ESAB 251cv Meter Kit Installation guide

Type
Installation guide
INSTALLATION INSTRUCTIONS
251cv Meter Kit
P/N 36699
To install kit, proceed as follows:
To prevent accidental electric shock, be sure input power cable is dis-
connected from power suppy before working inside the power source.
1) Remove the blank plate in the upper left corner of the 251cv front panel. Retain the four mounting screws.
2) Cut the wire tie which holds the wire harness to the back of the blank plate.
3) Check to verify the dip switches (SW1) on the meter board are set correctly as shown in the sketch below.
4) Connect the wire harness plug to P1 of the meter board and then install the meter into the front panel of the
251cv using the four screws removed in step #1.
5) Set the meter control switch to the desired display mode ( AMPS or VOLTS ) and commence welding.
O
N
3
2
1
4
AMPS
A
VOLTS
V
1
4
2
3
5
ITEM PANEL OF
NO. CODE NO. QTY. DESCRIPTION
1 32289GY 1 PANEL DIGITAL METER
2 38146 1 BOARD PC DIGITAL METER
3 951176 1 SOCKET STRIP SQ 10 PIN
4 951042 1 METER DIGITAL
5 680088 1 GUARD SWITCH
F-15-361
August, 1998
251cv Opt. Meter Kit Assembly, P/N 36699
F-15-361 8/98
  • Page 1 1

ESAB 251cv Meter Kit Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI