is deleted.
Draft B (2012-03-20)
This is the Draft release.
Compared with Draft A (2012-02-10), no topic is added.
Compared with Draft A (2012-02-10), this issue incorporates the following changes:
Content Change Description
3.1 Configurations of the BTS3900L
Cabinet
Updated the figure of cabinet.
3.2 Application Scenario of the BTS3900L
Cabinet (Only RFUs Configured)
Optimized the figures of cabinet
configuration.
The whole document Made some editorial changes.
Compared with Draft A (2012-02-10), no topic is deleted.
Draft A (2012-02-10)
This is the Draft release.
Compared with MBTS V100R004C00, WCDMA-NodeB V200R013C00, GSM-BTS
V100R013C00, eNodeB V100R004C00, this issue adds the following topic:
l 2.1 Document Preparations
l 3.2 Application Scenario of the BTS3900L Cabinet (Only RFUs Configured)
l 11.7.1 (Optional) Installing the Inter-BBU Signal Cable
l 13 Powering On the BTS3900L
Compared with MBTS V100R004C00, WCDMA-NodeB V200R013C00, GSM-BTS
V100R013C00, eNodeB V100R004C00, this issue incorporates the following change:
Content Change Description
The whole document Reorganized the document and optimized
some descriptions and figures.
Compared with MBTS V100R004C00, WCDMA-NodeB V200R013C00, GSM-BTS
V100R013C00, eNodeB V100R004C00, this issue deletes the following topic:
l Performing Power-On Check
BTS3900L (Ver.C)
Installation Guide
1 Changes in BTS3900L (Ver.C) Installation Guide
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4
2 Preparing for Installation
About This Chapter
This section describes the tools and meters that need to be available before the installation. It
also describes the skills and qualifications that the installation engineers must possess.
2.1 Document Preparations
This section describes the reference documents that must be ready before the installation.
2.2 Preparing Tools and Meters
This section describes the tools and meters that are required before installation.
2.3 Skills and Requirements for Onsite Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
BTS3900L (Ver.C)
Installation Guide 2 Preparing for Installation
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5
2.1 Document Preparations
This section describes the reference documents that must be ready before the installation.
l Before the installation, you must familiar with the following reference documents:
– BTS3900L (Ver.C) Hardware Description
– Safety Information
l During the installation, you must familiar with the following reference document:
– Installation Reference
2.2 Preparing Tools and Meters
This section describes the tools and meters that are required before installation.
Marking pen
Phillips screwdriver (M3 to
M6)
Flat-head screwdriver (M3 to
M6)
Diagonal pliers
Combination wrench
(capacity 32 mm)
Socket wrench Torque wrench
Power cable crimping tool RJ11 crimping tool Cable cutter
Rubber mallet Soldering iron Wire stripper
Hammer drill (Ø16) Heat gun Level
BTS3900L (Ver.C)
Installation Guide 2 Preparing for Installation
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6
Multimeter Measuring tape Vacuum cleaner
ESD wrist strap ESD gloves Torque screwdriver
Protective gloves Hydraulic pliers Utility knife
2.3 Skills and Requirements for Onsite Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
Before the installation, pay attention to the following items:
l The customer's technical engineers must be trained by Huawei and be familiar with the
proper installation and operation methods.
l The number of onsite personnel depends on the engineering schedule and installation
environment. Generally, only three to five onsite personnel are necessary.
BTS3900L (Ver.C)
Installation Guide 2 Preparing for Installation
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7
3 Information About the Installation
About This Chapter
This section provides important notes for the BTS3900L cabinet with -48 V AC power. Before
a cabinet is installed, you must familiar with the cabinet structure, application scenario, and
space requirements. This document describes how to install the BTS3900L cabinet configured
with the RFUs. For details about how to install the BTS3900L cabinet configured with RFUs
and RRUs, see the BTS3900L (RFU+RRU) Installation Guide.
3.1 Configurations of the BTS3900L Cabinet
This section describes the interior and components of the BTS3900L cabinet.
