Step-by-Step Installation Sequence
Installation Instructions
Mixx Tables, Benches, and Stools
7. Use the hammer to x the anchor into the drilled hole by giving it several
hammer blows.
8. Repeat steps 4 - 7 until all anchors are installed.
3.
2.
1.
4.
5.
6.
Mark the location of the holes with a pencil. To verify the alignment of the
anchor markings you may reference the bottom of page 3.
Unscrew the current glides on the bottom of your Mixx product and replace
them with the mounting glides. Make sure to align the shape of the glide with
the shape of the legs.
Place the Mixx product in the desired location. Apply the two pieces of the
double side tape to the top of the mounting glide. Place one plastic foot onto
the top making sure it is aligned properly with the shape of the glide. Repeat
the process on the bottom. Assemble the three remaining glides in the same
manner.
It is recommended that you start holes in sequential order from the
smaller to the larger drill bits to avoid oversized holes or holes drilled too
deep. Begin with 1/8" diameter drill bit followed by a 1/4" diameter bit.
Evacuate debris from mounting holes using compressed air and a steel wire
brush. This will create a clean environment for the anchor system.
Locate an anchor and adjust the nut so it is ush with the top of the anchor to
protect the threads from being damaged. Insert the anchor into the hole.