Replacement of 10" Display
Technical User Guide 5
2 Mounting guide
2.1 Recommended tools
Below follows a list of tools recommended for the installation.
Item Description
Cross-head screwdriver
Screwdriver straight slot (two)
Installation, servicing and troubleshooting of all electrical equipment must be carried out by quali-
fied personnel in compliance with the applicable national and international standard EN 60204-1
and any other EU standards that are applicable in Europe.
The installation of a power supply isolator is required for each motor and power supply to facilitate
voltage-free work on the electrical equipment. The power supply isolator is not included.
2.2 Preparing for replacement
When replacing, you have to use the following new parts:
• Display
• Front foil
• Mounting tool
• Any SD card for backup
2.3 Backup of existing setup and data
SKOV A/S recommend that backup of historical data is set to take place automatically once a day. This ensures
that a new backup will always be available. The automatic backup takes place at 1:30 a.m.
Although the house controller is set to backup automatically, it can be an advantage to make a new backup just
before the replacement is carried out. This ensures that the latest data is transferred.
Make a note of the main module and CAN protocol setup in the menu | Technical | Installation | Man-
ual installation | I/O modules.
If necessary, take photos of the pages and the installation menu Show connection ( | Technical | Instal-
lation | Show connection).
Note or take pictures of the values of the following settings (*If installed).
Function Preset value
House name
Temperature setpoint
Heat offset setpoint*
Humidity setpoint*
Minimum ventilation/animal
Batch day number
Number of animals
Main module
CAN protocol
If the controller is connected to a network with FarmOnline Explorer
IP setup
UTC time and UTC date