YardLine OAKRIDGE 8 x 12 Assembly Manual

Type
Assembly Manual
16562
STOP!
STOP!
Call Us First!
DO NOT RETURN TO STORE.
For immediate help with assembly or product information
call our toll free number:
1-800-844-9273
or email:
customerservice@backyardproductsllc.com
Our staff is ready to provide assistance
April through October M-F 8:00 AM to 4:30 PM EST
Saturday 8:30 AM to 4:30 PM EST
November through March M - F 8:00 AM to 5:00 PM EST
(This page intentionally left blank.)
08-04-2017
KEEP THIS MANUAL FOR FUTURE REFERENCE
ACTUAL FLOOR SIZE IS 96 x 140-5/8" (243,8 x 357,2 cm)
16562
BEFORE YOU BEGIN
IMPORTANT!
READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
- CUSTOMER SERVICE -
Call: 1-800-844-9273 email: customerservice@backyardproductsllc.com
•BUILDINGRESTRICTIONSANDAPPROVALS
Be sure to check with local building department and homeowners association for specic restrictions and/ or requirements before building.
•ENGINEEREDDRAWINGS
Contact our Customer Service Team if engineered drawings are needed to pull local permits.
•SURFACEPREPARATION
To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are
listed on page 7.
•CHECKALLPARTS
Inventory all parts listed on pages 4 - 6. Contact our Customer Service Team if any parts are missing or damaged.
•ADDITIONALMATERIALS
You will need additional materials to complete your shed. See page 3 for required and optional materials and quantities.
OAKRIDGE 8' x 12' (244 x 366 cm)
ASSEMBLY MANUAL
ABackyardProductsCompany
Window Location
Optional
2
TOOLS
Safety! Always use approved safety glasses during assembly.
OptionalRequired
HELPFUL REMINDER SYMBOLS
Look for these symbols for helpful reminders throughout this manual.
ORIENT LUMBER AND TRIM FOR BEST APPEARANCE
= Assistance Required; two or more people.
= Ensure squareness.
= Important required step or operation.
= Helpful assembly hint.
= Mark part with pencil.
= Beginning of steps for assembly or installation.
= You have nished the assembly or installation.
= Level
Gloves
Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.
Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no way
negatively affect the strength or integrity of our product. (See Fig. A, B, C.)
A
Safety Glasses
Tape Measure
Paint Tools
Ladder
Caulk Gun
Hammer
Level
FINISH
BEGIN
Pencil
Phillips
Screwdriver Tool Belt/
Nail Pouch
Chalk Line
Nail Gun
• gun nails
Tin Snips
(for drip edge)
Square or
Utility Knife
Shingle Blades
B C
Drill / Driver
1/8" Drill Bit
#2 Philips Drive Bit
1/4" Drill Bit
5/16" Drill Bit
1/2" Drill Bit
3
COMPLETING YOUR SHED
You will need these additional materials:
OPTIONAL MATERIALS
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
DRIPEDGE.....................60Feet #15ROOFINGFELT
To cover 148 Sq. Ft. of roof area.
1"GALVANIZEDROOFINGNAILS.........1/4Lb
For roong felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS
FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TABSHINGLES............................7Bundles
PAINTFORSIDING..........................2Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK.................................................3Tubes
Use acrylic latex exterior caulk that is paintable.
1"GALVANIZEDROOFINGNAILS....3Lbs
For shingles.
PAINTFORTRIM.............................1Quart
Use 100% acrylic latex exterior paint.
WOODGLUE.......................ExteriorRated
• This shed kit includes a complete wood oor system.
• This shed kit does not include ANY leveling materials.
SeetheFLOORLEVELINGsectiononpage7forrecommendedmethodsandsuggestedmaterialstoproperlylevelyour
oor,asthiswillvarydependingonyourspecicsite.
WOODSIZECONVERSIONCHART
NominalBoardSize ActualSize
1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm
)
2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)
2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm
)
1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm
)
19/32" x 3"......19/32" x 2-1/2" (1,5 x 6,3 cm)
PARTS IDENTIFICATION AND SIZES
RS RS
Part identication
letters are stamped on some parts.
Check these locations for
part stamp.