3.2 Application Scenario of the BTS3900L Cabinet (Only RFUs Configured)
This section describes the configurations of a single-mode, dual-mode, and triple-mode base
station if only RFUs are configured in a BTS3900L cabinet.
3.3 Application Scenario of the BTS3900 Cabinet (RRUs and RFUs Configured)
This section describes the configurations of a single-mode, dual-mode, and triple-mode base
station if both RRUs and RFUs are configured in a BTS3900L cabinet.
3.4 Installation Clearance and Position Requirements
The installation of cabinets must meet the requirements of the proper design, practical
installation, and elegant layout.
BTS3900L (Ver.C)
Installation Guide 3 Information About the Installation
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8
3.1 Configurations of the BTS3900L Cabinet
This section describes the interior and components of the BTS3900L cabinet.
Figure 3-1 shows the interior and Table 3-1 describes the components of the BTS3900L cabinet.
Figure 3-1 Interior of the BTS3900L Cabinet
Table 3-1 Components in the BTS3900L cabinet
No. Module Optional or
Mandatory
Maximum
Quantity
Remark
1 Filler panel Optional - If a slot in the RFU subrack
is vacant, insert a filler panel
into the slot. This ensures
normal ventilation of the
cabinet.
BTS3900L (Ver.C)
Installation Guide 3 Information About the Installation
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9
No. Module Optional or
Mandatory
Maximum
Quantity
Remark
2 RFU Mandatory 12 The RFU modulates and
demodulates baseband
signals and RF signals,
processes data, and
combines and divides
signals.
3 Fan Assembly Mandatory 2 Fan assembly dissipates the
heat from the cabinet.
4 Air intake vent Mandatory - -
5 DCDU-11A Mandatory 2 -
6 BBU Mandatory 1 BBU3900 processes the
baseband signals and enables
interaction between the base
station and the BSC or RNC.
7 Cable trough Mandatory - -
8 BBU Optional 1 This 2 U space can house a
BBU in triple-mode base
stations. It is recommended
that this space be reserved
even when only one BBU is
installed.
9 Remaining space Optional - This 2 U space can house the
GATM or transmission
equipment. The GATM is
preferentially installed in this
space and is supplied with
power by the DCDU-01. If
there is no GATM, the
transmission equipment is
installed in this space.
NOTE
The transmission equipment is preferentially installed outside the cabinet. However it can be installed at
the bottom of the cabinet under some special condition (e.g.: space constraint). The following requirements
must be satisfied:
l The transmission equipment must be able to work properly at a temperature equal to or higher than
55°C.
l The transmission equipment is fed with external power supply since DCDU-11A does not support
power supply to transmission equipment.
BTS3900L (Ver.C)
Installation Guide
3 Information About the Installation
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10
3.2 Application Scenario of the BTS3900L Cabinet (Only
RFUs Configured)
This section describes the configurations of a single-mode, dual-mode, and triple-mode base
station if only RFUs are configured in a BTS3900L cabinet.
Cabinet Configuration Rules
l A maximum of 12 RFUs can be configured in a single site. An additional site is required
is number of RFU exceeds twelve.
l The BTS3900L cabinet support neither side-by-side nor stack installation.
l In the application scenario in single- or dual-mode, only one BBU can be configured and
it is configured in the upper part of the cabinet by default.
l In a triple-mode scenario, two BBUs are configured.
l In a triple-mode scenario, BBU 0 is the root BBU and BBU 1 is the leaf BBU.
Cabinet Configurations for a Single- or Dual-Mode Scenario
Figure 3-2 show the configurations of the BTS3900L in a single- or dual-mode scenario.
Figure 3-2 BTS3900L in a single- or dual-mode scenario
1. BTS3900L (GATM not configured)
2. BTS3900L (GATM configured)
BTS3900L (Ver.C)
Installation Guide 3 Information About the Installation
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
11
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119

Huawei BTS3900L LTE Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI