Riello RS 130/M TC FS1/FS2 3/230-400/50 230/50-60 Installer Manual

Category
Fireplaces
Type
Installer Manual
Installation, use and maintenance instructions
20145931 (2) - 09/2020
Forced draught gas burners
Progressive two-stage or modulating operation
CODE MODEL TYPE
20147189 RS 70/M 828 T1
20147191 RS 100/M 829 T1
20147219 RS 130/M 830 T1
GB
Translation of the original instructions
1 20145931
GB
Contents
1 Declarations................................................................................................................................................................................ 3
2 Information and general warnings............................................................................................................................................ 4
2.1 Information about the instruction manual .................................................................................................................... 4
2.1.1 Introduction.................................................................................................................................................................. 4
2.1.2 General dangers.......................................................................................................................................................... 4
2.1.3 Other symbols ............................................................................................................................................................. 4
2.1.4 Delivery of the system and the instruction manual...................................................................................................... 5
2.2 Guarantee and responsibility....................................................................................................................................... 5
3 Safety and prevention................................................................................................................................................................ 6
3.1 Introduction.................................................................................................................................................................. 6
3.2 Personnel training ....................................................................................................................................................... 6
4 Technical description of the burner ......................................................................................................................................... 7
4.1 Burner designation ...................................................................................................................................................... 7
4.2 Models available.......................................................................................................................................................... 7
4.3 Burner categories - Countries of destination ............................................................................................................... 8
4.4 Technical data ............................................................................................................................................................. 8
4.5 Electrical data.............................................................................................................................................................. 8
4.6 Maximum dimensions.................................................................................................................................................. 9
4.7 Burner equipment........................................................................................................................................................ 9
4.8 Firing rates ................................................................................................................................................................ 10
4.9 Test boiler.................................................................................................................................................................. 11
4.9.1 Commercial boilers.................................................................................................................................................... 11
4.10 Burner description ..................................................................................................................................................... 12
4.11 Electrical panel description........................................................................................................................................ 13
4.12 Control box RFGO-A22............................................................................................................................................. 14
4.13 Servomotor (SQN31...).............................................................................................................................................. 15
5 Installation ................................................................................................................................................................................ 16
5.1 Notes on safety for the installation ............................................................................................................................ 16
5.2 Handling .................................................................................................................................................................... 16
5.3 Preliminary checks .................................................................................................................................................... 16
5.4 Operating position ..................................................................................................................................................... 17
5.5 Preparing the boiler ................................................................................................................................................... 17
5.5.1 Boring the boiler plate ............................................................................................................................................... 17
5.5.2 Blast tube length........................................................................................................................................................ 17
5.5.3 Securing the burner to the boiler ............................................................................................................................... 17
5.6 Access to head internal part...................................................................................................................................... 18
5.6.1 Combustion head pre-calibration .............................................................................................................................. 18
5.7 Positioning the probe - electrode............................................................................................................................... 18
5.8 Combustion head adjustment.................................................................................................................................... 19
5.9 Gas supply ................................................................................................................................................................ 20
5.9.1 Gas feeding line ........................................................................................................................................................ 20
5.9.2 Gas train.................................................................................................................................................................... 21
5.9.3 Gas train installation.................................................................................................................................................. 21
5.9.4 Gas pressure............................................................................................................................................................. 21
5.10 Electrical connections................................................................................................................................................ 23
5.10.1 Supply cables and external connections passage .................................................................................................... 23
5.11 Calibration of the thermal relay ................................................................................................................................. 24
5.12 Motor rotation ............................................................................................................................................................ 24
6 Start-up, calibration and operation of the burner ................................................................................................................. 25
6.1 Notes on safety for the first start-up .......................................................................................................................... 25
