Table of contents
TABLE OF CON TENTS
1. Introduction ......................................................................................................... 3
1.1 Use of the kit ........................................................................................................................... 3
1.2 Content of the kit....................................................................................................................... 3
2. Removingthe oldcominterfaceunit ........................................................................... 5
2.1 Rem oving the input box ................................................................................................................ 5
2.2 Rem ove the keyboard and d isplay (only for SLM).................................................................................... 5
2.3 Removingtheprotection covers (onlyforSLM)....................................................................................... 6
2.4 Disconnecting com interface unit...................................................................................................... 7
2.5 Removingtheprocessorunit for SLM................................................................................................. 8
2.6 RemovingtheComInterfaceunit ..................................................................................................... 8
3. InstallationofthenewCominterface...........................................................................11
3.1 Mounting the PC-Card and battery.................................................................................................... 11
3.2 Mounting the Com Interface ........................................................................................................... 11
3.3 Mounting the proc essor unit (only for SLM )...........................................................................................12
3.4 Electrical connectionof theComInterfaceunit .......................................................................................12
3.5 Reinstall the protection covers (only forSLM) ........................................................................................13
3.6 Mounting the keyboard and display (only for SLM)...................................................................................14
3.7 Inserting the input box .................................................................................................................15
4. BarcoControl Manager ...........................................................................................17
4.1 General requirements..................................................................................................................17
4.2 About the control manager ............................................................................................................17
4.3 Control manager S tart Page...........................................................................................................18
4.4 Control..................................................................................................................................19
4.4.1 Start up ..........................................................................................................................20
4.4.2 General Control..................................................................................................................21
4.4.3 Source........................................................................................................................... 22
4.4.4 ImageSettings................................................................................................................... 23
4.4.5 Image Enhancement ............................................................................................................23
4.4.6 Lens adjustment.................................................................................................................24
4.4.7 Geometry adjustment ...........................................................................................................24
4.4.8 Blanking adjustment.............................................................................................................25
4.5 Configuration...........................................................................................................................26
4.5.1 Start up ..........................................................................................................................27
4.5.2 MailSetup.......................................................................................................................27
4.5.3 Security .......................................................................................................................... 28
4.5.4 Data & Time.....................................................................................................................29
4.5.5 Settings .......................................................................................................................... 30
4.6 Diagnostics.............................................................................................................................31
4.6.1 Start Up..........................................................................................................................32
4.6.2 General Status................................................................................................................... 32
4.6.3 Job Log ..........................................................................................................................32
4.6.4 Advanced Diagnostics...........................................................................................................33
R5976326 NETWORK UPGRA DE KIT 160120 03
1
Table of contents
2 R5976326 NETWORK UPGRA DE KIT 16012003
1. Introduction
1. INTRODUCTION
1.1 Use of the kit
Overview
The kit is used to be built in in a SLM series or ELM Director series projector so that the p rojector can be controlled via the Barco
Control M anager.
Required embedded projector software
SLM G5 projectors Version 1.30 or higher
SLM R6 p rojectors Version 1.30 or higher
SLM G8 projectors Version 1.10 or higher
SLM R8 p rojectors Version 1.10 or higher
ELM R12D projectors Version 3.10 or higher
ELM R18 projectors Version 1.10 or higher
1.2 Content of the kit
Content
The following parts are included in the kit:
R763738 Unit com interface 1
R763767 PC card 1
V327007 3V Lithium battery 1
Table 1-2
Anti Static Protection
Wear a wriste band which is connected to ground while handling the static sensitive parts.
R5976326 NETWORK UPGRA DE KIT 160120 03
3
1. Introduction
4 R5976326 NETWORK UPGRA DE KIT 16012003
2. Removing the old com interface unit
2. REMOVING THE OLD COM INTERFACE UNIT
2.1 Removing the input box
Necessary tools
Screwdriver 8 mm
How to remove
1. Power down the projector and disconnect the power cord from the wall outlet.
2. Loosen the indicate screws of the input box. (image 2-1, image 2-2)
3. Pull out the input box completely by both handlers.
Image 2-1
Removing the input box on a SLM projector
Image 2-2
Pull out the input box on a ELM projector
2.2 Remove the keyboard and display (only for SLM)
What should be done
The keyboard and display u nit should be remove to get access to the screws of the com interface unit.
