ABB Relion REG670 Commissioning Manual

Type
Commissioning Manual
RELION® 670 SERIES
—
Generator protection REG670
Version 2.2 IEC
Commissioning manual
Document ID: 1MRK 502 073-UEN
Issued: October 2017
Revision: A
Product version: 2.2.1
© Copyright 2017 ABB. All rights reserved
Copyright
This document and parts thereof must not be reproduced or copied without written
permission from ABB, and the contents thereof must not be imparted to a third
party, nor used for any unauthorized purpose.
The software and hardware described in this document is furnished under a license
and may be used or disclosed only in accordance with the terms of such license.
This product includes software developed by the OpenSSL Project for use in the
OpenSSL T
oolkit. (http://www.openssl.org/) This product includes cryptographic
software written/developed by: Eric Young ([email protected]) and Tim Hudson
Trademarks
ABB and Relion are registered trademarks of the ABB Group. All other brand or
product names mentioned in this document may be trademarks or registered
trademarks of their respective holders.
Warranty
Please inquire about the terms of warranty from your nearest ABB representative.
Disclaimer
The data, examples and diagrams in this manual are included solely for the concept
or product description and are not to be deemed as a statement of guaranteed
properties. All persons responsible for applying the equipment addressed in this
manual must satisfy themselves that each intended application is suitable and
acceptable, including that any applicable safety or other operational requirements
are complied with. In particular, any risks in applications where a system failure
and/or product failure would create a risk for harm to property or persons
(including but not limited to personal injuries or death) shall be the sole
responsibility of the person or entity applying the equipment, and those so
responsible are hereby requested to ensure that all measures are taken to exclude or
mitigate such risks.
This document has been carefully checked by ABB but deviations cannot be
completely ruled out. In case any errors are detected, the reader is kindly requested
to notify the manufacturer
. Other than under explicit contractual commitments, in
no event shall ABB be responsible or liable for any loss or damage resulting from
the use of this manual or the application of the equipment.
Conformity
This product complies with the directive of the Council of the European
Communities on the approximation of the laws of the Member States relating to
electromagnetic compatibility (EMC Directive 2004/108/EC) and concerning
electrical equipment for use within specified voltage limits (Low-voltage directive
2006/95/EC). This conformity is the result of tests conducted by ABB in
accordance with the product standard EN 60255-26 for the EMC directive, and
with the product standards EN 60255-1 and EN 60255-27 for the low voltage
directive. The product is designed in accordance with the international standards of
the IEC 60255 series.
Table of contents
Section 1 Introduction
.....................................................................11
This manual...................................................................................... 11
Intended audience............................................................................ 11
Product documentation.....................................................................12
Product documentation set..........................................................12
Document revision history........................................................... 13
Related documents......................................................................14
Document symbols and conventions................................................14
Symbols.......................................................................................14
Document conventions................................................................ 15
IEC 61850 edition 1 / edition 2 mapping...........................................16
Section 2 Safety information.......................................................... 25
Symbols on the product....................................................................25
Warnings.......................................................................................... 25
Caution signs....................................................................................27
Note signs.........................................................................................28
Section 3 Available functions......................................................... 29
Main protection functions..................................................................29
Back-up protection functions............................................................ 30
Control and monitoring functions......................................................32
Communication.................................................................................37
Basic IED functions.......................................................................... 40
Section 4 Starting up......................................................................43
Factory and site acceptance testing................................................. 43
Commissioning checklist.................................................................. 43
Checking the power supply.............................................................. 44
Energizing the IED............................................................................44
Checking the IED operation.........................................................44
IED start-up sequence.................................................................45
Energizing REX060.......................................................................... 45
REX060 start up sequence..........................................................45
Setting up communication between PCM600 and the IED...............46
Writing an application configuration to the IED.................................50
Checking CT circuits.........................................................................51
Checking VT circuits.........................................................................52
Using the RTXP test switch.............................................................. 52
Checking the binary input/output circuits..........................................53
Table of contents
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062 1
Commissioning manual
Binary input circuits..................................................................... 53
Binary output circuits................................................................... 53
Checking optical connections
........................................................... 54
Section 5 Configuring the IED and changing settings....................55
Overview...........................................................................................55
Configuring analog CT inputs........................................................... 56
Supervision of input/output modules................................................ 56
Section 6 Calibrating injection based sensitive rotor earth fault
protection........................................................................59
Commissioning process................................................................... 59
Commissioning tool ICT................................................................... 59
Launching injection commissioning tool (ICT).................................. 61
Performing calibration.......................................................................63
Acquiring references.........................................................................66
Verifying calibration.......................................................................... 68
Auditing.............................................................................................70
Editing features in graph...................................................................71