Treated lumber is stamped:
Alltreatedlumber
isstamped:
WALLS
x4 2 x 4 x 89" (5,1 x 10,2 x 226,1 cm)
SZ
x1 2 x 3 x 84" (5,1 x 7,6 x 213,4 cm)
FW
x4 2 x 4 x 68-5/8" (5,1 x 10,2 x 174,3 cm)
YF
x16 2 x 4 x 68" (5,1 x 10,3 x 172,7 cm)
UM
x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
SP
x1 2 x 4 x 35-3/4" (5,1 x 10,2 x 90,8 cm)
RZ
x1 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
SP
x1 2 x 4 x 34-1/4" (5,1 x 10,2 x 87,0 cm)
XY
PARTS LIST
INVENTORY YOUR PARTS before you begin.
We suggest sorting parts by the category they are listed in.
RAFTERS
x11 7-1/4 x 18-1/4" (18,4 x 46,4 cm)
TRIM
x8 3/8 x 1-3/4 x 67-3/4" (1 x 4,4 x 172,1 cm)
x2 3/8 x 2-3/4 x 80-1/4" (1 x 7 x 203,8 cm)
x2 3/8 x 2-3/4 x 69" (1 x 7 x 175,3 cm)
x12 2 x 4 x 68-7/16" (5,1 x 10,2 x 173,8 cm)
YJ
x2 2 x 4 x 69-7/8" (5,1 x 10,2 x 177,5 cm)
WW
x1 19/32 x 4 x 69-7/8" (1,5 x 10,2 x 177,5 cm)
WML
x1 19/32 x 4 x 69-7/8" (1,5 x 10,2 x 177,5 cm)
WMR
x2 2 x 4 x 16-1/2" (5,1 x 10,2 x 41,9 cm)
RD
x1 2 x 4 x 17-3/4" (5,1 x 10,2 x 45,1 cm)
CXA
x2 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,2 cm)
AO
x1 2 x 4 x 10" (5,1 x 10,2 x 25,4 cm)
PWA
x2 2 x 3 x 11-7/8" (5,1 x 7,6 x 30,2 cm)
DQ
x1 2 x 4 x 13" (5,1 x 10,2 x 33,0 cm)
CWA
x1 2 x 4 x 4-5/8" (5,1 x 10,2 x 11,7 cm)
XTA
x2 3/8 x 2 x 5" (1,0 x 5,1 x 12,7 cm)
x1 19/32 x 3 x 30" (1,5 x 7,6 x 76,2 cm)
DLA
x6 19/32 x 3 x 30-1/8" (1,5 x 7,6 x 76,5 cm)
AZ x1 19/32 x 3 x 64-7/16" (1,5 x 7,6 x 163,7 cm)
DNA
x2 19/32 x 3 x 44-1/8" (1,5 x 7,6 x 112,1 cm)
DKA
x4 19/32 x 3 x 7-1/2" (1,5 x 7,6 x 19,1 cm)
CCR
x2 19/32 x 3 x 17" (1,5 x 7,6 x 43,1 cm)
EU
x2 19/32 x 3 x 11-1/2" (1,5 x 7,6 x 27,9 cm)
EFA
x4 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm)
TM
3/4"
(1,9 cm)
1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) Gauge Block for 3/4" (1,9 cm) measurement
x1 GAA
OSBORWOODGRAIN
x1 96" (243,8 cm) Z-STRIP
x1 19/32 x 3 x 28-1/2" (1,5 x 7,6 x 27,9 cm)
ROR
4
FLOOR
x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)
x10
x2 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm)
x2 1 x 2 x 96" (2,5 x 5,1 x 243,8 cm)
ZM
x4 2 x 3 x 68-7/16" (5,1 x 7,6 x 173,8 cm)
WE
x2 1 x 2 x 43-1/2" (2,5 x 5,1 x 110,5 cm)
WS
x4 19/32 x 3 x 23" (1,5 x 7,6 x 58,4 cm)
GI
x2 2 x 3 x 18-3/8" (5,1 x 7,6 x 50,2 cm)
WJ
OVERHANG
x2
x2 19/32 x 6-15/16 x 5-1/2" (1,5 x 17,6 x 13,4 cm)
SHELF
LOFT BENCH
SOFFIT
DOOR
UN
OO
x3
x2
2 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm)
PARTS LIST continued...
x2
x4
x2
x2
x2
x2
x2
2 x 3 x 5-1/8" (5,1 x 7,6 x 13 cm)
2 x 3 x 7-7/8" (5,1 x 7,6 x 20 cm)
3/8 x 7-7/8 x 57-7/8" (1 x 20 x 147 cm)
3/8 x 5-3/16 x 69-3/8" (1 x 13,2 x 176,2 cm)
3/8 x 5-3/16 x 72" (1 x 13,2 x 182,9 cm)
3/8 x 7-7/8 x 7-7/8" (1 x 20 x 20 cm)
3/8 x 5-13/16 x 7-7/8" (1 x 14,8 x 20 cm)
WD
DY
PL
x1 2 x 3 x 93" (5,1 x 7,6 x 236,2 cm)
TP
x1 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm)
x1 7-1/4 x 18-1/4" (18,4 x 46,4 cm) WITHWOODGRAINONFACE
19/32 x 6-15/16 x 5-1/2" (1,5 x 17,6 x 13,4 cm)
5
PANEL PARTS LIST
ROOF PANELS
SHELF, LOFT &
BENCH
FLOOR
NOTE:Panelpartsarenotstamped.
Shelf/Loftpanelsare7/16"(1,1cm)thick.
Floorpanelsare5/8"(1,6cm)thick.
Roofpanelsare7/16"(1,1cm)thick.
7/16 x 11-7/8 x 88-7/8"
(1,1 x 30,2 x 226,1 cm)
7/16 x 23-7/8 x 88-7/8"
(1,1 x 60,6 x 226,1 cm)
7/16 x 35-7/8 x 82"
(1,1 x 91,1 x 231,1 cm)
x1
x1
x1
7/16 x 47-7/8 x 48"
(1,1 x 121,6 x 121,9 cm)
x2
7/16 x 22 x 46-1/2"
(1,1 x 55,9 x 118,1 cm)
x2
7/16 x 8-7/8 x 70"
(1,1 x 22,5 x 177,8 cm)
x2
7/16 x 22 x 96"
(1,1 x 55,9 x 243,8 cm)
x2
7/16 x 48 x 94-1/2"
(1,1 x 121,9 x 240 cm)
5/8 x 48 x 96"
(1,6 x 121,9 x 243,8 cm)
5/8 x 44-5/8 x 96"
(1,6 x 113,3 x 243,8 cm)
x2
x2
x1
x2
3/8 x 44-5/8 x 72"
(1 x 113,3 x 182,9 cm)
x2
3/8 x 19-5/8 x 72"
(1 x 49,8 x 182,9 cm)
x6
3/8 x 48 x 72"
(1 x 121,9 x 182,9 cm)
WALL PANEL & DOORS PARTS LIST
x1
x1
x1
x1
x1
LEFTDOOR
x1
RIGHTDOOR
x3 BOXES
x6 BOXES
x275
x90
x14
x60
x7
x96
x64
x12
NAIL BOXES
VENT, DOOR HARDWARE, AND WINDOW
FASTENER/HARDWARE BAG
6
1-1/4" (3,2 cm)
2" (5,1 cm)
2-1/2" (6,4 cm)
3" (7,6 cm)
3/4" (1,9 cm)
2" (5,0 cm)
3" (7,6 cm)
2" (5,1 cm)
1-1/2" (3,8 cm)
x1
x1
x2 x2
x8
x2
x2
1/2" (1,3 cm)
8 x 16"
(20,3 x 35,6 cm)
3/4" (1,9 cm)
x12
1" (2,5 cm)
x4
x2
1-1/2" (3,8 cm)
x1 56" Metal Threshold
3/4" (1,9 cm) x18
Bagged seperately / special coating
x1
Large
Window Gable Window
Transom Window
7
D O O R
FLOOR LEVELING OPTIONS
There are multiple ways to level your oor frame. Our recommended leveling method is shown below.
Leveling materials are not included in this kit.