6.2 Adjustments prior to ignition ...................................................................................................................................... 25
6.3 Servomotor adjustment ............................................................................................................................................. 25
6.4 Burner start-up .......................................................................................................................................................... 26
6.5 Burner ignition ........................................................................................................................................................... 26
6.5.1 Burner adjustment..................................................................................................................................................... 26
6.5.2 Ignition output............................................................................................................................................................ 26
20145931 2
GB
Contents
6.5.3 Maximum output ........................................................................................................................................................26
6.5.4 Minimum output .........................................................................................................................................................27
6.5.5 Intermediate outputs ..................................................................................................................................................27
6.6 Pressure switch adjustment .......................................................................................................................................28
6.6.1 Air pressure switch.....................................................................................................................................................28
6.6.2 Maximum gas pressure switch...................................................................................................................................28
6.6.3 Minimum gas pressure switch....................................................................................................................................28
6.6.4 Flame presence check...............................................................................................................................................29
6.6.5 Check Mode...............................................................................................................................................................29
6.7 Burner operation ........................................................................................................................................................30
6.7.1 Burner start-up ...........................................................................................................................................................30
6.7.2 Steady state operation ...............................................................................................................................................30
6.7.3 Ignition failure.............................................................................................................................................................30
6.7.4 Final checks (with burner operating)..........................................................................................................................30
7 Maintenance ..............................................................................................................................................................................31
7.1 Notes on safety for the maintenance .........................................................................................................................31
7.2 Maintenance programme ...........................................................................................................................................31
7.2.1 Maintenance frequency..............................................................................................................................................31
7.2.2 Safety test - with no gas supply .................................................................................................................................31
7.2.3 Checking and cleaning...............................................................................................................................................31
7.2.4 Safety components ....................................................................................................................................................32
7.3 Opening the burner ....................................................................................................................................................33
7.4 Closing the burner......................................................................................................................................................33
8 LED indicator and special function .........................................................................................................................................34
8.1 Description of LED lamps ..........................................................................................................................................34
8.2 Check mode function .................................................................................................................................................34
8.3 Flame control lock-out or emergency stop condition .................................................................................................34
8.4 LED lamps: burner operating status ..........................................................................................................................35
9 Problems - Causes - Remedies signalled by LED indicators ...............................................................................................36
A Appendix - Accessories ...........................................................................................................................................................41
B Appendix - Electrical panel layout...........................................................................................................................................43
3 20145931
GB
Declarations
1 Declarations
Declaration of Conformity in accordance with ISO / IEC 17050-1
Manufacturer: RIELLO S.p.A.
Address: Via Pilade Riello, 7
37045 Legnago (VR) Italy
Product: Forced draught gas burners
Model: RS 70/M
RS 100/M
RS 130/M
These products are in compliance with the following Technical Standards:
EN 676
EN 12100
and according to the European Directives:
GAR 2016/426/EU Gas Devices Regulation
MD 2006/42/CE Machine Directive
LVD 2014/35/EU Low Voltage Directive
EMC 2014/30/EU Electromagnetic Compatibility
Such products are marked as follows:
The quality is guaranteed by a quality and management system certified in accordance with ISO 9001:2015.
Legnago, 21.04.2018 General Manager
RIELLO S.p.A. - Burners Department
Research and Development Director
RIELLO S.p.A. - Burners Department
Eng. U. Ferretti Eng. F. Comencini
CE-0085AQ0708
20145931 4
GB
Information and general warnings
2.1 Information about the instruction manual
2.1.1 Introduction
The instruction manual supplied with the burner:
is an integral and essential part of the product and must not
be separated from it; it must therefore be kept carefully for
any necessary consultation and must accompany the burner
even if it is transferred to another owner or user, or to
another system. If the manual is lost or damaged, another
copy must be requested from the Technical Assistance
Centre of the area;
is designed for use by qualified personnel;
offers important indications and instructions relating to the
installation safety, start-up, use and maintenance of the
burner.
Symbols used in the manual
In some parts of the manual you will see triangular DANGER
signs. Pay great attention to these, as they indicate a situation of
potential danger.
2.1.2 General dangers
The dangers can be of 3 levels, as indicated below.
2.1.3 Other symbols
Abbreviations used
Ch. Chapter
Fig. Figure
Page Page
Sec. Section
Tab. Table
2 Information and general warnings
DANGER
Maximum danger level!
This symbol indicates operations which, if not
carried out correctly, cause serious injury, death
or long-term health risks.
ATTENTION
This symbol indicates operations which, if not
carried out correctly, may cause serious injury,
death or long-term health risks.
CAUTION
This symbol indicates operations which, if not
carried out correctly, may cause damage to the
machine and/or injury to people.
DANGER
DANGER: LIVE COMPONENTS
This symbol indicates operations which, if not
carried out correctly, lead to electric shocks with
lethal consequences.
DANGER: FLAMMABLE MATERIAL
This symbol indicates the presence of flammable
materials.
DANGER: BURNING
This symbol indicates the risks of burns due to
high temperatures.
DANGER: CRUSHING OF LIMBS
This symbol indicates the presence of moving
parts: danger of crushing of limbs.
WARNING: MOVING PARTS
This symbol indicates that you must keep limbs
away from moving mechanical parts; danger of
crushing.
DANGER: EXPLOSION
This symbol signals places where an explosive
atmosphere may be present. An explosive
atmosphere is defined as a mixture - under
atmospheric conditions - of air and flammable
substances in the form of gases, vapours, mist or
dust in which, after ignition has occurred,
combustion spreads to the entire unburned
mixture.
PERSONAL PROTECTION EQUIPMENT
These symbols indicate the equipment that must
be worn and kept by the operator for protection
against threats against safety and/or health while
at work.
OBLIGATION TO ASSEMBLE THE COVER
AND ALL THE SAFETY AND PROTECTION
DEVICES
This symbol signals the obligation to reassemble
the cover and all the safety and protection devices
of the burner after any maintenance, cleaning or
checking operations.
ENVIRONMENTAL PROTECTION
This symbol gives indications for the use of the
machine with respect for the environment.
IMPORTANT INFORMATION
This symbol indicates important information that
you must bear in mind.
This symbol indicates a list.
5 20145931
GB
Information and general warnings
2.1.4 Delivery of the system and the instruction
manual
When the system is delivered, it is important that:
the instruction manual is delivered to the user by the system
manufacturer, with the recommendation to keep it in the
room where the heat generator is to be installed.
The instruction manual shows:
the serial number of the burner;
the address and telephone number of the nearest
Assistance Centre;
The system supplier must carefully inform the user about:
the use of the system;
any further tests that may be required before activating the
system;
maintenance, and the need to have the system checked at
least once a year by a representative of the manufacturer
or another specialised technician.
To ensure a periodic check, the manufacturer
recommends the drawing up of a Maintenance Contract.
2.2 Guarantee and responsibility
The manufacturer guarantees its new products from the date of
installation, in accordance with the regulations in force and/or the
sales contract. At the moment of the first start-up, check that the
burner is integral and complete.
In particular, the rights to the guarantee and the responsibility will
no longer be valid, in the event of damage to things or injury to
people, if such damage/injury was due to any of the following
causes:
incorrect installation, start-up, use and maintenance of the
burner;
improper, incorrect or unreasonable use of the burner;
intervention of unqualified personnel;
carrying out of unauthorised modifications on the equipment;
use of the burner with safety devices that are faulty,
incorrectly applied and/or not working;
installation of untested supplementary components on the
burner;
powering of the burner with unsuitable fuels;
faults in the fuel supply system;
continuation of use of the burner when a fault has occurred;
repairs and/or overhauls incorrectly carried out;
modification of the combustion chamber with inserts that
prevent the regular development of the structurally
established flame;
insufficient and inappropriate surveillance and care of those
burner components most likely to be subject to wear and
tear;
use of non-original components, including spare parts, kits,
accessories and optional;
force majeure.
The manufacturer furthermore declines any and every
responsibility for the failure to observe the contents of this
manual.
.........................................................................................
.........................................................................................
.........................................................................................
.........................................................................................
ATTENTION
Failure to observe the information given in this
manual, operating negligence, incorrect
installation and carrying out of non authorised
modifications will result in the annulment by the
manufacturer of the guarantee that it supplies with
the burner.
20145931 6
GB
Safety and prevention
3.1 Introduction
The burners have been designed and built in compliance with
current regulations and directives, applying the known technical
safety rules and envisaging all the potential danger situations.
It is necessary, however, to bear in mind that the imprudent and
clumsy use of the equipment may lead to situations of death risk
for the user or third parties, as well as the damaging of the burner
or other items. Inattention, thoughtlessness and excessive
confidence often cause accidents; the same applies to tiredness
and sleepiness.
It is a good idea to remember the following:
The burner must only be used as expressly described. Any
other use should be considered improper and therefore
dangerous.
Specifically:
it can be applied to boilers operating with water, steam,
diathermic oil, and to other uses expressly named by the
manufacturer;
the type and pressure of the fuel, the voltage and frequency of the
electrical power supply, the minimum and maximum deliveries for
which the burner has been regulated, the pressurisation of the
combustion chamber, the dimensions of the combustion
chamber and the ambient temperature must all be within the
values indicated in the instruction manual.
Modification of the burner to alter its performance and
destinations is not allowed.
The burner must be used in exemplary technical safety
conditions. Any disturbances that could compromise safety
must be quickly eliminated.
Opening or tampering with the burner components is not
allowed, apart from the parts requiring maintenance.
Only those parts envisaged by the manufacturer can be
replaced.
3.2 Personnel training
The user is the person, body or company that has acquired the
machine and intends to use it for the specific purpose. He is
responsible for the machine and for the training of the people
working around it.
The user:
undertakes to entrust the machine exclusively to suitably
trained and qualified personnel;
undertakes to inform his personnel in a suitable way about
the application and observance of the safety instructions.
With that aim, the user undertakes to ensure that everyone
knows the use and safety instructions for his own duties;
Personnel must observe all the danger and caution
indications shown on the machine.
Personnel must not carry out, on their own initiative,
operations or interventions that are not within their province.
Personnel must inform their superiors of every problem or
dangerous situation that may arise.
The assembly of parts of other makes, or any modifications,
can alter the characteristics of the machine and hence
compromise operating safety. The manufacturer therefore
declines any and every responsibility for any damage that
may be caused by the use of non-original parts.
In addition:
3 Safety and prevention
ATTENTION
The manufacturer guarantees safety and proper
operation only if all burner components are intact
and correctly positioned.
must take all the measures necessary to
prevent unauthorised people gaining access
to the machine;
the user must inform the manufacturer if
faults or malfunctioning of the accident
prevention systems are noticed, along with
any presumed danger situation;
personnel must always use the personal
protective equipment envisaged by legislation
and follow the indications given in this
manual.
7 20145931
GB
Technical description of the burner
4.1 Burner designation
4.2 Models available
4 Technical description of the burner
Designation Voltage Start-up Code
RS 70/M TC 3/230-400/50 Direct 20147189
RS 100/M TC 3/230-400/50 Direct 20147191
RS 130/M TC 3/230-400/50 Direct 20147219
Series: R
Size
Fuel: Natural gas
Light oil
Light oil / Methane
Adjustment:
Flame control system:
FS1
FS2
Standard (1 stop every 24 h)
Continuous operation (only with the use of a flame detection
Electrical supply of the system:
3/400/50
3/230/50
Voltage of auxiliaries:
230/50/60
110/50/60
R S 70 TC 3/400/50 230/50
BASIC DESIGNATION
EXTENDED DESIGNATION
3N / 400V / 50Hz
3 / 230V / 50Hz
230V / 50-60Hz
110V / 50-60Hz
Heavy oil
E Electronic cam
EV Electronic cam and variable speed (with Inverter)
P Proportional air/gas valve
BP Two stage (light oil) / Proportional valve (gas)
M Mechanical cam
S
L
LS
N
Head: TC Standard head
TL Extended head
Emission: C1 or... Class 1 EN676
C02 or MZ Class 2 EN676
C03 or BLU Class 3 EN676
M
electrode (ionisation)
20145931 8
GB
Technical description of the burner
4.3 Burner categories - Countries of destination
4.4 Technical data
Tab. A
(1) Reference conditions: Ambient temperature 20°C - Gas temperature 15°C - Barometric pressure 1013 mbar - Altitude 0 m a.s.l.
(2) Pressure at test point 7) (Fig. 4) with zero pressure in combustion chamber and at maximum burner output.
(3) Sound pressure measured in manufacturer's combustion laboratory, with burner operating on test boiler and at maximum output. The sound power
is measured using the "Free Field" method, required by EN 15036 standard, and according to an “Accuracy: Category 3” measurement, as
described in EN ISO 3746.
4.5 Electrical data
Tab. B
Country of destination Gas category
SE - FI - AT - GR - DK - ES - GB - IT - IE - PT - IS - CH - NO I2H
DE I2ELL
NL I2L - I2E - I2 (43.46 ÷ 45.3 MJ/m3 (0°C))
FR I2Er
BE I2E(R)B
LU - PL I2E
Model RS 70/M RS 100/M RS 130/M
Type 828 T1 829 T1 830 T1
Output (1) 2nd stage kW 470 - 930 700 - 1340 920 - 1600
Mcal/h 404 - 800 602 - 1152 791 - 1376
1st stage min. kW 150 150 254
Mcal/h 129 129 218
Fuel Natural gas: G20 - G25. LPG: G31
G20 G25 G20 G25 G20 G25
- pressure at maximum delivery (2) mbar 15.7 22.9 15.5 21.7 11.7 17.2
Operation Continuous (min. 1 stop in 72 hours).
These burners are also suitable for intermittent operation, only with
the use of the UV flame sensor kit.
Progressive two-stage or modulating with kit (see ACCESSORIES).
Standard applications Boilers: water, steam, diathermic oil
Ambient temperature °C 0 - 40
Combustion air temperature °C max 60
Noise levels (3) Sound pressure
Sound power dB(A) 75
86
77
88
78.5
89.5
Model RS 70/M RS 100/M RS 130/M
Main electrical supply 3 ~ 230 - 400V ~ +/-10% 50Hz
Auxiliary circuit electrical supply 1N ~ 230 V 50 Hz
Fan motor IE3 rpm
V
W
A
2870
230/400
1100
4.3 - 2.5
2890
230/400
1500
5.9 - 3.4
2890
230/400
2200
8 - 4.6
Ignition transformer V1 - V2
I1 - I2
230 V - 1 x 8 kV
1 A - 20 mA
Absorbed electric power W max 1700 2100 2800
Protection level IP 44
9 20145931
GB
Technical description of the burner
4.6 Maximum dimensions
The dimensions of the burner are given in Fig. 1.
Note that to inspect the combustion head the burner must be
moved backward and turned upward. The maximum dimension
of the burner, without casing, when open is given by
measurement I.
Tab. C
(1) Blast tube: short-long
4.7 Burner equipment
Flange for gas train . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Seal for flange . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Flange fixing screws M 8 x 25 . . . . . . . . . . . . . . . . . . . . . . No. 4
Thermal flange gasket . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Screws to fix the burner flange to the boiler:
M 12 x 35 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 4
Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Spare parts list . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Fig. 1
D731
mm ABCDE F
(1) GH I
(1) LMNO
RS 70/M 511 296 215 555 840 250 - 385 179 430 1161 - 1296 214 134 221 2”
RS 100/M 527 312 215 555 840 250 - 385 179 430 1161 - 1296 214 134 221 2”
RS 130/M 553 338 215 555 840 280 - 415 189 430 1161 - 1296 214 134 221 2”
20145931 10
GB
Technical description of the burner
4.8 Firing rates
The burners RS 70-100-130/M can work in two ways: one-stage
or two-stage.
The MAXIMUM OUTPUT must be selected within area A (Fig. 2).
To use also area B (RS 130), the combustion head has to be pre-
calibrated.
See "Combustion head pre-calibration” on page 18
The MINIMUM OUTPUT must not be lower than the minimum
limit of the diagram:
RS 70/M = 150 kW
RS 100/M = 150 kW
RS 130/M = 254 KW
ATTENTION
The firing rate value (Fig. 2) has been obtained
considering an ambient temperature of 20 °C, an
atmospheric pressure of 1013 mbar (approx. 0 m
a.s.l.), and with the combustion head adjusted as
shown on page 19.
Pressure in the chamber
pressure - mbar
Thermal power - kW
Thermal power - kW
Thermal power - kW
RS 70/M
RS 100/M
RS 130/M
20063160
20094745
20076805
Fig. 2
Pressure in the chamber
pressure - mbar
Pressure in the chamber
pressure - mbar
11 20145931
GB
Technical description of the burner
4.9 Test boiler
The burner/boiler combination does not pose any problems if the
boiler is EC approved and its combustion chamber dimensions
are similar to those indicated in the diagram (Fig. 3).
If the burner must be combined with a boiler that has not been EC
approved and/or its combustion chamber dimensions are clearly
smaller than those indicated in the diagram, consult the
manufacturer.
The firing rates were obtained in special test boilers, according to
EN 676 standard.
In Fig. 3 you can see the diameter and length of the test
combustion chamber.
Example:
Output 650 Mcal/h: diameter 60 cm - length 2 m.
4.9.1 Commercial boilers
The burner/boiler combination does not pose any problems if the
boiler is EC approved and its combustion chamber dimensions
are similar to those indicated in the diagram (Fig. 3).
If the burner must be combined with a commercial boiler that has
not been EC approved (CE mark) and/or its combustion chamber
dimensions are clearly smaller than those indicated in diagram
(Fig. 3), consult the manufacturers.
Fig. 3
Combustion chamber
m
D715
20145931 12
GB
Technical description of the burner
4.10 Burner description
1 Combustion head
2 Ignition electrode
3 Screw for combustion head adjustment
4 Maximum gas pressure switch
5 Servomotor controlling the gas butterfly valve and the air
damper, by means of a variable profile cam mechanism.
When the burner is not operating the air damper is fully
closed in order to minimise heat dispersion from the boiler
due to the flue draught which draws air from the fan suction
inlet.
6 Electrical control box with lockout pilot light and reset button
7 Flame inspection window
8 Slide bars for opening the burner and inspecting the
combustion head
9 Gas pressure test point and head fixing screw
10 Air pressure test point
11 Flame sensor probe
12 Air damper
13 Air inlet to fan
14 Screw securing fan to sleeve
15 Gas input pipe
16 Gas butterfly valve
17 Boiler fixing flange
18 Flame stability disc
19 Fan motor
There is one type of burner lockout may occur:
Control box lockout:
if the control box button (red LED) 6)(Fig. 4) lights up, it indicates
that the burner is locked out.
To reset, hold the pushbutton down for between 1 and 3 seconds.
Fig. 4
20156624
13 20145931
GB
Technical description of the burner
4.11 Electrical panel description
1 Plug-socket on ionisation probe cable
2 Sockets for electrical connection
3 Motor contactor and thermal relay with reset button
4 Power switch for:
automatic-manual-off operation
A button for:
output increase - decrease
5 Terminal board for electric connection
6 Cable grommets for electrical wiring (to be carried out by the
installer)
7 Air pressure switch (differential type)
8 Ignition transformer
9 Control box base
10 Filter to protect against radio disturbance
11 Bracket for contactor, thermal relay and RWF kit for
modulating operation
12 Plug to connect the RWF kit of modulating operation
Fig. 5
20158354
20145931 14
GB
Technical description of the burner
4.12 Control box RFGO-A22
Important notes
All interventions (assembly and installation operations,
assistance, etc.) must be carried out by qualified personnel.
Before modifying the wiring in the control box connection
area, fully disconnect the system from the power supply
(omnipolar separation).
Protection against electrocution from the control box and all
connected electric components is obtained with the correct
assembly.
Before any intervention (assembly and installation
operations, assistance, etc.), ensure the wiring is in order
and that the parameters are correctly set, then make the
safety checks.
Falls and collisions can negatively affect the safety
functions. In this case, the control box must not be operated,
even if it displays no evident damage.
For safety and reliability, comply with the following
instructions:
avoid conditions that can favour the development of
condensate and humidity. Otherwise, before switching on
again, make sure that the entire control box is perfectly dry!
Static charges must be avoided since they can damage the
control box’s electronic components when touched.
Use
The control box is a control and supervision system of medium
and large capacity forced draught burners.
If used with the flame detection electrode the system can
operate continuously whereas, with the use of UV sensors it
operates intermittently with stop and restart request at least
once every 24h.
Installation notes
Make sure that the electrical wiring inside the boiler complies
with national and local safety regulations.
Do not confuse the powered conductors with the neutral
ones.
Ensure that spliced wires cannot get into contact with
neighbouring terminals. Use adequate ferrules.
Arrange the H.V. ignition cables separately, as far as
possible from the control box and the other cables.
When wiring the unit, make sure that AC 230 V mains voltage
cables are run strictly separate from extra low-voltage cables
to avoid risks of electrical shock hazard.
Technical data
Tab. D
Electrical wiring of the flame detector
It is important for signal transmission to be almost totally free
of any disturbances or loss:
Always separate the detector cables from the other cables:
The capacitive reactance of the line reduces the size of the
flame signal.
Use a separate cable.
Respect the allowed cable lengths.
The ionisation probe is not protected against the risk of
electrocution. When connected to the electricity supply, the
ionisation probe must be protected against any accidental
contact.
Position the ignition electrode and the ionisation probe so
that the ignition spark cannot form an arc on the probe (risk
of electric overcharge).
ATTENTION
To avoid accidents, material or environmental
damage, observe the following instructions!
The control box is a safety device! Avoid opening
or modifying it, or forcing its operation. The
Manufacturer cannot assume any responsibility
for damage resulting from unauthorised work!
Mains voltage AC 230 V -15% / +10%
Mains frequency 50 / 60 Hz
Primary fuse (external) Refer to the electric
system
Weight approx. 1.1 kg
Power absorption approx. AC 7 VA
Protection level IP40
Safety class II
Environmental conditions
Operation
Climatic conditions
Mechanical conditions
Temperature range
Humidity
DIN EN 60721-3-1
Class 1K2
Class 1M2
-40...+60 °C
< 90% RH (non-condensing)
Fig. 6
20152163
15 20145931
GB
Technical description of the burner
4.13 Servomotor (SQN31...)
Important notes
All interventions (assembly and installation operations,
assistance, etc.) must be carried out by qualified personnel.
Before modifying the wiring in the connection area of the
servomotor, fully disconnect the burner control device from
the power supply (omnipolar separation).
To avoid the risk of electrocution, protect the connection
terminals in a suitable manner and correctly fix the cover.
Check the wiring is in order.
Falls and collisions can negatively affect the safety
functions. In this case, the servomotor must not be operated,
even if it displays no evident damage.
Assembly notes
Check the relevant national safety standards are respected.
When assembling the servomotor and connecting the
damper, the gears can be disengaged by means of a lever,
allowing the drive shaft to be easily adjusted in both
directions of rotation.
Technical data
Tab. E
ATTENTION
To avoid accidents, material or environmental
damage, observe the following instructions!
Avoid opening, modifying or forcing the
actuators.
Fig. 7
20160309
Operating voltage AC 220...240 V - 15% / +10%
AC 100...110 V - 15% / +10%
Mains frequency 50...60 Hz 6%
Switching capacity of
auxiliary devices and
limit switches
10 (3) A, AC 24...250 V
Angle
positioning
up to 160° (full scale)
Assembly position option
Protection level IP 54, DIN 40050
Safety class I
Weight approx. 0.8 kg
Actuator motor synchronous motor
Power absorption 6.5 VA
Environmental conditions:
Operation
Climatic conditions
Mechanical conditions
Temperature range
Humidity
DIN EN 60 721-3-1
Class 1K2
Class 1M2
-20...+60 °C
< 95% RH
20145931 16
GB
Installation
5.1 Notes on safety for the installation
After carefully cleaning all around the area where the burner is to
be installed, and arranging for the environment to be illuminated
correctly, proceed with the installation operations.
5.2 Handling
The burner packaging includes a wooden platform, it is therefore
possible to handle the burner (still packaged) with a pallet truck
or fork lift truck.
5.3 Preliminary checks
Checking the consignment
Checking the characteristics of the burner
Check the identification label of the burner, showing:
the model (A)(Fig. 8) and type of burner (B);
the year of manufacture, in cryptographic form (C);
the serial number (D);
the data for electrical supply and the protection level (E);
the absorbed electrical power (F);
the types of gas used and the relative supply pressures (G);
the data of the burner's minimum and maximum output
possibilities (H)(see Firing rate)
Warning. The burner output must be within the firing rate of
the boiler;
the category of the appliance/countries of destination (I).
5Installation
DANGER
All the installation, maintenance and disassembly
operations must be carried out with the electricity
supply disconnected.
ATTENTION
The installation of the burner must be carried out
by qualified personnel, as indicated in this manual
and in compliance with the standards and
regulations of the laws in force.
DANGER
The combustion air inside the boiler must be free
from hazardous mixes (e.g.: chloride, fluoride,
halogen); if present, it is highly recommended to
carry out cleaning and maintenance more
frequently.
ATTENTION
Burner handling operations can be highly
dangerous if not carried out with the greatest
attention: distance unauthorised personnel, check
integrity and suitability of the means available.
Check also that the area in which you are working
is empty and that there is an adequate escape
area (i.e. a free, safe area to which you can
quickly move if the burner should fall).
During handling, keep the load at no more than
20-25 cm from the ground.
After positioning the burner near the installation
point, correctly dispose of all residual packaging,
separating the various types of material.
CAUTION
Before proceeding with the installation operations,
carefully clean all around the area where the
burner will be installed.
CAUTION
After removing all the packaging, check the
integrity of the contents. In the event of doubt, do
not use the burner; contact the supplier.
The packaging elements (wooden cage or
cardboard box, nails, clips, plastic bags, etc.)
must not be abandoned as they are potential
sources of danger and pollution; they should be
collected and disposed of in the appropriate
places.
ATTENTION
A burner label that has been tampered with,
removed or is missing, along with anything else
that prevents the definite identification of the
burner makes any installation or maintenance
work difficult
R.B.L.
GAS- KAASU
GAZ- AEPI O
X
RIELLO S. p .A.
I-37045 Legnago (VR)
A
DE
BC
F
I
G H
G H
Fig. 8
D10411
17 20145931
GB
Installation
5.4 Operating position
5.5 Preparing the boiler
5.5.1 Boring the boiler plate
Pierce the closing plate of the combustion chamber, as in Fig. 10.
The position of the threaded holes can be marked using the
thermal insulation screen supplied with the burner.
Tab. F
5.5.2 Blast tube length
The length of the blast tube must be selected according to the
indications provided by the manufacturer of the boiler, and in any
case it must be greater than the thickness of the boiler door
complete with its fettling. The range of lengths available, L (mm),
is as follows:
Tab. G
For boilers with front flue passes 15) or flame inversion chamber,
a protection in refractory material 13) must be inserted between
the boiler fettling 14) and the blast tube 12).
This protection must not compromise the extraction of the blast
tube.
For boilers with a water-cooled front piece, a refractory lining 13)-
14)(Fig. 11) is not necessary, unless expressly requested by the
boiler manufacturer.
5.5.3 Securing the burner to the boiler
Before securing the burner to the boiler, check (through the
opening of the blast tube) that the probe and electrode are
correctly positioned, as in Fig. 14.
Separate the combustion head from the rest of the burner
(Fig. 11):
loosen the 4 screws 3) and remove the cover 1);
disengage the articulated coupling 7) from the graduated
sector 8);
remove screws 2) from the two slide bars 5);
remove the two screws 4) and pull the burner back on slide
bars 5) by about 100 mm.
Disconnect the probe and electrode cables, then completely
unthread the burner from the slide bars.
ATTENTION
The burner is set up to operate only in
positions 1, 2, 3 and 4 (Fig. 9).
Installation 1 is preferable, as it is the only
one that allows the maintenance operations
as described in this manual.
Installations 2, 3 and 4 permit operation but
make maintenance and inspection of the
combustion head more difficult.
DANGER
Any other position could compromise the
correct operation of the appliance.
The installation 5 is prohibited for safety
reasons.
Fig. 9
2 3 4 51
D7739
mm A B C
RS 70/M 185 275 - 325 M 12
RS 100/M 185 275 - 325 M 12
RS 130/M 195 275 - 325 M 12
mm RS 70/M RS 100/M RS 130/M
Standard 250 250 280
Elongated 385 385 415
Fig. 10
D455
Provide an adequate lifting system.
Fig. 11
D884
20145931 18
GB
Installation
5.6 Access to head internal part
In order to reach inside the combustion head (Fig. 12) proceed as
follows:
remove the screw 1) and the internal part 2).
5.6.1 Combustion head pre-calibration
For the RS 130/M model, check, at this point, whether the
maximum output of the burner in the 2nd stage is within area A
or in area B of the firing rate.
See "Firing rates” on page 10.
If it is in area A, no intervention is required.
However, if it is in area B:
loosen the screws 1)(Fig. 13) and disassemble the blast
tube 2).
Move the rod 3) (Fig. 13) from position A to position B,
thereby drawing back the shutter 4).
Reassemble the blast tube 2)(Fig. 13) and the screws 1).
Once this operation (if necessary) has been carried out, fix the
flange 11)(Fig. 11 on page 17) to the boiler plate, interposing the
insulating gasket 9)(Fig. 11 on page 17) supplied.
Use the 4 screws, also supplied, after protecting their thread with
an anti-locking product.
5.7 Positioning the probe - electrode
If the probe or electrode is not correctly positioned, you must:
remove the screw 1)(Fig. 12);
take out the inner part 2)(Fig. 12) of the head and then
calibrate them.
ATTENTION
The seal between burner and boiler must be
airtight.
Fig. 12
D718
Fig. 13
D738
ATTENTION
Before securing the burner to the boiler, check
(through the opening of the blast tube) that the
probe and electrode are correctly positioned, as in
Fig. 14.
ATTENTION
Do not rotate the probe but leave it as in Fig. 14; if
it is too close to the ignition electrode, it could
damage the control box amplifier.
ATTENTION
Respect the dimensions shown in Fig. 14.
PROBE ELECTRODE
Fig. 14
D613
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56

Riello RS 130/M TC FS1/FS2 3/230-400/50 230/50-60 Installer Manual

Category
Fireplaces
Type
Installer Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI