3. Stacking the CLM projector upon an SLM projector
Necessary tools
• 8 mm Allen wrench.
• 4 mm Allen wrench.
• 2,5 mm Allen wrench.
Necessary parts
• One spacer rotation ring.
•Oneflat spacer.
• One hexagon socket head cap screws M10 x 20.
• Three hexagon socket head cap screws M10 x 40.
How to install the CLM carry handle upon the CLM projector?
1. Place the carry handle upon the bottom of the projector as illustrated.
2. Insert the spacer rotation ring (reference 4) and a hexagon socket head cap screw M10 x 40 (reference 1) in the back fixation
hole so that a small rotation of the carry handle is still possible.
3. Insert a flat spacer (reference 3) and a hexagon socket head cap screw M10 x 20 (reference 2) in the fixation hole of the extra
support point.
4. Insert a hexagon socket head cap screw (reference 1) into both fixation holes at the front of the carry handle.
Note: If both front holes are not completely free, turn on the skew adjustment (reference 5) at the right side of the carry handle
until the holes are free.
1
2
3
1
4
5
Image 3-6
5. Fasten all screws (reference 1 & 2). Use a 8 mm Allen wrench.
3.3 Stacking t he CLM projector on top of an SLM projector
This procedure assumes that the CLM is equipped w ith a carry han dle (prepared for SLM stacking) and that
the SLM projector is equipped with rigging points on the top. See procedure "Installing the CLM carry handle
upon the CLM projector", page 10.
How to stack the CLM projector on top of an S
LM projector?
1. Place the CLM projector with carry handle upon the rigging points on top of the SLM projector.
R59770053 RIGGING KIT FOR CLM 07/10/2008
11