PREFERRED METHOD - 4x4 TREATED RUNNERS
Measurementsto
centersof4x4's.
• 3" Screws angled into 4x4.
• (2) at each point frame
and 4x4 touch.
12"
(30,5 cm)
12"
(30,5 cm)
• Level under 4x4 runners only.
• Locate leveling material 12" from ends of runners and no more than 48" apart.
• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use
shingles in direct contact with ground.
• For best results and aiding in water drainage use gravel under each concrete block.
LEVELINGMETHODS
If you are building your shed on a concrete foundation see the following page.
CONCRETE
MATERIALREQUIRED
x2 4" x 4" x 12' (10 x 10 x 366 cm)Treated Lumber
FastenersforFrameto4"x4".
(3" Screws shown as one option.) Minimum (40) 3" screws / exterior grade.
Useonlywoodtreatedforgroundcontactandfastenersapprovedforusewithtreatedwood.
Alwayssupportframeseams.
Levelinghigherthan16"notrecommended.
LEVELINGMATERIALS
Gravel
2x4 Treated Lumber
Solid Masonry Blocks in 1", 2", 4" or 8" thickness
Asphalt Shingles
8" Block
4" Block
Gravel
Gravel
Do not exceed 16".
4x4 Runner
Shingle
Shingle
Maximum between leveling
material locations.
48"
12"
2x4 Treated Lumber
2" Block
Level
12"
8
CONCRETE FOUNDATION
Your kit contains all materials to construct a wooden oor. If you choose to install your kit
on a concrete slab refer to the diagram below.
• A treated 2 x 4" (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete. Hint:Usetreatedlumberinyourkitor
purchasefulllengthtreatedlumber.
• Use a high quality exterior grade caulk beneath all sill plates.
• Fasten 2 x 4" (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors (fastenersnotincluded).
• Check local code for concrete foundation requirements.
NOTES
Allow new concrete slabs to cure for at least seven (7) days.
2" x 4" x 11'-1-5/8" (5,1 x 10,2 x 339,4 cm)
2" x 4" x 8' (5,1 x 10,2 x 244 cm)
Caulk
Requires:
x2
x2
x1
MUSTbetreatedlumber.
MUSTbetreatedlumber.
96"(243,8cm)
96"x140-5/8"(243,8x357,2cm) 133-5/8"(339,4cm)
8'x12'(243,8x365,8cm) 140-5/8"(357,2cm)
AActualSize B CBuildingSize
A
B
C
4"
(10,2 cm)
3-1/2"
(8,9 cm)
DOOR
TreatedSillPlate
Caulkbetweensill
plateandconcrete.
9
93"
(236,2 cm)
96"
(243,8 cm)
48"
(121,9 cm)
92-5/8
(235,3 cm)
Offset
Seam
Offset
Seam
140-5/8"
(357,2 cm)
124-5/8"
(316,6 cm)
92-5/8"
(243,8 cm)
108-5/8"
(275,9 cm)
48"
(121,9 cm)
64"
(121,9 cm)
80"
(203,2 cm)
32"
(81,3 cm) 16"
(40,7 cm)
16"
(40,7 cm)
16"
(40,7 cm)
16"
(40,7 cm)
12-5/8"
(32,1 cm)
48"
(121,9 cm)
3" (7,6 cm)
x2
x10
x44
2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm)
2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)
x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
PARTSREQUIRED:
Center
onmarks
Notethismeasurement
FLOORFRAME
Flush
Flush
Look for
Stamp
TREATED
HINT:
Foreasiernailing
standonframe.
2
1
Use two 3" nails at each mark.
Orient parts as shown on at surface. Measure and mark.
BEGIN
You have nished your oor frame.
Proceed to level and square frame.
FINISH
3
DOOR
10
DOOR
FINISH
5
LEVEL AND SQUARE FLOOR FRAME
Before attaching oor decking, it is important to level and square the oor frame.
A level and square oor frame is required to correctly construct your shed.
BEGIN
2
3
4
1
Use level and check the frame is level before applying oor panels.
Check for frame squareness by measuring diagonally across corners. If the measurements are the
same, the frame is square. The diagonal measurement will be approximately 170-1/4" (432,4 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at
ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with one
fastener at ends of each runner making sure the frame remains square (Fig.A).
Once the oor frame is level and square fasten the frame to the 4x4 runners at each point the frame
contacts the 4x4 runners.
See page 7 for the preferred oor leveling method.
First,secure
atendswith
onefastener.
Second,secure
atendswith
onefastener.
170-1/4"
(432,4 cm)
170-1/4"
(432,4 cm)
Fig.A
11
DOOR
DOOR
48"
(121,9 cm)
140-5/8"
(352,2 cm)
6"
(15,2 cm)
Move to the opposite side. Using the long edge of the panel as a lever, move the
panel side-to-side until the top corner is ush to the oor frame (Fig.B).
Secure panel with two 2" nails in the corners.
2
BEGIN
1
3
4Continue attaching the panel using 2" nails 6" apart on edges and 12" apart inside panel.
Use a chalk line or use pre-painted grid lines to nail into joists under panel.
Ensureyouroorframeissquarebyinstallingonepanel
andsquaringframe.
Fig.A
Fig.B
Fig.C
Check the oor frame is square by measuring diagonally across the frame corners. If the measurements are the
same your oor frame is square. The measurement will be approximately 170-1/4" (432,4 cm) (Fig.C).
PARTSREQUIRED:
x1
x62
5/8 x 48 x 96"
(1,6 x 121,9 x 243,8 cm)
Gridlinesup
Seam
Seam
12"
(30,2 cm)
2" (5,1 cm)
Flush
Flush
Flush
(2)Nails
(2)Nails
FLOOR PANELS
3/4"
(1,9 cm)
DOOR
170-1/4"
(432,4 cm
170-1/4"
(432,4 cm
Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with the 48"
edge and corner ush to the oor frame (FigA). Secure panel with two 2" nails in the
corners.
12
6"
(15,2 cm)
12"
(30,5 cm)
48"
(121,9 cm)
44-5/8"
(113,3 cm)
140-5/8"
(357,2 cm)
32"
(81,3 cm)
12-5/8"
(32,1 cm)
PARTSREQUIRED:
FINISH
7You have nished attaching your oor panels.
Continue installing panels with rough side up (painted grid lines).
Position 44-5/8" panel in middle of oor frame.
Use grid lines on panel for 2" nails 6" apart on edges, and 12" apart inside panels.
5
7
6
x1 x1
x124
5/8 x 48 x 96"
(1,6 x 121,9 x 243,8 cm)
5/8 x 44-5/8 x 96"
(1,6 x 113,3 x 243,8 cm)
Gridlinesup
2" (5,1 cm)
FLOOR PANELS
Flush
Flush
Flush
DOOR
13
DOOR
Backwall
Frontwall
Leftwall
(Your window location
will be determined later
during assembly.)
RightWall
Checktheoorframeislevelafterinstallingoorpanels.
Re-levelifneeded.
HINT:
IMPORTANT!
•Theoorshouldbeusedasastableworksurfaceforwallconstruction.
• Organizeyourassemblyprocedureduringthebuildprocess
 toavoidover-handlingofthewalls.
LEFT WALL FRAME
PARTSREQUIRED:
140-5/8”
(352,7cm)
120”
(304,8 cm)
96”
(243,8 cm)
68-5/8”
(174,3 cm)
72”
(182,9 cm)
48”
(121,9 cm)
72”
(182,9 cm)
20-5/8”
(52,4 cm)
24”
(61 cm)
68”
(172,7 cm)
1-1/2”
(3,8 cm)
1-1/2”
(3,8 cm)
1-1/2”
(3,8 cm)
UMx7
TM
YF
TM
YF
HINT:
Foreasiernailing
standonframe.
x2 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm)
TM
x2 2 x 4 x 68-5/8" (5,1 x 10,2 x 174,3 cm)
YF
x7 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm)
UM
x32
14
DOOR
3" (7,6 cm)
BEGIN
1
Use two 3" nails at each mark and four 3" nails at seams
For left wall, orient parts on edge on oor. Measure and mark.
2
TOENAILING
YOUWILLASSEMBLEONELEFTANDONERIGHTWALLSEPARATELY.
YOUMUSTBUILDTHELEFTANDRIGHTSIDEWALLSEXACTLYASSHOWN!
IMPORTANT
MEASUREMENT
15
ForsquarenessmaintainFlushand3/4"
measurementalongpaneledges.
LEFT SIDE WALL PANELS
48 x 72"
(121,9 x 213,4 cm)
PARTSREQUIRED:
x1
x45 2" (5,1 cm)
Fig.B
BEGINHERE
Fig.A
3/4"
(1,9 cm) 3/4"
(1,9 cm)
2Nails
2Nails
Flush
DOOR
48"
(121,9 cm)
3/4"
(1,9 cm) 1”
(2,5 cm)
3/4"
(1,9 cm)
12"
(30,5 cm) 6"
(15,2 cm)
20-5/8"
(52,4 cm)
Place 48x72" panel onto wall frame ush to top of frame with primed side up as shown.
Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with
two 2" nails in the corners (Fig.A).
Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.
Ensureyourwallframeissquarebyinstallingonepanelandsquaringframe.
YOUWILLASSEMBLEONELEFTANDONERIGHTWALLSEPARATELY.
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have
a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig.B).
4
5
3
3/4"GAUGE
BLOCK
3/4"GAUGE
BLOCK
Primed
sideup
16
3/4"
(1,9 cm)
48"
(121,9 cm)
12"
(30,5 cm)
6"
(15,2 cm)
Flush
44-5/8"
(113,3 cm)
12"
(30,5 cm)
6"
(15,2 cm)
Flush
Forsquarenessmaintainushand
3/4"measurementalongpaneledges.
Forsquarenessmaintainush
alongpaneledges.
Place center 48"x72" panel on frame
as shown with primed side facing up.
Nail using 2" nails 6" apart on edges
and 12" apart inside panel.
6
Place end 44-5/8"x72"panel on frame
as shown with primed side facing up.
Nail using 2" nails 6" apart on edges
and 12" apart inside panel.
7
You have nished building your LEFT WALL.
FINISH
9
Primed
sideup
Primed
sideup
48 x 72"
(121,9 x 213,4 cm)
44-5/8 x 72"
(121,9 x 213,4 cm)
x1 x1
x90
LEFT SIDE WALL PANELS
PARTSREQUIRED: 2" (5,1 cm)
8Carefully ip the LEFT wall over.
DOORDOOR
3/4"GAUGE
BLOCK
3/4"GAUGE
BLOCK
17
DOOR
RIGHT WALL FRAME
PARTSREQUIRED:
UMx7
TM YF
TM
YF
HINT:
Foreasiernailing
standonframe.
x2 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm)
TM
x2 2 x 4 x 68-5/8" (5,1 x 10,2 x 174,3 cm)
YF
x7 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm)
UM
x32 3" (7,6 cm)
BEGIN
1
Use two 3" nails at each mark and four 3" nails at seams
For right wall, orient parts on edge on oor. Measure and mark.
2
TOENAILING
IMPORTANT
MEASUREMENT
18
RIGHT SIDE WALL PANELS
48 x 72"
(121,9 x 213,4 cm)
PARTSREQUIRED:
x1
x45 2" (5,1 cm)
Fig.B
Fig.A
Flush
3/4"
(1,9 cm) 3/4"
(1,9 cm)
2Nails
2Nails
DOOR
BEGINHERE
48"
(121,9 cm)
3/4"
(1,9 cm)
3/4"
(1,9 cm)
20-5/8"
(52,4 cm)
12"
(30,5 cm)
1”
(2,5 cm)
6"
(15,2 cm)
Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.
Ensureyourwallframeissquarebyinstallingonepanelandsquaringframe.
Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have
a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig.B).
4
5
3
3/4"GAUGE
BLOCK
3/4"GAUGE
BLOCK
Primed
sideup
Forsquarenessmaintainushand
3/4"measurementalongpaneledges.
Place 48x72" panel onto wall frame ush to top of frame with primed side up as shown.
Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with
two 2" nails in the corners (Fig.A).
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88

YardLine OAKRIDGE 8 x 12 Assembly Manual

Type
Assembly Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI