06-910 OCT 2011
SNAP-LOK ANCHOR (60-713)
INSTALLATION INSTRUCTIONS
1. Install and secure the snap-lok anchor base into an existing anchor socket
and secure by inserting anchor bolt through hole in snap-lok anchor base,
into the wedge in the anchor, and tighten.
2. When retrofitting a snap-lok anchor onto a standard ladder, the bottom 4”
of tube must be cut off of the ladder posts that would normally go into the
anchor socket. Drill two 3/8” holes as shown. (See fig. 1)
(Fig. 1)
Double button snap lock should be inserted into bottom of ladder posts,
and seated into top hole. Secure the ladder to the anchor by inserting 2-
1/2” bolt through bottom hole in ladder, and tighten with flat washer and
acorn nut.
WESTERN SALES AND MANUFACTURING PLANT
CORPORATE HEADQUARTERS
P.O. Box 400 1017 S.W. Berg Parkway
Canby, Oregon 97013
Phone (503) 266-2231 Fax (503) 266-4334
EASTERN MANUFACTURING PLANT
105 Challenger Drive
Portland, Tennessee 37148
Phone (615) 325-0770 Fax (615) 325-0775
www.srsmith.com
Cut 4” from bottom
of each vertical post.
Drill (2) 3/8” holes.
3/8” hole – 2.375” from
bottom of leg.
3/8” hole - .875” from
ottom of leg.