Toro 6" x 2' Rock Chain Kit, Dingo Compact Utility Loader Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Toro 6" x 2' Rock Chain Kit, Dingo Compact Utility Loader Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Form No. 3353-230 Rev -
6in x 2ft Rock Chain Kit
For Dingo® Compact Utility Loaders
Model No. 108–5544
Installation Instructions
Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Step
Description
Qty.
Use
1
No parts required
Remove the spoils auger.
Left, soil tooth
1
Thin spacer
4
Bolt (3/8 x 4 inches)
8
Locknut (3/8 inch)
24
Tube
37
Bolt (3/8 x 1-1/4 inches)
4
Left, rock tooth
6
Right, rock tooth
6
Thick spacer
4
Bolt (3/8 x 2-3/4 inches)
16
Bolt (3/8 x 3 inches)
4
2
Washer (3/8 x 3/4 inch)
24
Install the teeth.
3
No parts required
Install the spoils auger.
Note: Deter mine the left and right sides of the mac hine from the nor mal operating position.
Step
1
Removing the Spoils Auger
No Parts Required
Procedure
1. Lo w er the loader ar ms , stop the engine , and
remo v e the k ey .
2. R emo v e the bolt and n ut securing the spoils aug er
to the trenc her ( Figure 13 ).
3. Star t the engine and raise the loader ar ms slightly
(2 to 3 inc hes).
4. Stop the engine and remo v e the k ey .
5. R emo v e the aug er and retain the bolt and n ut.
© 2005—The Toro® Company
8111 Lyndale Avenue South
Bloomington, MN 55420
Register at www.Toro.com. Original Instructions (EN)
Printed in the USA.
All Rights Reserved
Step
2
Installing the Teeth
Parts needed for this step:
1
Left, soil tooth
4
Thin spacer
8
Bolt (3/8 x 4 inches)
24
Locknut (3/8 inch)
37
Tube
4
Bolt (3/8 x 1-1/4 inches)
6
Left, rock tooth
6
Right, rock tooth
4
Thick spacer
16
Bolt (3/8 x 2-3/4 inches)
4
Bolt (3/8 x 3 inches)
24
Washer (3/8 x 3/4 inch)
Procedure
T he c hain on y our trenc her comes from the factor y
with teeth designed to dig soil. T his kit contains the
par ts y ou need to con v er t the c hain into a 6 inc h cutting
width c hain for use on hard or roc k y g round. T he
c hain has 24 links , and eac h link can ha v e dig ging teeth
fastened to it and is refer red to as a tooth position. At
eac h tooth position, the teeth are fastened in v arious
configurations with spacers and tubes to v ar y the width
of cut. T he tooth configurations are ar rang ed along the
c hain to maximize dig ging efficiency .
T here are tw o types of teeth, soil and roc k teeth.
Cupped teeth are designed to cut through and remo v e
soil . R oc k teeth cut roc k and other hard g round. T he
teeth are cupped or angled differently de pending on
the side of the c hain to whic h they are fastened (left or
right). T he teeth are fastened to the c hain links with
bolts , n uts , tubes , and spacers of v ar ying sizes .
1. Lo w er the loader ar ms .
Note: Y ou do not need to tur n the engine on to
lo w er the ar ms .
2. R emo v e the teeth and other hardw are from the 12
links on the top span of the c hain.
Important: W hen r emo ving teeth, k eep the
components of each tooth set to gether so that
y ou can assemble them later . Some of the
teeth y ou r emo v e will be r equir ed later in this
pr ocedur e.
3. Star t the engine , raise the trenc her slightly off the
g round using the loader ar ms , and slo wly r un the
c hain forw ard to mo v e the other 12 links to the top .
4. Stop the engine and remo v e the k ey .
5. R emo v e the remaining teeth and other hardw are
from the c hain.
6. On an empty c hain link in the front of the trenc her ,
install a left, roc k tooth on the right side of the
c hain as illustrated in Figure 1 .
Important: Ensur e that the teeth point
f orw ard, a w ay fr om the tr encher body .
Figure 1
1. Chain link 4. Left, rock tooth
2. Locknut (3/8 inch) 5. Washer (3/8 x 3/4 inch)
3. Tube
6. Bolt (3/8 x 2-3/4 inches)
7. On the next c hain link (behind the first tooth y ou
installed, to w ard the body of the trenc her), install
a right, roc k tooth on the left side of the c hain as
illustrated in Figure 2 .
Figure 2
1. Chain link 4. Right, rock tooth
2. Locknut (3/8 inch) 5. Washer (3/8 x 3/4 inch)
3. Tube
6. Bolt (3/8 x 2-3/4 inches)
2
8. On the next c hain link bac k, install a left, soil tooth
on the right side of the c hain as illustrated in Figure
3 .
Figure 3
1. Chain link 4. Left, soil tooth
2. Locknut (3/8 inch) 5. Bolt (3/8 x 2-1/2 inches)
3. Tube
6. Bolt (3/8 x 7/8 inch)
9. On the next c hain link bac k, install a right, soil
tooth on the left side of the c hain as illustrated in
Figure 4 .
Figure 4
1. Chain link 4. Left, soil tooth
2. Locknut (3/8 inch) 5. Bolt (3/8 x 2-1/2 inches)
3. Tube
6. Bolt (3/8 x 7/8 inch)
10. On the next c hain link bac k, install a left, roc k
tooth on the left side of the c hain as illustrated in
Figure 5 .
Figure 5
1. Chain link 4. Left, rock tooth
2. Locknut (3/8 inch) 5. Washer (3/8 x 3/4 inch)
3. Tube
6. Bolt (3/8 x 2-3/4 inches)
11. On the next c hain link bac k, install a right, roc k
tooth on the right side of the c hain as illustrated
in Figure 6 .
Figure 6
1. Chain link 4. Right, rock tooth
2. Locknut (3/8 inch) 5. Washer (3/8 x 3/4 inch)
3. Tube
6. Bolt (3/8 x 2-3/4 inches)
3
12. On the next c hain link bac k, install a left, soil tooth
on the left side of the c hain as illustrated in Figure
7 .
Figure 7
1. Chain link
4. Bolt (3/8 x 7/8 inch)
2. Left, soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
13. On the next c hain link bac k, install a right, soil
tooth on the right side of the c hain as illustrated
in Figure 8 .
Figure 8
1. Chain link 4. Right, soil tooth
2. Bolt (3/8 x 2-1/2 inches)
5. Tube
3. Bolt (3/8 x 7/8 inch) 6. Locknut (3/8 inch)
14. On the next c hain link bac k, install a left, roc k
tooth and thic k spacer on the left side of the c hain
as illustrated in Figure 9 .
Figure 9
1. Chain link
5. Washer (3/8 x 3/4 inch)
2. Locknut (3/8 inch) 6. Bolt (3/8 x 4 inches)
3. Tube 7. Thick spacer
4. Left, rock tooth
15. On the next c hain link bac k, install a right, roc k
tooth and thic k spacer on the right side of the c hain
as illustrated in Figure 10 .
Figure 10
1. Chain link
5. Washer (3/8 x 3/4 inch)
2. Locknut (3/8 inch) 6. Bolt (3/8 x 4 inches)
3. Tube 7. Thick spacer
4. Right, rock tooth
4
16. On the next c hain link bac k, install a left, soil tooth
and a thin spacer on the left side of the c hain as
illustrated in Figure 11 .
Figure 11
1. Chain link
5. Bolt (3/8 x 1-1/4 inches)
2. Locknut (3/8 inch) 6. Bolt (3/8 x 3 inches)
3. Tube 7. Thin spacer
4. Left, soil tooth
17. On the next c hain link bac k, install a right, soil
tooth and a thin spacer on the right side of the
c hain as illustrated in Figure 12 .
Figure 12
1. Chain link
5. Bolt (3/8 x 1-1/4 inches)
2. Locknut (3/8 inch) 6. Bolt (3/8 x 3 inches)
3. Tube 7. Thin spacer
4. Right, soil tooth
18. On the next c hain link bac k, install another right,
soil tooth and a thin spacer on the right side of the
c hain as illustrated in Figure 12 .
19. T or que the all bolts and n uts y ou installed
previously to 27 to 33 ft-lb . (37 to 45 N m).
20. Star t the engine , raise the trenc her slightly off the
g round using the loader ar ms , and slo wly r un the
c hain forw ard to mo v e the other 12 links to the top .
21. Lo w er the loader ar ms , stop the engine , and
remo v e the k ey .
22. R e peat ste ps 7 through 19 (skip ste p 18 ).
Step
3
Installing the Spoils Auger
No Parts Required
Procedure
Important: F ailing to position the spoils auger
cor r ectl y may dama ge the tr encher .
1. Star t the engine and raise the loader ar ms slightly
(2 to 3 inc hes).
2. Stop the engine and remo v e the k ey .
3. Using the bolt and n ut y ou remo v ed previously ,
connect the spoils aug er to the aug er shaft. P air
the hole far thest from the aug er blade , in the end
of the aug er with 2 holes , with the inner hole on
the shaft ( Figure 13 ).
Figure 13
1. Spoils auger 3. Hole position for a 6 inch
chain.
2. Hole position for a 4 inch
chain.
4. T or que the bolt and n ut to 75 ft-lb . (101 N m).
5. Lo w er the loader ar ms .
5
Notes:
Notes:
/