Logging measurements to file.......................................................... 72
Section 7 Calibrating injection based 100% stator earth fault
protection........................................................................75
Commissioning process................................................................... 75
Commissioning tool ICT................................................................... 75
Launching injection commissioning tool (ICT).................................. 78
Performing calibration.......................................................................79
Acquiring references.........................................................................82
Verifying calibration.......................................................................... 84
Auditing.............................................................................................86
Editing features in graph...................................................................87
Logging measurements to file.......................................................... 88
Section 8 Establishing connection and verifying the SPA/IEC
communication............................................................... 91
Entering settings...............................................................................91
Entering SPA settings..................................................................91
Entering IEC settings...................................................................91
Verifying the communication............................................................ 92
Verifying SPA communication..................................................... 92
Verifying IEC communication...................................................... 92
Fibre optic loop................................................................................. 93
Optical budget calculation for serial communication with
SPA/IEC .......................................................................................... 93
Table of contents
2 Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Commissioning manual
Section 9 Establishing connection and verifying the LON
communication...............................................................
95
Communication via the rear ports ....................................................95
LON communication.................................................................... 95
The LON Protocol........................................................................96
Hardware and software modules.................................................96
Optical budget calculation for serial communication with LON ........98
Section 10 Establishing connection and verifying the IEC 61850
communication............................................................... 99
Overview...........................................................................................99
Setting the station communication....................................................99
Verifying the communication.......................................................... 100
Section 11 Establishing connection and verifying the IEEE
C37.118/1344 communication..................................... 101
Overview.........................................................................................101
Setting the PMU station communication (PMU Report)................. 101
Setting the PMU station communication (PMU configuration)........102
Setting the TCP/UDP client communication................................... 103
Verifying the communication.......................................................... 106
Verifying the IEEE C37.118/1344 TCP communication............ 107
Verifying the IEEE C37.118/1344 UDP communication............ 113
Optical budget calculation for PMU - PDC communication............ 114
Section 12 Testing IED operation...................................................115
Preparing for test............................................................................ 115
Requirements............................................................................ 115
Preparing the IED to verify settings........................................... 117
Activating the test mode................................................................. 118
Preparing the connection to the test equipment............................. 118
Connecting the test equipment to the IED......................................119
Releasing the function to be tested................................................ 120
Verifying analog primary and secondary measurement................. 121
Testing the protection functionality................................................. 122
Forcing of binary input/output signals for testing............................ 122
Forcing concept......................................................................... 122
How to enable forcing................................................................122
Enable forcing by using LHMI.............................................. 122
Enable forcing using TESTMODE function block.................123
How to change binary input/output signals using forcing.......... 123
Forcing by using LHMI......................................................... 123
Forcing by using PCM600.................................................... 125
Table of contents
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062 3
Commissioning manual
How to undo forcing changes and return the IED to normal
operation....................................................................................127
Undo forcing by using TESTMODE component
...................127
Undo forcing by using LHMI................................................. 127
Undo forcing by using PCM600............................................127
Section 13 Testing functionality by secondary injection.................129
Testing disturbance report..............................................................129
Introduction................................................................................129
Disturbance report settings........................................................129
Disturbance recorder (DR)........................................................ 129
Event recorder (ER) and Event list (EL).................................... 130
Identifying the function to test in the technical reference manual ..131
Differential protection......................................................................131
Transformer differential protection T2WPDIF andT3WPDIF..... 131
Verifying the settings............................................................ 131
Completing the test.............................................................. 132
High impedance differential protection HZPDIF ....................... 132
Verifying the settings............................................................ 132
Completing the test.............................................................. 133
Generator differential protection GENPDIF .............................. 133
Verifying the settings............................................................ 133
Completing the test.............................................................. 134
Restricted earth fault protection, low impedance REFPDIF ..... 134
Verifying the settings............................................................ 134
Completing the test.............................................................. 135
Impedance protection..................................................................... 135
Full scheme distance protection, mho characteristic ZMHPDIS135
High speed distance protection zones, quadrilateral and
mho characteristic ZMFPDIS.....................................................136
Measuring the operating limit of set values.......................... 139
Measuring the operating time of distance protection zones. 140
Completing the test.............................................................. 140
High Speed distance for series compensated line zones,
quadrilateral and mho characteristic ZMFCPDIS ..................... 140
Measuring the operating limit of set values.......................... 144
Measuring the operating time of distance protection zones. 144
Completing the test.............................................................. 145
Pole slip protection PSPPPAM..................................................145
Verifying the settings............................................................ 145
Completing the test.............................................................. 148
Out-of-step protection OOSPPAM.............................................148
Verifying the settings............................................................ 149
Test of point RE (R
FwdR
, X
FwdX
)........................................... 153
Table of contents
4 Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Commissioning manual
Test of the boundary between zone 1 and zone 2, which
is defined by the parameter
ReachZ1
.................................. 157
Test of the point SE (R
RvsR
, X
RvsX
)...................................... 162
Loss of excitation LEXPDIS ......................................................166
Verifying the settings............................................................ 166
Completing the test.............................................................. 168
Under impedance protection for Generator ZGVPDIS.............. 168
Verifying the settings............................................................ 169
Completing the test.............................................................. 172
Rotor earth fault protection with RXTTE4 and general
current and voltage protection CVGAPC...................................172
Testing..................................................................................172
Completing the test.............................................................. 174
Current protection...........................................................................174
Instantaneous phase overcurrent protection 3-phase output
PHPIOC ....................................................................................174
Measuring the operate limit of set values.............................174
Completing the test.............................................................. 175
Directional phase overcurrent protection, four steps
OC4PTOC................................................................................. 175
Verifying the settings............................................................ 175
Completing the test.............................................................. 177
Instantaneous residual overcurrent protection EFPIOC ........... 177
Measuring the operate limit of set values.............................177
Completing the test.............................................................. 178
Four step residual overcurrent protection, (Zero sequence
or negative sequence directionality) EF4PTOC ....................... 178
Four step directional earth fault protection........................... 178
Four step non-directional earth fault protection....................179
Completing the test.............................................................. 179
Four step negative sequence overcurrent protection
NS4PTOC .................................................................................179
Completing the test.............................................................. 180
Sensitive directional residual overcurrent and power
protection SDEPSDE ................................................................180
Measuring the operate and time limit for set values.............181
Completing the test.............................................................. 186
Thermal overload protection, two time constants TRPTTR ......186
Checking operate and reset values......................................186
Completing the test.............................................................. 187
Breaker failure protection, phase segregated activation and
output CCRBRF.........................................................................187
Checking the phase current operate value,
IP>
................... 187
Table of contents
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062 5
Commissioning manual
Checking the residual (earth fault) current operate value
IN>
set below
IP>
................................................................. 188
Checking the re-trip and back-up times................................188
Verifying the re-trip mode..................................................... 188
Verifying the back-up trip mode............................................189
Verifying instantaneous back-up trip at CB faulty condition. 190
Verifying the function mode
Current/Contact
....................... 190
Completing the test.............................................................. 191
Pole discordance protection CCPDSC...................................... 191
Verifying the settings............................................................ 191
Completing the test.............................................................. 192
Directional underpower protection GUPPDUP ......................... 192
Verifying the settings............................................................ 192
Completing the test.............................................................. 194
Directional overpower protection GOPPDOP ...........................194
Verifying the settings............................................................ 194
Completing the test.............................................................. 195
Negative-sequence time overcurrent protection for
machines NS2PTOC ................................................................ 195
Verifying settings by secondary injection............................. 195
Completing the test.............................................................. 197
Accidental energizing protection for synchronous generator
AEGPVOC.................................................................................197
Verifying the settings............................................................ 197
Voltage-restrained time overcurrent protection VRPVOC......... 198
Verifying the settings............................................................ 198
Completing the test.............................................................. 201
Generator stator overload protection GSPTTR......................... 201
Verifying the settings............................................................ 201
Completing the test.............................................................. 202
Generator rotor overload protection GRPTTR...........................202
Verifying the settings............................................................ 202
Completing the test.............................................................. 203
Voltage protection...........................................................................203
Two step undervoltage protection UV2PTUV ...........................203
Verifying the settings............................................................ 203
Completing the test.............................................................. 205
Two step overvoltage protection OV2PTOV .............................205
Verifying the settings............................................................ 205
Extended testing...................................................................206
Completing the test.............................................................. 206
Two step residual overvoltage protection ROV2PTOV ............ 206
Verifying the settings............................................................ 206
Completing the test.............................................................. 207
Table of contents
6 Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Commissioning manual
Overexcitation protection OEXPVPH ....................................... 207
Verifying the settings............................................................ 207
Completing the test..............................................................
208
Voltage differential protection VDCPTOV .................................208
Check of undervoltage levels............................................... 208
Check of voltage differential trip and alarm levels................210
Check of trip and trip reset timers........................................ 211
Final adjustment of compensation for VT ratio differences . 212
Completing the test.............................................................. 212
100% Stator earth fault protection, 3rd harmonic based
STEFPHIZ ................................................................................ 212
Testing..................................................................................213
Verifying settings.................................................................. 214
Completing the test.............................................................. 215
Frequency protection......................................................................215
Underfrequency protection SAPTUF ........................................ 215
Verifying the settings............................................................ 215
Completing the test.............................................................. 216
Overfrequency protection SAPTOF ..........................................216
Verifying the settings............................................................ 216
Completing the test.............................................................. 217
Rate-of-change frequency protection SAPFRC ........................217
Verifying the settings............................................................ 217
Completing the test.............................................................. 218
Frequency time accumulation protection function FTAQFVR... 218
Verifying the settings............................................................ 218
Completing the test.............................................................. 220
Multipurpose protection.................................................................. 220
General current and voltage protection CVGAPC..................... 220
Built-in overcurrent feature (non-directional)........................ 221
Overcurrent feature with current restraint.............................222
Overcurrent feature with voltage restraint............................ 222
Overcurrent feature with directionality..................................222
Over/Undervoltage feature................................................... 223
Completing the test.............................................................. 223
Secondary system supervision.......................................................223
Current circuit supervision CCSSPVC.......................................223
Verifying the settings............................................................ 224
Completing the test.............................................................. 224
Fuse failure supervision FUFSPVC...........................................224
Checking that the binary inputs and outputs operate as
expected ..............................................................................224
Measuring the operate value for the negative sequence
function ................................................................................225
Table of contents
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062 7
Commissioning manual
Measuring the operate value for the zero-sequence
function ................................................................................226
Measuring the
operate value for the dead line detection
function.................................................................................227
Checking the operation of the du/dt and di/dt based
function ................................................................................227
Completing the test.............................................................. 228
Fuse failure supervision VDSPVC.............................................228
Completing the test.............................................................. 229
Control............................................................................................ 229
Synchrocheck, energizing check, and synchronizing
SESRSYN................................................................................. 229
Testing the synchronizing function....................................... 232
Testing the synchrocheck functionality.................................232
Testing the energizing check................................................235
Testing the voltage selection................................................236
Completing the test.............................................................. 238
Apparatus control APC.............................................................. 239
Tap changer control and supervision TCMYLTC, TCLYLTC.... 239
Secondary test..................................................................... 241
Check the activation of the voltage control operation...........241
Check the normal voltage regulation function...................... 242
Check the undervoltage block function................................ 243
Check the upper and lower busbar voltage limit.................. 243
Check the overcurrent block function................................... 244
Single transformer................................................................ 244
Parallel voltage regulation.................................................... 245
Completing the test.............................................................. 250
Single command, 16 signals SINGLECMD............................... 250
Interlocking................................................................................ 250
Logic............................................................................................... 250
Tripping logic, common 3-phase output SMPPTRC .................250
3 phase operating mode.......................................................250
1ph/3ph operating mode...................................................... 251
1ph/2ph/3ph operating mode............................................... 252
Circuit breaker lockout..........................................................253
Completing the test.............................................................. 254
Integrator TIGAPC.....................................................................254
Completing the test.............................................................. 254
Monitoring.......................................................................................254
Gas medium supervision SSIMG.............................................. 254
Testing the gas medium supervision for pressure alarm
and pressure lockout conditions...........................................254
Table of contents
8 Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Commissioning manual
Testing the gas medium supervision for temperature
alarm and temperature lock out conditions..........................
255
Completing the test.............................................................. 255
Liquid medium supervision SSIML............................................ 255
Testing the liquid medium supervision for level alarm
and level lockout conditions................................................. 256
Testing the liquid medium supervision for temperature
alarm and temperature lock out conditions.......................... 256
Completing the test.............................................................. 256
Breaker monitoring SSCBR.......................................................257
Verifying the settings............................................................ 257
Completing the test.............................................................. 259
Event function EVENT...............................................................259
Limit counter L4UFCNT.............................................................259
Completing the test.............................................................. 259
Estimation of transformer insulation life LOLSPTR .................. 259
Verifying the signals and settings.........................................260
Completing the test.............................................................. 261
Metering..........................................................................................261
Pulse-counter logic PCFCNT.................................................... 261
Function for energy calculation and demand handling
ETPMMTR.................................................................................262
Verifying the settings............................................................ 262
Completing the test.............................................................. 263
Station communication................................................................... 263
Multiple command and transmit MULTICMDRCV /
MULTICMDSND........................................................................ 263
Remote communication..................................................................264
Binary signal transfer.................................................................264
Basic IED functions........................................................................ 265
Parameter setting group handling SETGRPS........................... 265
Verifying the settings............................................................ 265
Completing the test.............................................................. 266
Exit test mode.................................................................................266
Section 14 Checking the directionality........................................... 267
Overview.........................................................................................267
Testing the directionality of the distance protection........................267
Section 15 Commissioning and maintenance of the fault
clearing system............................................................ 271
Commissioning tests...................................................................... 271
Periodic maintenance tests............................................................ 271
Visual inspection........................................................................272
Maintenance tests..................................................................... 272
Table of contents
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062 9
Commissioning manual
Preparation...........................................................................272
Recording............................................................................. 273
Secondary injection
.............................................................. 273
Alarm test............................................................................. 273
Self supervision check..........................................................273
Trip circuit check.................................................................. 273
Measurement of service currents......................................... 274
Restoring.............................................................................. 275
Section 16 Troubleshooting............................................................277
Checking the self supervision signals.............................................277
Checking the self supervision function...................................... 277
Determine the cause of an internal failure............................277
Self supervision HMI data..........................................................277
General IED status............................................................... 277
Fault tracing....................................................................................278
Internal fault indications.............................................................278
Using front-connected PC......................................................... 279
Diagnosing the IED status via the LHMI hint menu................... 281
Repair instruction............................................................................283
Repair support................................................................................ 284
Maintenance................................................................................... 284
Section 17 Glossary....................................................................... 285
Table of contents
10 Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Commissioning manual
Section 1 Introduction
1.1 This manual
GUID-AB423A30-13C2-46AF-B7FE-A73BB425EB5F v18
The commissioning manual contains instructions on how to commission the IED.
The manual can also be used by system engineers and maintenance personnel for
assistance during the testing phase. The manual provides procedures for the
checking of external circuitry and ener
gizing the IED, parameter setting and
configuration as well as verifying settings by secondary injection. The manual
describes the process of testing an IED in a substation which is not in service. The
chapters are organized in the chronological order in which the IED should be
commissioned. The relevant procedures may be followed also during the service
and maintenance activities.
1.2 Intended audience
GUID-C9B8127F-5748-4BEA-9E4F-CC762FE28A3A v11
This manual addresses the personnel responsible for commissioning, maintenance
and taking the IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic
equipment. The commissioning and maintenance personnel must be well
experienced in using protection equipment, test equipment, protection functions
and the configured functional logics in the IED.
1MRK 502 073-UEN A Section 1
Introduction
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062 11
Commissioning manual
1.3 Product documentation
1.3.1 Product documentation set
GUID-3AA69EA6-F1D8-47C6-A8E6-562F29C67172 v15
IEC07000220-4-en.vsd
P
la
n
n
in
g
&
p
u
rc
h
a
s
e
E
n
g
in
e
e
rin
g
In
s
ta
llin
g
C
o
m
m
is
s
io
n
in
g
O
p
e
ra
tio
n
M
a
in
te
n
a
n
c
e
D
e
c
o
m
m
is
s
io
n
in
g
D
e
in
s
ta
llin
g
&
d
is
p
o
s
a
l
Application manual
Operation manual
Installation manual
Engineering manual
Communication
protocol manual
Cyber security
deployment guideline
Technical manual
Commissioning manual
IEC07000220 V4 EN-US
Figure 1: The intended use of manuals throughout the product lifecycle
The engineering manual contains instructions on how to engineer the IEDs using
the various tools available within the PCM600 software. The manual provides
instructions on how to set up a PCM600 project and insert IEDs to the project
structure. The manual also recommends a sequence for the engineering of
protection and control functions, LHMI functions as well as communication
engineering for IEC 60870-5-103, IEC 61850, DNP3, LON and SPA.
The installation manual contains instructions on how to install the IED. The
manual provides procedures for mechanical and electrical installation. The chapters
are organized in the chronological order in which the IED should be installed.
The commissioning manual contains instructions on how to commission the IED.
The manual can also be used by system engineers and maintenance personnel for
assistance during the testing phase. The manual provides procedures for the
checking of external circuitry and energizing the IED, parameter setting and
configuration as well as verifying settings by secondary injection. The manual
Section 1 1MRK 502 073-UEN A
Introduction
12 Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Commissioning manual
describes the process of testing an IED in a substation which is not in service. The
chapters are organized in the chronological order in which the IED should be
commissioned. The relevant procedures may be followed also during the service
and maintenance activities.
The operation manual contains instructions on how to operate the IED once it has
been commissioned. The manual provides instructions for the monitoring,
controlling and setting of the IED. The manual also describes how to identify
disturbances and how to view calculated and measured power grid data to
determine the cause of a fault.
The application manual contains application descriptions and setting guidelines
sorted per function. The manual can be used to find out when and for what purpose
a typical protection function can be used. The manual can also provide assistance
for calculating settings.
The technical manual contains operation principle descriptions, and lists function
blocks, logic diagrams, input and output signals, setting parameters and technical
data, sorted per function. The manual can be used as a technical reference during
the engineering phase, installation and commissioning phase, and during normal
service.
The communication protocol manual describes the communication protocols
supported by the IED. The manual concentrates on the vendor
-specific
implementations.
The point list manual describes the outlook and properties of the data points
specific to the IED. The manual should be used in conjunction with the
corresponding communication protocol manual.
The cyber security deployment guideline describes the process for handling cyber
security when communicating with the IED. Certification, Authorization with role
based access control, and product engineering for cyber security related events are
described and sorted by function. The guideline can be used as a technical
reference during the engineering phase, installation and commissioning phase, and
during normal service.
1.3.2 Document revision history
GUID-C8027F8A-D3CB-41C1-B078-F9E59BB73A6C v4
Document revision/date History
–/May 2017 First release
1MRK 502 073-UEN A Section 1
Introduction
Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062 13
Commissioning manual
1.3.3 Related documents
GUID-94E8A5CA-BE1B-45AF-81E7-5A41D34EE112 v5
Documents related to REG670 Document numbers
Application manual 1MRK 502 071-UEN
Commissioning manual 1MRK 502 073-UEN
Product guide 1MRK 502 074-BEN
Technical manual 1MRK 502 072-UEN
Type test certificate 1MRK 502 074-TEN
670 series manuals Document numbers
Operation manual 1MRK 500 127-UEN
Engineering manual 1MRK 511 398-UEN
Installation manual 1MRK 514 026-UEN
Communication protocol manual, DNP3 1MRK 511 391-UUS
Communication protocol manual, IEC
60870-5-103
1MRK 511 394-UEN
Communication protocol manual, IEC 61850
Edition 1
1MRK 511 392-UEN
Communication protocol manual, IEC 61850
Edition 2
1MRK 511 393-UEN
Communication protocol manual, LON 1MRK 511 395-UEN
Communication protocol manual, SPA 1MRK 511 396-UEN
Point list manual, DNP3 1MRK 511 397-UUS
Accessories guide 1MRK 514 012-BEN
Cyber security deployment guideline 1MRK 511 399-UEN
Connection and Installation components 1MRK 513 003-BEN
Test system, COMBITEST 1MRK 512 001-BEN
Application guide, Communication set-up 1MRK 505 382-UEN
1.4 Document symbols and conventions
1.4.1 Symbols
GUID-2945B229-DAB0-4F15-8A0E-B9CF0C2C7B15 v12
The electrical warning icon indicates the presence of a hazard
which could result in electrical shock.
The warning icon indicates the presence of a hazard which could
result in personal injury.
Section 1 1MRK 502 073-UEN A
Introduction
14 Generator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062
Commissioning manual
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176
  • Page 177 177
  • Page 178 178
  • Page 179 179
  • Page 180 180
  • Page 181 181
  • Page 182 182
  • Page 183 183
  • Page 184 184
  • Page 185 185
  • Page 186 186
  • Page 187 187
  • Page 188 188
  • Page 189 189
  • Page 190 190
  • Page 191 191
  • Page 192 192
  • Page 193 193
  • Page 194 194
  • Page 195 195
  • Page 196 196
  • Page 197 197
  • Page 198 198
  • Page 199 199
  • Page 200 200
  • Page 201 201
  • Page 202 202
  • Page 203 203
  • Page 204 204
  • Page 205 205
  • Page 206 206
  • Page 207 207
  • Page 208 208
  • Page 209 209
  • Page 210 210
  • Page 211 211
  • Page 212 212
  • Page 213 213
  • Page 214 214
  • Page 215 215
  • Page 216 216
  • Page 217 217
  • Page 218 218
  • Page 219 219
  • Page 220 220
  • Page 221 221
  • Page 222 222
  • Page 223 223
  • Page 224 224
  • Page 225 225
  • Page 226 226
  • Page 227 227
  • Page 228 228
  • Page 229 229
  • Page 230 230
  • Page 231 231
  • Page 232 232
  • Page 233 233
  • Page 234 234
  • Page 235 235
  • Page 236 236
  • Page 237 237
  • Page 238 238
  • Page 239 239
  • Page 240 240
  • Page 241 241
  • Page 242 242
  • Page 243 243
  • Page 244 244
  • Page 245 245
  • Page 246 246
  • Page 247 247
  • Page 248 248
  • Page 249 249
  • Page 250 250
  • Page 251 251
  • Page 252 252
  • Page 253 253
  • Page 254 254
  • Page 255 255
  • Page 256 256
  • Page 257 257
  • Page 258 258
  • Page 259 259
  • Page 260 260
  • Page 261 261
  • Page 262 262
  • Page 263 263
  • Page 264 264
  • Page 265 265
  • Page 266 266
  • Page 267 267
  • Page 268 268
  • Page 269 269
  • Page 270 270
  • Page 271 271
  • Page 272 272
  • Page 273 273
  • Page 274 274
  • Page 275 275
  • Page 276 276
  • Page 277 277
  • Page 278 278
  • Page 279 279
  • Page 280 280
  • Page 281 281
  • Page 282 282
  • Page 283 283
  • Page 284 284
  • Page 285 285
  • Page 286 286
  • Page 287 287
  • Page 288 288
  • Page 289 289
  • Page 290 290
  • Page 291 291
  • Page 292 292
  • Page 293 293
  • Page 294 294
  • Page 295 295
  • Page 296 296
  • Page 297 297
  • Page 298 298
  • Page 299 299
  • Page 300 300
  • Page 301 301
  • Page 302 302

ABB Relion REG670 Commissioning Manual

Type
Commissioning Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI