Holdrite HF100-5B Installation guide

Type
Installation guide
Solutions to
Shape the World
Installation Instructions
HoldRite
®
HydroFlame
100 & 200
WALL INSTALLATION
FLOOR INSTALLATION
1
1
Clean opening.
Clean opening.
2
2
Install pipes or cables. Install backing
material as required into annular
space as shown to both sides of wall
assembly.
Install pipes or cables. Install backing
material as required into annular
space as shown on one side of oor
assembly.
3
3
Apply caulking as required to close
remaining gap to both sides of wall
assembly; providing a re smoke and
gas resistant seal. Spread caulking
smoothly and evenly all around.
Apply caulking as required to close
remaining gap to one side of oor
assembly: providing a re smoke and
gas resistant seal. Spread caulking
smoothly and evenly all around.
  • Page 1 1

Holdrite HF100-5B Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI