Heat & Glo • 6K, 6K-LP, 8K, 8K-LP Installation Manual • 2581-980 Rev. D • 9/23
6
I. Requirements for the Commonwealth of
Massachusetts
-
Installation of Carbon Monoxide Detectors
-
-
-
-
Approved Carbon Monoxide Detectors
-
Signage
-
-
“GAS
VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OB-
STRUCTIONS”.
Inspection
-
-
Exemptions
-
MANUFACTURER REQUIREMENTS
Gas Equipment Venting System Provided
Gas Equipment Venting System NOT Provided
-
-
-
-
-
-
See Gas Connection section for additional Common-
wealth of Massachusetts requirements.
Note: