
English-2
© 2013 Midmark Corp. | 60 Vista Drive Versailles, OH 45380 USA | 1-800-643-6275 | 1-937-526-3662 |
TP200 Rev. A
Note
When power is connected, three LED’s
on the base station PC Board will illuminate
Step 5: Install compliance label.
A) Wipe any residue from table cladding.
B) Apply compliance label to table cladding.
To complete installation...
A) Install batteries in hand / foot controls.
B) Check for proper operation
C) Install PC Board cover.
Step 4: Connect wire harness.
A) Connect harness from antenna to base station PC Board.
B) Connect modular harness to base station PC Board and
to Machine Control PC Board.
Compliance
Label
Equipment Alert
Antenna connection is very delicate.
Do not kink wire or apply stress to connection.