Alcatel-Lucent LambdaUnite 1675 Installation And System Turn-Up Manual

  • Hello! I am an AI chatbot trained to assist you with the Alcatel-Lucent LambdaUnite 1675 Installation And System Turn-Up Manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Title page
1675 LambdaUnite MultiService Switch (MSS) | Release 10.5.4
Installation and System Turn-Up Guide
ITG
365-374-198R10.5.4
CC109727057
ISSUE 1
JULY 2009
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
Proprietary Use pursuant to Company instruction
Legal notice
Legal notice
Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All other trademarks are the property of their respective
owners.
The information presented is subject to change without notice. Alcatel-Lucent assumes no responsibility for inaccuracies contained herein.
Copyright © 2009 Alcatel-Lucent. All rights reserved.
Contains proprietary/trade secret information which is the property of Alcatel-Lucent and must not be made available to, or copied or used by anyone outside
Alcatel-Lucent without its written authorization.
ot to be used or disclosed except in accordance with applicable agreements.
Software copyright
Portions copyright by Atos Origin Integration under MARB
Products
Notice
Every effort has been made to ensure that the information in this document was complete and accurate at the time of printing. However, information is
subject to change.
Declaration of Conformity
The Declaration of Conformity (DoC) for this product can be found in the MSS Product Information and Planning Guide, chapter 9, section “Conformity
statements” or at: http://www.lucent.de/ecl.
Safety
Always observe the Safety Instructions given in chapter 1 when operating the system.
Proprietary Use pursuant to Company instruction
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
Contents
About this document
Purpose
........................................................................................................................................................................................ xxixxxix
Intended audience
.................................................................................................................................................................... xxixxxix
How to use this document
.................................................................................................................................................... xxixxxix
Safety information
................................................................................................................................................................... xxxixxxi
Optical safety
............................................................................................................................................................................ xxxixxxi
Orientation aids
...................................................................................................................................................................... xxxivxxxiv
Intended use
.............................................................................................................................................................................. xxxvxxxv
Technical documentation
..................................................................................................................................................... xxxvxxxv
Important information for self-installing customers
................................................................................................. xxxvixxxvi
Conventions used
.................................................................................................................................................................. xxxvixxxvi
Related information
........................................................................................................................................................... xxxviiixxxviii
Technical support
.................................................................................................................................................................. xxxixxxxix
How to comment
................................................................................................................................................................... xxxixxxxix
Part I: Physical and power installation
1 Safety
Overview
....................................................................................................................................................................................... 1-11-1
General notes on safety
Overview
....................................................................................................................................................................................... 1-31-3
Structure of safety statements
................................................................................................................................................ 1-41-4
Basic safety aspects
................................................................................................................................................................... 1-71-7
Specific safety areas
Overview
.................................................................................................................................................................................... 1-101-10
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
iii
Laser safety ................................................................................................................................................................................ 1-111-11
Optical circuit pack specifications
.................................................................................................................................... 1-141-14
Laser product classification
................................................................................................................................................. 1-171-17
Electrostatic discharge
........................................................................................................................................................... 1-211-21
Intra-building electrical interfaces
.................................................................................................................................... 1-231-23
Safety requirements in specific deployment phases
Overview
.................................................................................................................................................................................... 1-241-24
Transportation
........................................................................................................................................................................... 1-251-25
Storage
......................................................................................................................................................................................... 1-271-27
Installation
.................................................................................................................................................................................. 1-291-29
Taking into operation
............................................................................................................................................................. 1-311-31
Operation and maintenance
................................................................................................................................................. 1-341-34
Taking out of operation
......................................................................................................................................................... 1-391-39
2 General information
Overview
....................................................................................................................................................................................... 2-12-1
Floorplan guidelines (ETSI-2 / EBS-2000)
.................................................................................................................. 2-22-2
Technical data
.............................................................................................................................................................................. 2-52-5
EMC/ESD information
............................................................................................................................................................ 2-62-6
WaveStar
®
CIT requirements
................................................................................................................................................ 2-82-8
Procedure 2-1: Running WaveStar
®
CIT with Windows
®
XP SP2
......................................................................... 2-92-9
Required tools and test equipment
.................................................................................................................................... 2-122-12
Mark descriptions
.................................................................................................................................................................... 2-142-14
Sequence of steps
.................................................................................................................................................................... 2-152-15
3 Mechanical installation
Overview
....................................................................................................................................................................................... 3-13-1
Contents
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
iv
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
365-374-198R10.5.4
Issue 1 July 2009
ETSI-2 installation
Overview
....................................................................................................................................................................................... 3-33-3
Hardware items
........................................................................................................................................................................... 3-43-4
Technical data for rack
............................................................................................................................................................. 3-53-5
Procedure 3-1: Eye bolts
......................................................................................................................................................... 3-83-8
Procedure 3-2: Floor mounting
............................................................................................................................................. 3-93-9
Procedure 3-3: Top mounting
............................................................................................................................................. 3-133-13
Procedure 3-4: Rack extension (width)
........................................................................................................................... 3-153-15
Procedure 3-5: Rack extension (height)
.......................................................................................................................... 3-173-17
Procedure 3-6: Rack adapter kit
......................................................................................................................................... 3-193-19
Technical data for PDP
.......................................................................................................................................................... 3-223-22
Procedure 3-7: MDIO terminal rail
.................................................................................................................................. 3-243-24
Technical data for subrack
................................................................................................................................................... 3-253-25
Procedure 3-8: Mounting the subracks into rack
......................................................................................................... 3-273-27
EBS-2000 installation
Overview
.................................................................................................................................................................................... 3-343-34
Hardware items
........................................................................................................................................................................ 3-353-35
Technical data for rack
.......................................................................................................................................................... 3-363-36
Procedure 3-9: Eye bolts
....................................................................................................................................................... 3-393-39
Procedure 3-10: Floor mounting
........................................................................................................................................ 3-403-40
Procedure 3-11: Top mounting
........................................................................................................................................... 3-453-45
Procedure 3-12: Rack extension (width)
........................................................................................................................ 3-473-47
Procedure 3-13: Rack extension (height)
....................................................................................................................... 3-493-49
Procedure 3-14: Rack adapter kit
...................................................................................................................................... 3-513-51
Technical data for PDP
.......................................................................................................................................................... 3-543-54
Technical data for subrack
................................................................................................................................................... 3-563-56
Procedure 3-15: Mounting the subracks into rack
....................................................................................................... 3-583-58
Contents
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
v
4 System cabling and final assembly
Overview
....................................................................................................................................................................................... 4-14-1
Power and ground cable installation
Overview
....................................................................................................................................................................................... 4-54-5
Power wiring (External battery - PDP)
.............................................................................................................................. 4-64-6
Procedure 4-1: Power wiring (PDP - PI/100)
................................................................................................................ 4-104-10
Power wiring (PI/100 - Fan unit)
....................................................................................................................................... 4-164-16
Procedure 4-2: Ground wiring
............................................................................................................................................ 4-204-20
Internal cable installation
Overview
.................................................................................................................................................................................... 4-234-23
Cable management
.................................................................................................................................................................. 4-244-24
Controller cable (CI-CTL Fan unit)
.............................................................................................................................. 4-274-27
Procedure 4-3: Subrack alarm wiring
.............................................................................................................................. 4-304-30
Station alarm wiring
............................................................................................................................................................... 4-344-34
External cable installation
Overview
.................................................................................................................................................................................... 4-384-38
STM-1e interface
..................................................................................................................................................................... 4-394-39
Procedure 4-4: STM-1e cable assembly instructions
................................................................................................. 4-464-46
DS3/EC1 interface
.................................................................................................................................................................. 4-494-49
Miscellaneous Discrete Inputs/Outputs (MDIs/MDOs)
............................................................................................ 4-524-52
User byte interfaces (G.703/V.11)
..................................................................................................................................... 4-574-57
TI-DS1 Station clock I/O interface (100/110 Ω)
......................................................................................................... 4-614-61
TI-E1 Station clock I/O interface (120 Ω)
..................................................................................................................... 4-654-65
TI-E1 Station clock I/O interface (75 Ω)
........................................................................................................................ 4-684-68
LA 10/100 Base-T interface
............................................................................................................................................. 4-714-71
Contents
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
vi
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
365-374-198R10.5.4
Issue 1 July 2009
Fiber cabling
Overview
.................................................................................................................................................................................... 4-754-75
Optical circuit packs
............................................................................................................................................................... 4-764-76
Gigabit Ethernet circuit packs
............................................................................................................................................ 4-854-85
Fiber engineering rules
.......................................................................................................................................................... 4-884-88
Application of attenuators
.................................................................................................................................................... 4-954-95
Installation of doors and side cover plates
Overview
.................................................................................................................................................................................... 4-964-96
Procedure 4-5: Side cover plates
....................................................................................................................................... 4-974-97
Procedure 4-6: Rack doors
................................................................................................................................................ 4-1004-100
5 Power, software, and circuit pack installation
Overview
....................................................................................................................................................................................... 5-15-1
Powering
Overview
....................................................................................................................................................................................... 5-25-2
Procedure 5-1: Switching on and testing the supply voltage
..................................................................................... 5-45-4
Procedure 5-2: Fan unit test
................................................................................................................................................... 5-85-8
Software and circuit pack installation
Overview
.................................................................................................................................................................................... 5-115-11
Procedure 5-3: WaveStar
®
CIT installation
................................................................................................................... 5-125-12
Procedure 5-4: Starting the WaveStar
®
CIT application
........................................................................................... 5-185-18
Procedure 5-5: E software installation
......................................................................................................................... 5-195-19
Circuit packs
.............................................................................................................................................................................. 5-325-32
Configuration rules
................................................................................................................................................................. 5-405-40
Procedure 5-6: Mounting the circuit packs
.................................................................................................................... 5-545-54
Physical installation check
................................................................................................................................................... 5-625-62
Contents
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
vii
6 Exit checklist Part I
Overview
....................................................................................................................................................................................... 6-16-1
Physical and power installation exit checklist
................................................................................................................. 6-26-2
Power supply measurements
.................................................................................................................................................. 6-36-3
Part II: NE provisioning and stand-alone installation test
7 NE provisioning
Overview
....................................................................................................................................................................................... 7-17-1
E login
Overview
....................................................................................................................................................................................... 7-27-2
Connecting the WaveStar
®
CIT to the E
........................................................................................................................ 7-37-3
Procedure 7-1: E login via OSI
......................................................................................................................................... 7-77-7
Procedure 7-2: E login via TCP/IP
................................................................................................................................ 7-117-11
Provisioning system parameters
Overview
.................................................................................................................................................................................... 7-137-13
Procedure 7-3: Changing the E name (TID)
.............................................................................................................. 7-147-14
Procedure 7-4: System parameters
.................................................................................................................................... 7-167-16
Procedure 7-5: LA port configuration for TCP/IP access
..................................................................................... 7-237-23
Procedure 7-6: E password aging
.................................................................................................................................. 7-297-29
Procedure 7-7: E date and time
....................................................................................................................................... 7-317-31
Procedure 7-8: Mounting the CTL protection unit
...................................................................................................... 7-347-34
Procedure 7-9: External timing references
..................................................................................................................... 7-357-35
Procedure 7-10: System timing
.......................................................................................................................................... 7-387-38
Procedure 7-11: External timing inputs
........................................................................................................................... 7-427-42
8 Stand-alone test procedures
Overview
....................................................................................................................................................................................... 8-18-1
Procedure 8-1: LED test
.......................................................................................................................................................... 8-28-2
Contents
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
viii
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
365-374-198R10.5.4
Issue 1 July 2009
Procedure 8-2: Alarm reporting tests .................................................................................................................................. 8-38-3
Procedure 8-3: E synchronization test
............................................................................................................................ 8-88-8
Procedure 8-4: Optical power meter test
......................................................................................................................... 8-118-11
Procedure 8-5: Receiver sensitivity test
.......................................................................................................................... 8-168-16
Procedure 8-6: DS3 transmission and protection test
................................................................................................ 8-248-24
Procedure 8-7: Optical port transmission test (daisy chain test)
............................................................................ 8-328-32
Procedure 8-8: XC and CTL protection test
.................................................................................................................. 8-388-38
9 Exit checklist Part II
Overview
....................................................................................................................................................................................... 9-19-1
E provisioning and stand-alone installation test exit checklist
.............................................................................. 9-29-2
Optical output power measurements
................................................................................................................................... 9-39-3
Part III: Network establishment and testing
10 Network establishment and testing
Overview
.................................................................................................................................................................................... 10-110-1
etwork establishment
Overview
.................................................................................................................................................................................... 10-310-3
Procedure 10-1: Connecting the fiber cables
................................................................................................................ 10-410-4
Procedure 10-2: Provision DCC
...................................................................................................................................... 10-1210-12
Procedure 10-3: WaveStar
®
CIT remote login test via DCC
................................................................................ 10-1510-15
Procedure 10-4: Line timing test setup
......................................................................................................................... 10-1810-18
Procedure 10-5: 1+1 MSP/APS test setup
................................................................................................................... 10-2310-23
Procedure 10-6: 2-fiber MS-SPRing/BLSR test setup
............................................................................................ 10-2910-29
Procedure 10-7: 4-fiber MS-SPRing/BLSR test setup
............................................................................................ 10-3610-36
Procedure 10-8: SCP/UPSR test setup
...................................................................................................................... 10-4310-43
Test procedures
Overview
.................................................................................................................................................................................. 10-5010-50
Contents
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
ix
Procedure 10-9: Line timing test ..................................................................................................................................... 10-5110-51
Procedure 10-10: 1+1 MSP/APS test
............................................................................................................................ 10-5410-54
Procedure 10-11: 2-fiber MS-SPRing/BLSR test
..................................................................................................... 10-5910-59
Procedure 10-12: 4-fiber MS-SPRing/BLSR test
..................................................................................................... 10-6510-65
Procedure 10-13: SCP/UPSR test
............................................................................................................................... 10-7110-71
OS provisioning
Overview
.................................................................................................................................................................................. 10-7810-78
Procedure 10-14: Setting the IP address and OS system parameters of the SC nodes
..................... 10-8110-81
Procedure 10-15: Optical port provisioning for SC
.............................................................................................. 10-8410-84
Procedure 10-16: DCC provisioning for SC
........................................................................................................... 10-8610-86
Procedure 10-17: Launching the WaveStar
®
CIT OS application for the first time
............................. 10-8810-88
OS test
Overview
.................................................................................................................................................................................. 10-9110-91
Procedure 10-18: Path creation test
................................................................................................................................ 10-9410-94
Procedure 10-19: Path restoration test
.......................................................................................................................... 10-9710-97
Procedure 10-20: Path deletion test
................................................................................................................................ 10-9810-98
Procedure 10-21: 1+1 protection test
............................................................................................................................. 10-9910-99
11 Exit checklist Part III
Overview
.................................................................................................................................................................................... 11-111-1
etwork establishment and testing exit checklist
........................................................................................................ 11-211-2
Completion form
...................................................................................................................................................................... 11-311-3
A Installation troubleshooting
Overview
...................................................................................................................................................................................... A-1A-1
Procedure A-1: Power failure
............................................................................................................................................... A-2A-2
Procedure A-2: Fan unit test failure
................................................................................................................................... A-4A-4
Procedure A-3: E synchronization failure
.................................................................................................................... A-6A-6
Contents
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
x
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
365-374-198R10.5.4
Issue 1 July 2009
Procedure A-4: CTL failure .................................................................................................................................................. A-8A-8
Procedure A-5: CTL protection test failure
................................................................................................................... A-10A-10
Procedure A-6: XC protection test failure
..................................................................................................................... A-11A-11
Procedure A-7: Circuit pack alarm handling
................................................................................................................ A-12A-12
Procedure A-8: LED test failure
....................................................................................................................................... A-14A-14
Procedure A-9: Exchange of the User Panel (UPL) cable
....................................................................................... A-16A-16
Procedure A-10: Remote login failure
............................................................................................................................ A-19A-19
Procedure A-11: Alarm handling
...................................................................................................................................... A-22A-22
Procedure A-12: Switching off an E
............................................................................................................................ A-23A-23
Procedure A-13: Fiber cleaning
........................................................................................................................................ A-24A-24
Procedure A-14: Replacing LC-type LBOs
.................................................................................................................. A-27A-27
Procedure A-15: Removing the SFP modules
............................................................................................................. A-28A-28
B Passive WDM (OEM equipment)
Overview
...................................................................................................................................................................................... B-1B-1
Hardware items
.......................................................................................................................................................................... B-2B-2
Technical data
............................................................................................................................................................................. B-3B-3
Procedure B-1: Carrier mounting
........................................................................................................................................ B-4B-4
Arrangements
............................................................................................................................................................................. B-9B-9
Cabling
....................................................................................................................................................................................... B-10B-10
C DCM (OEM equipment)
Overview
...................................................................................................................................................................................... C-1C-1
Procedure C-1: DCM mounting
........................................................................................................................................... C-2C-2
DCM arrangements
.................................................................................................................................................................. C-3C-3
DCM cabling
.............................................................................................................................................................................. C-4C-4
DCM module interface
........................................................................................................................................................... C-5C-5
Contents
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
xi
D Mixed configuration: 1675 LambdaUnite MSS and 1663 ADMu
Overview
...................................................................................................................................................................................... D-1D-1
Procedure D-1: Mounting the 1663 ADMu PDP
.......................................................................................................... D-3D-3
Procedure D-2: Mounting the 1663 ADMu subrack(s)
............................................................................................... D-5D-5
Procedure D-3: Mounting a fan unit
.................................................................................................................................. D-7D-7
Procedure D-4: Mounting the airguide
............................................................................................................................. D-9D-9
Procedure D-5: Mounting the 1675 LambdaUnite MSS subrack
......................................................................... D-10D-10
Procedure D-6: Mounting the circuit breakers
............................................................................................................ D-13D-13
Procedure D-7: Mounting the anti-recirculation plate
.............................................................................................. D-14D-14
Result
.......................................................................................................................................................................................... D-15D-15
E Mixed configuration: 1675 LambdaUnite MSS and 1665 DMX (High Capacity)
Overview
...................................................................................................................................................................................... E-1E-1
Procedure E-1: Mounting the 1675 LambdaUnite MSS subrack
............................................................................ E-2E-2
Procedure E-2: Mounting the heat baffle
.......................................................................................................................... E-5E-5
Procedure E-3: Mounting the Metropolis
®
DMX (High Capacity) subrack
....................................................... E-6E-6
Procedure E-4: Mounting the anti-recirculation plate
.................................................................................................. E-7E-7
Result
............................................................................................................................................................................................. E-9E-9
Glossary
Index
Contents
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
xii
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
365-374-198R10.5.4
Issue 1 July 2009
List of tables
1-1 Optical circuit pack specifications .................................................................................................................... 1-141-14
1-2 Laser classes (FDA/CDRH regulations) ......................................................................................................... 1-181-18
1-3 Laser classes (IEC 60825-1 standard) ............................................................................................................. 1-181-18
2-1 Required tools .......................................................................................................................................................... 2-122-12
2-2 Required test equipment ....................................................................................................................................... 2-122-12
2-3 Sequence of steps .................................................................................................................................................... 2-162-16
3-1 ETSI-2 rack specifications ..................................................................................................................................... 3-53-5
3-2 PDP specifications .................................................................................................................................................. 3-223-22
3-3 Subrack specifications ........................................................................................................................................... 3-253-25
3-4 EBS-2000 rack specifications ......................................................................................................................... 3-363-36
3-5 PDP specifications .................................................................................................................................................. 3-543-54
3-6 Subrack specifications ........................................................................................................................................... 3-563-56
4-1 Cable list ....................................................................................................................................................................... 4-34-3
4-2 Available PI cables ................................................................................................................................................. 4-104-10
4-3 Pin assignment (PI cables) ................................................................................................................................... 4-154-15
4-4 Available fan power cables .................................................................................................................................. 4-164-16
4-5 Pin assignments (fan power cables) ................................................................................................................. 4-174-17
4-6 Available controller cables ................................................................................................................................... 4-274-27
4-7 Pin assignments (Controller cable) ................................................................................................................... 4-284-28
4-8 Available subrack alarm cables .......................................................................................................................... 4-304-30
4-9 Pin assignments (subrack alarm cables) ......................................................................................................... 4-314-31
4-10 Pin assignment (station alarm cable) ............................................................................................................... 4-354-35
4-11 Connector/wire technical data (Single coax cable, STM-1e) .................................................................. 4-404-40
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
xiii
4-12 Pin assignment (MDI/MDO cables) ................................................................................................................. 4-534-53
4-13 Pin assignment (user byte cables) ..................................................................................................................... 4-584-58
4-14 Pin assignment (DS1 station clock output cables, 100/110 Ω) .............................................................. 4-614-61
4-15 Pin assignment (DS1 station clock input cables, 100/110 Ω) ................................................................. 4-634-63
4-16 Pin assignment (E1 station clock output cables, 120 Ω) .......................................................................... 4-654-65
4-17 Pin assignment (E1 station clock input cables, 120 Ω) ............................................................................. 4-664-66
4-18 Pin assignment (E1 station clock output cables, 75 Ω) ............................................................................. 4-684-68
4-19 Pin assignment (E1 station clock input cables, 75 Ω) ............................................................................... 4-694-69
4-20 Pin assignment (LA cables, crossed) ............................................................................................................ 4-724-72
4-21 Pin assignment (LA cables, straight) ............................................................................................................ 4-734-73
4-22 When to use a rack extension ............................................................................................................................. 4-894-89
5-1 Association between EP51 slots and ECI51 slots ....................................................................................... 5-425-42
5-2 Association between EP51 slots and ECI51 protection groups ............................................................. 5-445-44
7-1 Elements of the Settings tab ................................................................................................................................ 7-217-21
7-2 Elements of the Date and Time screen ............................................................................................................ 7-327-32
8-1 Mean launched power ranges ............................................................................................................................. 8-138-13
8-2 Receiver sensitivity ................................................................................................................................................ 8-218-21
10-1 Power input ranges of the optical circuit packs ........................................................................................... 10-810-8
B-1 DWDM/CWDM specifications ........................................................................................................................... B-3B-3
B-2 Optical-channel allocations ................................................................................................................................... B-9B-9
List of tables
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
xiv
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
365-374-198R10.5.4
Issue 1 July 2009
List of figures
1-1 Laser warning labels .............................................................................................................................................. 1-121-12
1-2 ESD symbol .............................................................................................................................................................. 1-211-21
1-3 Climatic limits (transportation and storage) .................................................................................................. 1-261-26
1-4 Climatic limits (operation) ................................................................................................................................... 1-381-38
2-1 Floorplan guidelines (top view) ........................................................................................................................... 2-22-2
2-2 Floorplan guidelines (side view) .......................................................................................................................... 2-32-3
2-3 Grounding scheme .................................................................................................................................................... 2-62-6
2-4 ESP subrack bonding point .................................................................................................................................... 2-72-7
3-1 Rack layout (ETSI-2 rack) ..................................................................................................................................... 3-63-6
3-2 Eye bolt mounting ..................................................................................................................................................... 3-83-8
3-3 Top/Bottom plate layout (ETSI-2 rack) ............................................................................................................. 3-93-9
3-4 Floor mounting (ETSI-2 rack) ............................................................................................................................ 3-113-11
3-5 Anchoring kit SE12150W-1 CC408414951 ........................................................................................... 3-123-12
3-6 Mounting holes (ETSI-2 rack) ........................................................................................................................... 3-133-13
3-7 Top mounting fixture (ETSI-2 rack) ................................................................................................................ 3-143-14
3-8 Mounting the rack extension (width) ............................................................................................................... 3-163-16
3-9 Rack extension height, 600 mm ......................................................................................................................... 3-183-18
3-10 Rack extension height, 750 mm ......................................................................................................................... 3-183-18
3-11 Rack line-up without rack extensions (width) .............................................................................................. 3-203-20
3-12 Rack line-up with rack extensions (width) .................................................................................................... 3-213-21
3-13 PDP layout ................................................................................................................................................................. 3-233-23
3-14 Mounting the MDIO terminal rail ..................................................................................................................... 3-243-24
3-15 Subrack mounting dimensions ........................................................................................................................... 3-263-26
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
xv
3-16 Subrack mounting ................................................................................................................................................... 3-303-30
3-17 Fiber guide mounting ............................................................................................................................................. 3-323-32
3-18 Mounting positions (ETSI-2 rack) .................................................................................................................... 3-333-33
3-19 Rack layout (EBS-2000 rack) ......................................................................................................................... 3-373-37
3-20 Eye bolt mounting ................................................................................................................................................... 3-393-39
3-21 Top/Bottom layout of plate (EBS-2000 rack) ........................................................................................... 3-403-40
3-22 Drilling template (EBS-2000 rack) ............................................................................................................... 3-413-41
3-23 Floor mounting (EBS-2000 rack) .................................................................................................................. 3-423-42
3-24 Anchoring kit (EBS-2000 rack) ..................................................................................................................... 3-433-43
3-25 Shim plates (EBS-2000 rack) .......................................................................................................................... 3-443-44
3-26 Mounting holes (EBS-2000 rack) .................................................................................................................. 3-453-45
3-27 Top mounting fixture (EBS-2000 rack) ....................................................................................................... 3-463-46
3-28 Mounting the rack extension (width) ............................................................................................................... 3-483-48
3-29 Rack extension height, 600 mm ......................................................................................................................... 3-503-50
3-30 Rack extension height, 750 mm ......................................................................................................................... 3-503-50
3-31 Rack line-up without rack extensions (width) .............................................................................................. 3-523-52
3-32 Rack line-up with rack extensions (width) .................................................................................................... 3-533-53
3-33 PDP layout ................................................................................................................................................................. 3-553-55
3-34 Subrack mounting dimensions ........................................................................................................................... 3-573-57
3-35 Subrack mounting ................................................................................................................................................... 3-613-61
3-36 Fiber guide mounting ............................................................................................................................................. 3-633-63
3-37 Mounting positions - two subracks (EBS-2000 rack) ............................................................................ 3-643-64
3-38 Mounting positions - one subrack (EBS-2000 rack) .............................................................................. 3-653-65
4-1 Cable block diagram ................................................................................................................................................. 4-24-2
4-2 PDP connection (power input cables) ................................................................................................................ 4-64-6
4-3 Securing the power input cables .......................................................................................................................... 4-84-8
4-4 Routing the power input cables ............................................................................................................................ 4-94-9
List of figures
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
xvi
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
365-374-198R10.5.4
Issue 1 July 2009
4-5 PDP connection (PI cables) ................................................................................................................................. 4-114-11
4-6 Routing the PI cables (PDP side) ...................................................................................................................... 4-124-12
4-7 Connecting the PI cables (PI/100 / subrack side) ........................................................................................ 4-144-14
4-8 Fan power cable ....................................................................................................................................................... 4-164-16
4-9 Routing to the fan unit ........................................................................................................................................... 4-184-18
4-10 Routing to the PIs .................................................................................................................................................... 4-194-19
4-11 PDP grounding ......................................................................................................................................................... 4-204-20
4-12 Office and subrack grounding ............................................................................................................................ 4-224-22
4-13 Cable management (top access) ......................................................................................................................... 4-254-25
4-14 Cable management (bottom access) ................................................................................................................. 4-264-26
4-15 Controller cable ....................................................................................................................................................... 4-284-28
4-16 Routing of the controller cable ........................................................................................................................... 4-294-29
4-17 Connectors of the subrack alarm cables ......................................................................................................... 4-314-31
4-18 Routing the subrack alarm cables (PDP side) ............................................................................................... 4-324-32
4-19 Connections of the subrack alarm cables (PDP side) ................................................................................. 4-324-32
4-20 Routing the subrack alarm cables (subrack side) ........................................................................................ 4-334-33
4-21 Connector of the station alarm cable ................................................................................................................ 4-354-35
4-22 Routing the station alarm cable .......................................................................................................................... 4-374-37
4-23 Layout (Single coax cable, STM-1e) ............................................................................................................... 4-394-39
4-24 Layout (Multi coax cable, STM-1e) ................................................................................................................. 4-404-40
4-25 STM-1e cabling with rack extension (width) ............................................................................................... 4-414-41
4-26 STM-1e cabling without rack extension (width) ......................................................................................... 4-424-42
4-27 Mounting of the cable bracket ............................................................................................................................ 4-434-43
4-28 STM-1e cabling with rack extension (width) ............................................................................................... 4-444-44
4-29 Mounting of the cable bracket ............................................................................................................................ 4-454-45
4-30 IMS assembly procedure ...................................................................................................................................... 4-474-47
4-31 Crimp tool and die .................................................................................................................................................. 4-484-48
List of figures
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
xvii
4-32 Example of mounted ECI51 interface paddle board .................................................................................. 4-494-49
4-33 DS3/EC1 cabling without rack extension (width) ...................................................................................... 4-514-51
4-34 Connector of the MDI/MDO cables ................................................................................................................. 4-534-53
4-35 Routing the MDI/MDO cable (subrack side) ................................................................................................ 4-544-54
4-36 Routing via the MDIO terminal rail ................................................................................................................. 4-554-55
4-37 Connector of the user byte cables ..................................................................................................................... 4-584-58
4-38 Routing the user byte cables ............................................................................................................................... 4-604-60
4-39 Connector of the 100/110 DS1 station clock output cables ................................................................ 4-614-61
4-40 Connector of the 100/110 DS1 station clock input cables .................................................................. 4-634-63
4-41 Routing the station clock I/O cables ................................................................................................................ 4-644-64
4-42 Connector of the 120 E1 station clock output cables ............................................................................ 4-654-65
4-43 Connector of the 120 E1 station clock input cables .............................................................................. 4-664-66
4-44 Routing the station clock I/O cables ................................................................................................................ 4-674-67
4-45 Connector of the 75 E1 station clock output cables .............................................................................. 4-684-68
4-46 Connector of the 75 E1 station clock input cables ................................................................................. 4-694-69
4-47 Routing the station clock I/O cables ................................................................................................................ 4-704-70
4-48 CIT connection (LA crossed) .......................................................................................................................... 4-724-72
4-49 Routing LA1 (User Panel) ............................................................................................................................... 4-724-72
4-50 HUB connection (LA straight) ....................................................................................................................... 4-734-73
4-51 Routing LA2, LA3 and LA4 (CI-CTL) ................................................................................................ 4-744-74
4-52 OP155M layout ........................................................................................................................................................ 4-774-77
4-53 OPLB/PAR8 parent board with OM155 SFP modules .............................................................................. 4-784-78
4-54 OP622 layout ............................................................................................................................................................ 4-794-79
4-55 OP2G5 layout ........................................................................................................................................................... 4-804-80
4-56 OP2G5/PWDM with OM2G5/PWDM modules ......................................................................................... 4-814-81
4-57 OP10 layout ............................................................................................................................................................... 4-824-82
4-58 OP10D/PAR2 with OM10 modules ................................................................................................................. 4-834-83
List of figures
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
xviii
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
365-374-198R10.5.4
Issue 1 July 2009
4-59 OP10D/PAR2XFP layout ..................................................................................................................................... 4-844-84
4-60 GE1 circuit packs .................................................................................................................................................... 4-864-86
4-61 GE10PL1/1A8 circuit pack ................................................................................................................................. 4-874-87
4-62 Special fiber guide .................................................................................................................................................. 4-884-88
4-63 Side guides ................................................................................................................................................................. 4-884-88
4-64 Fiber clip .................................................................................................................................................................... 4-894-89
4-65 General fiber management ................................................................................................................................... 4-904-90
4-66 Routing without rack extension (1 subrack) ................................................................................................. 4-914-91
4-67 Routing with rack extension (1 subrack) ........................................................................................................ 4-924-92
4-68 Routing without rack extension (2 subracks) ................................................................................................ 4-934-93
4-69 Routing with rack extension (2 subracks) ...................................................................................................... 4-944-94
4-70 Side cover plate mounting onto the rack frame ........................................................................................... 4-984-98
4-71 Side cover plate mounting onto the rack extension .................................................................................... 4-994-99
4-72 Installing the rack doors ..................................................................................................................................... 4-1014-101
4-73 Opening the rack doors ....................................................................................................................................... 4-1024-102
4-74 Installing the door lock ....................................................................................................................................... 4-1034-103
5-1 PI/100 switching ........................................................................................................................................................ 5-55-5
5-2 “Breaker-less” PIs (PI/100 OCB) ..................................................................................................................... 5-75-7
5-3 Fan unit LEDs ............................................................................................................................................................. 5-85-8
5-4 Rubber air flow baffles ............................................................................................................................................ 5-95-9
5-5 Blank face plate (3) CC848782868 ........................................................................................................ 5-365-36
5-6 Blank face plate (3) with LC parking positions CC848840112 ................................................... 5-375-37
5-7 Four-slot front cover plate CC849082573 ............................................................................................... 5-385-38
5-8 Blank face plate (6) CC848782876 ........................................................................................................ 5-395-39
5-9 Slot positions of the circuit packs ..................................................................................................................... 5-405-40
5-10 EP51 slot assignment ............................................................................................................................................. 5-425-42
5-11 EP51/ECI51 slot association ............................................................................................................................... 5-435-43
List of figures
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
365-374-198R10.5.4
Issue 1 July 2009
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
xix
5-12 ECI51 protection group assignment ................................................................................................................. 5-455-45
5-13 LXC configuration rules with XC160 ............................................................................................................. 5-475-47
5-14 LXC configuration rules with XC320 ............................................................................................................. 5-495-49
5-15 LXC configuration rules with XC640 ............................................................................................................. 5-515-51
5-16 Undamaged connector blocks ............................................................................................................................. 5-555-55
5-17 Undamaged/damaged EMI shields ................................................................................................................... 5-565-56
5-18 Undamaged guide headers ................................................................................................................................... 5-565-56
7-1 Direct LA access (point-to-point) .................................................................................................................... 7-37-3
7-2 WaveStar
®
CIT LA access (network) ............................................................................................................. 7-47-4
7-3 WaveStar
®
CIT access via DCC .......................................................................................................................... 7-57-5
7-4 WaveStar
®
CIT access via TCP/IP ...................................................................................................................... 7-67-6
7-5 WaveStar
®
CIT access via IP network (Intranet) ........................................................................................... 7-67-6
7-6 Screen of the Settings tab ..................................................................................................................................... 7-217-21
7-7 Date and Time screen ............................................................................................................................................ 7-327-32
7-8 System timing screen ............................................................................................................................................. 7-417-41
8-1 Mean launched power test ................................................................................................................................... 8-128-12
8-2 Receiver sensitivity test ........................................................................................................................................ 8-188-18
8-3 DS3 transmission test ............................................................................................................................................ 8-258-25
8-4 Daisy chain test ........................................................................................................................................................ 8-348-34
8-5 XC and CTL protection test ................................................................................................................................ 8-408-40
10-1 Protected ring configuration ................................................................................................................................ 10-610-6
10-2 Build-out block with LC LBO ......................................................................................................................... 10-1010-10
10-3 Shuttered LC LBO ............................................................................................................................................... 10-1010-10
10-4 AllWave LC and SC attenuators ..................................................................................................................... 10-1010-10
10-5 Remote login test via DCC ............................................................................................................................... 10-1610-16
10-6 Line timing test setup .......................................................................................................................................... 10-1910-19
10-7 1+1 MSP/APS test setup .................................................................................................................................... 10-2510-25
List of figures
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
xx
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
365-374-198R10.5.4
Issue 1 July 2009
/