R5976326 NETWORK UPGRA DE KIT 160120 03
5
2. Removing the old com interface unit
Necessary tools
Philips screwdriver
How to remove
1. Turn out the 3 screws. (image 2-3)
2. Take off the keypath.
3. Remove the connection. (image 2-4)
Image 2-3
Removing the keypath
Image 2 -4
Removing connector
2.3 Removing the protection covers (only for SLM)
How to remove
1. Turn out the four screws on the front side. (image 2-5)
2. Turn out both scr
ews on the right s ide. (image 2-6)
3. Take off the protection cover.
4. Turn out both side screws. (image 2-7)
5. Take out the processor protection cover.
Image 2-5
Removing the front screws
Image 2 -6
Removing the side screws
6 R5976326 NETWORK UPGRA DE KIT 16012003
2. Removing the old com interface unit
Image 2-7
Removing side screws processor protection
2.4 Disconnecting com interface unit
What should be disconnected for SLM
1. Disconnect the black connector w ith the green wires (1), c onnecting the com interface unit with the processor unit. (image 2-8)
2. Remove the 6 wires c onnector (2) by pulling it out.
3. Remove b oth 3 wires connectors (3) and (4) by pulling them out.
4. Remove the black connector w ith the blue wires (5).
5. Remove the gray flat cable (6) by opening first both black locks and then pulling ou t the cable.
Image 2-8
Electrical disconnection
What should be disconnected for ELM
1. Turn the input box upside down.
2. Disconnect the black c onnector with the gr een wire s (1). (image 2-9)
3. Disconnect the gray flat c able ( 2).
R5976326 NETWORK UPGRA DE KIT 160120 03
7
2. Removing the old com interface unit
Image 2-9
Electrical disconnection for ELM
2.5 Removing the processor unit for SLM
How to remove
1. Disconnect both gray flat cables. (image 2-10)
2. Turn out the 4 fixation screws.
3. Take out the module.
Image 2-10
Removing the processor un it
2.6 Removing the Com Interface unit
Necessary tools
Philips screwdriver
How to remove for SLM
1. Turn out the 2 indicated screws. (image 2- 11)
2. Turn out the 4 screws in the 4 corners inside the input box . (image 2-12)
3. Pull out the Com interface unit.
8
R5976326 NETWORK UPGRA DE KIT 16012003
2. Removing the old com interface unit
Image 2-11
Com interface unit removal
Image 2-12
Removing fixation screws
How to remove for ELM
1
.
T
urn out the 2 indicated screws. (im age 2-13)
2. Turn out the 4 screws in the 4 corners inside the input box . (image 2-14)
Image 2-13
Com interface unit removal
R5976326 NETWORK UPGRA DE KIT 160120 03 9
2. Removing the old com interface unit
Image 2-14
Com interface unit removal for ELM
10 R5976326 NETWORK UPGRA DE KIT 16012003
3. Installation of the new Com interface
3. INSTALLATION OF THE NEW COM INTERFACE
3.1 Mounting the PC-Card and battery
What has to be done?
If the PC card and battery are delivered as separate items, these two units have m oun ted on the Com Interface unit.
How to mount the PC ca rd
1. Locate the PC card socket.
2. Take the P C card between your two fingers and insert into the socket under an angle of 45
. Push a little until the card fits into
the socket and stays under that angle. (image 3-1)
3. Push on the indicated place until the P C card clicks into the socket.
Image 3-1
Mounting the PC card
How to mount the battery
1. Insert the battery with the + away from the printed circuit board. (image 3-2)
Image 3-2
Battery installation
3.2 Mounting the Com Interface
How to mount
1. Slide the Com Interface module i
nto the input box.
2. Turn in the 4 screws in the 4 corners inside the input box. (image 3-3, image 3-4)
3. Turn in the 4 screws on the front side of the Com interface unit. (image 3-5)
R5976326 NETWORK UPGRA DE KIT 160120 03
11
3. Installation of the new Com interface
Image 3-3
Mounting the Com interface for SLM
Image 3 -4
Mounting the Com interface unit for ELM
Image 3-5
3.3 Mounting the processor unit ( only for SLM)
How to mount
1. Hold the processor unit before the 4 fixation sockets and turn in the four screws. (image 3-6)
2. Connect both gray flatcables.
Image 3-6
3.4 Electrical connection of the Com Interface unit
What has to be connected for SLM
1. Connect the black connector with the green wires (1) to the processor unit. (image 3-7)
2. Connect the 6 wires connector (2).
3. Connect the co nnectors (3) and (4).
4. Connect t he black connector with the b lue wires (5).
5. Insert the gray flat cable (6) and close both black locks.
12
R5976326 NETWORK UPGRA DE KIT 16012003
3. Installation of the new Com interface
Image 3-7
What has to be connected for ELM
1. Connect the black connector with the green wires to t he indicated position (1). (image 3-8)
2. Insert the gray flat cable into its socket and secure its position (2).
Image 3-8
3.5 Reinstall the protection covers (only f or SLM)
How to install
1. Insert the protection cover, do not forget to pull the yellow wires through the provided hole.. (image 3-9)
2. Turn in both screws at the side of the input box.
3. Put the protection top cover on place. (image 3-10)
4. Turn in on the front side the 4 screws sec uring both covers. (image 3-11)
R5976326 NETWORK UPGRA DE KIT 160120 03
13
3. Installation of the new Com interface
Image 3-9 Image 3 -10
Image 3-11
3.6 Mounting t he keyboard and display (only for SLM)
How to mount
1. Connect the 6-wires c onnector into the keyboard unit. (image 3-12)
2. Put the keyboard and display unit on its place and secure with the 3 screws on the backside. (image 3-13)
Image 3-12
Image 3 -13
14 R5976326 NETWORK UPGRA DE KIT 16012003
3. Installation of the new Com interface
3.7 Inserting the input box
How to insert
1. Take the input box on the handles and ins ert the m odule in the projector.
2. Push the box un til the connector fits into its so cket.
3. Secure this position by turning the 4 screws a quarter of a turn clockwise. (image 3-14, image 3-15)
4. Connect the power cord again and the pr ojector is ready to start up.
Image 3-14
Mounting the input box into the SLM projector
Image 3-15
Mounting the input box into the ELM projector
R5976326 NETWORK UPGRA DE KIT 160120 03 15
3. Installation of the new Com interface
16 R5976326 NETWORK UPGRA DE KIT 16012003
4. Barco Control Manager
4. BARCO CONTROL MANAGER
Overview
General r equirements
About the control manager
Control man ager Start Pa ge
Control
Configuration
Diagnostics
4.1 General requirements
Functionality
Controlling and monitoring of the projector settings. Remo te diagnostics to detect potential errors.
Computer requirements
A com puter with standard web browser ( Internet explorer) c onnected to a LA N (local area network) is sufficient to run the control
manager and to get access to the projector.
As Java technology (Java Applets)is used, the application isdownloaded wh en needed and run within a web browser. Unfortunately,
not all w eb brow sers prov ide this possibility.
The Barco Control Manager has been successfully tested on Microsoft Windows pla
tform (98/NT 4.0/Windows 2000) with Internet
Explorer 4.0. On other platforms and with other browsers, it should run fine when the browser supports Java Applets and supports
the Java Swing library. As an alternative, when on a spec ific platform there is no browser supporting the above requirements, it
should be possible to run the application using an Applet Viewer.
With most web b rowse rs, it is not the web browser itself that executes the Java applet b ut the Jav a Virtual
Machine(VM). E.g. for MicrosoftExplorer, thelatest Java VM can be foundat the followingURL :h
ttp://www.mi-
crosoft.com/java/vm/dl_vm40.htm
Required embedded projector software
SLM G5 projectors Version 1.30 or higher
SLM R6 p rojectors Version 1.30 or higher
SLM G8 projectors Version 1.10 or higher
SLM R8 p rojectors Version 1.10 or higher
ELM R12D projectors Version 3.10 or higher
ELM R18 projectors Version 1.10 or higher
4.2 About the c
ontrol m anager
Start up
To start up the Control Manager, follow the procedure as de scribed below :
1. Start u p your web browser.
2. In the Address bar of your web brower, s tart typing the IP address (or nick name) of the network projector. If you’ve typed a
similar entry before, AutoCom plete lists possible matches as you type. If a sugg estion in the list matches what you want to enter
in that field, click the suggestion. If not, c ontinue typing.
3. Press EN
TER to launch you request.
The projector acts as a web server and returns its start up page. (image 4-1)
R5976326 NETWORK UPGRA DE KIT 160120 03 17
4. Barco Control Manager
Image 4-1
Start up screen
Information on the Start Up page.
The nick name of the projector is shown in the m iddle of the screen. E.g. default indicated as ’Barco - projector ’. Below the loca-
tion of the projector, default indicated as ’Location’. This name and location can be replaced by any other nam e or location, see
Configuration window / Settings.
4.3 Control manager S tart Page
Starting up
1. Click on Enter to start up the Bar co Control Manager.
The Con trol M anager start p age will be displayed. (image 4-2)
Image 4-2
About screen
18 R5976326 NETWORK UPGRA DE KIT 16012003
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37

Barco Network Interface Kit SLMELM Installation guide

Category
Projectors
Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI