STC EG45812VG User guide

Type
User guide
Y
e
a
r
s
W
a
r
r
a
n
t
y
P
C
S
H
E
L
L
7
10
Y
e
a
r
s
W
a
r
r
a
n
t
y
S
T
R
U
C
T
U
R
E
Clear ViewTM
Systems Trading Corporation
450 7th Avenue Suite 2809, New York, NY 10123
Customer Service: (877) 407-9100 ext 1 Email: [email protected]
8’ x 12’ Greenhouse
Assembly Instructions
Introduction
Before Starting Assembly:
5. Make sure you have the proper tools:
After choosing a location, proper preparation of the site is essential. The site must be level. If the site is
not level, create a base slightly larger than the outside dimensions of the greenhouse using a perimeter
diagonals from both sides and making sure they are equal. The greenhouse is secured from the inside
with pegs into holes cast with concrete. See step15 for details.
level. Make sure you have checked with your local authorities regarding any required building permits.
water drainage and easy access to power and water necessary for greenhouse gardening.
Choose a sunny, level position away from overhanging trees and power lines and protected from the
wind as much as possible. The location should be away from structures that could cause snow to drift
on or around the greenhouse.
Locate underground pipes or cables before preparing the site or anchoring the greenhouse.
The List of Parts has the corresponding step number referenced to each part. We recommend that
while you go through the list, make staging areas for each step and place the parts necessary for
2. Lay the parts out in separate staging areas:
3. Select a Location:
4. Prepare a Foundation:
1. Make sure you have all the necessary parts:
Compare the contents of the three cartons to the List of Parts. If any parts are missing or damaged or
you have any questions, please contact Customer Service by phone at (877) 407-9100 ext. 1 or by email
at [email protected] before beginning assembly.
CAREFULLY READ ALL INSTRUCTIONS BEFORE YOU BEGIN AND FOLLOW THE STEPS IN
THE ORDER THEY ARE PRESENTED.
NOTE: A cordless drill with Phillips head bit is highly recommended but not essential.
Tape Measure
Work Gloves
Safety Goggles
Phillips Screwdriver
Spirit Level
Small Step Ladder
Wooden Mallet
Liquid Soap or WD40 Lubricant
Scissors
Hex Key (included)
1 of 56
www.stcny.com
Our patented greenhouse has been designed to be easily assembled. All but one step can be completed
by one person. You will need assistance from another person to attach the roof. Although the greenhouse
can be assembled in six to eight hours, we recommend you take your time and make it a weekend project.
These instructions include helpful hints and important information needed to safely assemble and properly
maintain the greenhouse. Please read these instructions completely before you begin.
Thank you for purchasing your Clear ViewTM 8x12 Greenhouse. This model features two roof vents and a
circular air vent to ensure proper ventilation. We have also included an automatic vent opener to help
greenhouse will provide years of enjoyment.
General Order of Assembly
Step 1: Assemble Back
Step 2: Prepare Doors
Step 3: Assemble Front
Step 4: Assemble Sides
Step 5: Prepare Shelves
Step 6: Connect Sides to Back
Step 7: Connect Sides to Front
Step 8: Prepare Roof Vents
Step 9: Connect Gables and Roof Vents
Step 10: Brace Sides
Step 11: Install Circular Vent
Step 12: Install Side and Roof Panels
Step 13: Install Trim Plates
Step 14: Hang Doors
Step 15: Secure to Ground
Step 16: Install Trays and Bin Holder
1
3
4
9
5
8
13
12
11
14
16
6
7
2
2
10
2 of 56
www.stcny.com
Introduction .....................................
Safety Advice .................................
General Order of Assembly ......
List of Parts ......................................
Assemble Back .............................
Prepare Doors ..............................
Assemble Front .............................
Assemble Sides .............................
Prepare Shelves ............................
Connect Sides to Back ...............
Connect Sides to Front .............
Prepare Roof Vents ......................
Connect Gables and Roof Vents
Brace Sides ...................................
Install Circular Vent ..................
Install Side and Roof Panels ...
Install Trim Plates .......................
Hang Doors ..................................
Secure to Ground .........................
Install Trays and Bin Holder .......
Safety Advice
level surface.
Dispose of all plastic bags safely. Keep them out of the
reach of small children.
Keep children and pets away from the assembly area until
the work is completed.
Always wear shoes, gloves and safety goggles when working.
In manufacturing all sharp edges and burs have been removed
but caution should still be taken when handling metal parts.
Do not lean against or push the greenhouse during assembly.
Take special care not to touch overhead power lines with the
Do not attempt to assemble the greenhouse in windy or wet
conditions.
Do not position your greenhouse in an area exposed to
excessive wind.
If using power tools or a step ladder always follow the
manufacturer’s safety instructions.
Hot items such as recently used grills, blow torches etc.,
must not be stored in the greenhouse.
Store the polycarbonate panels in a cool dark place like a
garage until you are ready to use them.
Make sure the greenhouse complies with local building codes.
Table of Contents
1
2
2
3
6
15
19
27
33
34
36
39
40
46
48
49
50
52
55
56
List of Parts
!
The greenhouse is shipped in three cartons. These cartons are heavy. Be careful when lifting them.
Wear proper safety gear including work shoes, gloves and goggles.
Place all the parts for each step in staging areas, checking that you have all parts as you go.
If any parts are missing or damaged, contact STC customer service before beginning assembly:
Customer Service: (877) 407-9100 ext. 1 or email: [email protected]
G14C
G14D
4
4
Step 5
Step 5
G14J 4 Step 4
G06A
G06K 1
1 Step 3
2 Step 8
1 Step 2
DOOR 1G
DOOR 2G
VENT
1 Step 2
G06J 1 Step 3
G07C 2 Step 4
G07D 2 Step 4
Step 3
QTYFactory Assembled
QTY
1 Step 3 G17A
1 Step 3 G17B
1 Step 1 G17C
1 Step 1 G17D
G05D
G05D
1
1
4 Step 1
Step 9
Step 9 G05G
G05H
QTY
G01D
G02A
G02H
G02I
G02J
G02K
G02L
1
1
1
1
2
1
1
1
1
1
4 Step 4
Step 1
Step 3
Steps 1,3
G02B 2 Steps 1,3
Step 1
Step 1
Step 9
G02N 1 Step 9
Step 1
Step 3
G03B
G03D
G03K
G03M
G03L
G03N
1
4
1
Step 4
G03C 1
1
1
4
1
1
1
Step 1
Step 1
Step 1
Step 1
G03W 1 Step 3
G03T 2 Step 4
G03V 4 Step 4
Step 9
Step 9
Step 9
Step 9
Step 9
G04C
G04D
4
4
G04G 2 Step 16
G04B 4 Step 4
Step 4
Step 4
G03R
G03Q
G03S
2 Step 9
G03U
Step 3
Step 3
G01I
G01J
G01M
G01N
1 Step 3 G01O
3 of 56
www.stcny.com
Clear Panel QTY
1 Step 3
1 Step 1
GY1
GY8
1 Step 1 GY9
2 Step 1 GY2
1 Step 3 GY5
1 Step 3 GY6
1 Step 1 GY7
Twin Panel QTY
4 Step 12 Y21
6 Step 12 Y22
2 Step 12 Y23
Clear Panel QTY
4 Step 12
1 Step 3
GY21
GY18
2 Step 1
GY19
8 Step 12
GY12
1 Step 1
GY13
2 Step 1
GY20
1 Step 1
GY16
1 Step 3
GY17
4 of 56
www.stcny.com
Door Handle QTY
S29
S30
S31
S33
S44
2
1 Step 2
Step 2
Step 2
Step 2
Step 2
1
1
1
1
S25 Step 8
Roof Vent Handle QTY
2
4
S40
S40A
Step 2
Step 2
Door Lock QTY
9 petS 14S 1
2
S41A Step 9
Auto Vent Opener QTY
S06
S07
S16
hex key
G15D
S23
4
1
2
24 Steps 1,3,10
Steps 1,3,10
Steps 1,3
8
9 Step 9
Step 910
Step 2
Bracing Parts QTY
circular vent
vent frame
plastic nut 4
4
1 Step 11
1 Step 11
Step 11
Step 11
Circular Vent QTY
#S43 screw
Step 14
Step 14
Step 14
Step 14
Door Hinge Parts QTY
#S51
#S50
4#P30
2
2
2
#S49
G09C 2 Step 13
G09D 2 Step 13
J02L 2 Step 13
J02R 2 Step 13
J03 2 Step 13
J06 1 Step 13
Trim Plate QTY
30
J05 Step 16
Shelf Trays QTY
5 of 56
www.stcny.com
Connector QTY
20
12
4
Steps 2,3,4
Steps 1
Step 1,3
1
1
Step 3
Step 3
Step 3
1
Steps 1,3,4
S11
S17L
S17R
S08
S08C
S01
12
2
Steps 5,15 S37
G16A
4 Step 9
8 Step 4
S22
S20
Connector QTY
219
12
12
Steps 1,9
Steps 1,9
Step 8,13
4 Step 16
Steps 1,3,4,9
S13
2
S14
S24
S36
S02
2 9 petSS42
4
3 petSS52
Step 13 8S48
Connector QTY
2 Steps 1,3
P05
2 Steps 1,3
P09
2 Steps 1,3
P10
2 Steps 1,3
P04
4 Step 4
P03
4 Steps 3,4 P01
2 Step 4 P19
4 Step 4 P39
1 Step 9 P21
2 Step 3 P28
1 Step 3 P18
1 Step 1 P12
10
10
S34
S35
Step 15
Step 15
Anchor Clip and Peg QTY
Step 13 S43 1
1.1A
Assemble Back
1.2A
Secure with S02 screws.
1.1B
Secure with S02 screws.
1.2B
QTY
4
6
#S01
#S02
QTY
1
1
1
1#G03C
#G03D
Connector
QTY
#G02A
#G02B
Line up bottom hole on short side of
connectors S01 with hole on side of
S01
S02
Place all the parts for the back face on a level surface.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
!The back is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
6 of 56
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
!
26”
(660 mm)
G03C G03D
S01
S02
26”
(660mm)
G02B
G02A
1.1A
Assemble Back
1.2A
Secure with S02 screws.
1.1B
Secure with S02 screws.
1.2B
QTY
4
6
#S01
#S02
QTY
1
1
1
1#G03C
#G03D
Connector
QTY
#G02A
#G02B
Line up bottom hole on short side of
connectors S01 with hole on side of
S01
S02
Place all the parts for the back face on a level surface.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
!The back is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
6 of 56
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
!
26”
(660 mm)
G03C G03D
S01
S02
26”
(660mm)
G02B
G02A
1.3A
1.3B
Secure with four S02 screws.
channels lining up last hole of
S01 with holes in G17D.
7 of 56
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
QTY
1#G17D
1#G17C
Screw
4#S02
G02B
G03C G03D
G02A
G17D
G17C
G02A
G03D
G03C
G17D
G17C
G02B
Slide connectors S08 into channels
1.4A
1.5A
Secure with four S02 screws.
1.4B
Secure each connector with
two S02 screws.
1.5B
QTY
6
3
#S02
#S08
Connector
G03L
S08
S02
NOTE: ALL VIEWS ARE FROM INSIDE
S08
G03L
G03K
S08
S08
G03K
G03L
S02
S02
G03K
#S02
QTY
1
4
QTY
1
1
#G16A
#G03L
#G03K
Connector
8 of 56
www.stcny.com
G16A
G02B G03C
G03D
G02A
1.6A
1.6C
P04
P05
G01I
P04
G01I
P05
G01J
G01J
click into place.
Connectors P04 and P05 CLICK into place.
!
G16A
G01I
G01J
#S02
QTY
1
2
QTY
1
1
#G16A
#G01J
#G01I
Connector
Line up the outside holes on G16A with second
S02 screws.
1.6B
NOTE: ALL VIEWS ARE FROM INSIDE
9 of 56
www.stcny.com
G01I
G01J
1#P05#P04
QTY
QTY
1
Connector Connector
1.8A
QTY
6 #S02
Screw
Line up holes on connectors S08 with holes in
with two S02 screws.
1.8B
NOTE: ALL VIEWS ARE FROM INSIDE.
10 of 56
www.stcny.com
Connectors P04 and P05 CLICK into place.
!
G01I
S02
S08
P04
P05
G01I
G01J
G02B
G03K
G03L
G03D
G02A
1.7
G02B
G03C
G03K
G03L
G03D
G02A
Remove protective plastic from EACH side of clear
panels before installing. Dispose of plastic properly.
Install with outward curved side FACING DOWN.
!
G17D
QTY
2
Clear Panel
#GY2
GY2
GY2
Remove protective plastic from both sides of panels
GY2 . The clear panels are designed with
window shapes that curve outward.
Place the outward curved side
G02B, G03C, G03D, G17C
and G17D.
G03C
G03C
G03D
G02A
G02B
G03L
1.9A
11 of 56
www.stcny.com
Screw hex nut S14 onto bolt. Do not
completely tighten.
1.9B
QTY
QTY
H50G# 4
Bolt/Nut
6
6
#S13
#S14
S13
S14
G05H
G05H
G05H
G05H
G05H
1.10A
1.10B
securely into the V-channels.
G03D, G03L and G03K.
NOTE: ALL VIEWS ARE FROM INSIDE.
Remove protective plastic from both sides of panels GY20 and GY21. The clear panels are
designed with window shapes that curve outward. Place the outward curved side facing down.
Remove protective plastic from EACH side of clear
panels before installing. Dispose of plastic properly.
Install with outward curved side FACING DOWN.
!
G05H
GY20
GY21
G05H
G05H
G05H
GY20
GY20
GY21
GY21
GY20
GY21
G05H
QTY
2
QTY Clear PanelClear Panel
#GY21
2
#GY20
G05H
G05H
G05H G05H
1.11A
QTY
1#P12
Connector
QTY
1#P09
QTY QTY
1#P10
ConnectorConnector
1
1
#G02I
#G02J
!
P09, P10 and P12 until they click into place. Connectors P09, P10 and P12 CLICK into place.
IMPORTANT: The ho
les are not at t
he
midpoint
portion will be the bottom when standing.
12 of 56
www.stcny.com
G02J
P10
P09
G02I
P12
G02J
G02I
P10
P09
24.5”
(623 mm)
24.5”
(623 mm)
P12
G02J
G02I
1.10C
Slide hex nut S14 and hex bolts S13
G03C, G03D, G03L and G03K.
Tighten securely to hold in place.
NOTE: ALL VIEWS ARE FROM INSIDE.
the V-channels.
QTY
1
QTY Clear PanelClear Panel
1
#GY7
1
#GY8
#GY16
1
#GY17
1.10D
Remove protective plastic from both sides of panels GY7, GY8, GY16 and
GY17. The clear panels are designed with window shapes that curve
outward. Place the outward curved side facing down.
Remove protective plastic from EACH side of clear
panels before installing. Dispose of plastic properly.
Install with outward curved side FACING DOWN.
!
GY8
GY7
GY16
GY17
G03C
G03D
G03L
G03L
G05H
G05H
G05H
G05H
1.12A
and G03C, G02J and G03L and G02J and
G03D matching up all holes.
Screw S02 screws partially into
bottom two holes. Do not tighten.
Screw S02 screws
into top two holes. Tighten
all screws. Repeat for both sides.
1.12C
1.12B
!
S11
S02
S02
P10
G02A
G02B
Connectors P09 and P10 CLICK into place.
1.11B
S02
S02
QTY
12
3
#S02
#S11
Connector
13 of 56
www.stcny.com
P09
P10
G02I G02J
P09
G02I
NOTE: ALL VIEWS ARE FROM INSIDE.
G03C
G03L
G03D
G02I G02J
G02J
row of ribbed edges on panels GY7,
and G02J. Connectors click
GY8
GY7
GY16
GY17
P09 and P10
Insert long side of cable connector S06 at an angle
UP. Slide connector to other side of
channel. Use hex key to securely
tighten and hold in place.
Attach one side of short cable S16 to hook on S06
second S06 cable connector and with hook facing center, insert into
square and cable is tight. Use hex key to securely tighten and hold in place.
Repeat step 1.13 inserting cable connectors S06
corners are square and cable is tight. Use
hex key to securely tighten second
connector and hold in place.
1.13A
1.13B
1.14
IMPORTANT: Make sure all corners
are squared at 90 degrees.
IMPORTANT: Make sure all corners
are squared at 90 degrees.
G01I
G03C
G01I
G01J
G01J
G03D
61S# 2#S06
QTY
QTY
4
Cable Connector Cable
QTY
1
Hex Key
14 of 56
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
G02B
G01J
G01I
G02A
G17C
G17D
G01I
G01J
G02B
G02A
G17C
G17D
Prepare Doors
!
Place all the parts for both doors on a level surface.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
!
installing. Finish assembly with the outside facing the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
15 of 56
www.stcny.com
2.1A
2.1B
Remove protective plastic from both
sides of panels on DOOR 1G.
Place side to face
the sun facing
down.
Remove protective plastic from EACH side of clear panels before installing.
Dispose of plastic properly. Install with outward curved side FACING DOWN.
!
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
1
DOOR 1G
DOOR 1G
G13B G13B
G13E
G13E
DOOR 1G
S14
S52
S52
Remove S52 screws and S14 nut as shown.
16 of 56
www.stcny.com
2.3C
S29
S30
S31 S31
G13C
NOTE: Connectors packaged as Door Handle Kit.
Slide hairpin clip S44 into
groove on pin S29
to hold securely
in place.
Hook one side of spring S33 into hole on handle S30.
2.3B
2.3A
Open door handle kit and remove parts. Slide pin S29 through handle
1
QTY
2
QTY
Connector
Connector
1
1
#S29
#S30
#S31
#S33
#S44
1
S44
G13C
S33
G13C
2.2
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
Brace
1#G15D
Place brace G15D onto DOOR 1G lining up the holes on each end with the holes
Secure brace with two S52 screws
and S14 hex nut.
S14
IMPORTANT: The hole for hex bolt is not at the midpoint of brace. Turn
brace until all holes line up. Brace will dip slightly when hex bolt is secured.
G13B
G13C
G15D
DOOR 1G
G13B
G13E
G13C
G13E
G13E
S52
DOOR 2G
17 of 56
www.stcny.com
2.4B
2.4A
Remove protective plastic from both sides of panels on DOOR 2G.
Place side to face the sun facing down.
Remove protective plastic from EACH side of clear
panels before installing. Dispose of plastic properly.
Install with outward curved side FACING DOWN.
!
QTY
Brace
1#G15D
DOOR 2G
G13D
Remove S52 screws and S14 nut as shown.
G13D
S52
S52 G13H
G13H
DOOR 2G
G13D
G18A
G13G
G13H
G15D
S14
2.4B
Place brace G15D onto DOOR 2G lining up the holes on each end with
brace. Secure brace with two S52 screws and S14 hex nut.
IMPORTANT: The hole for hex bolt is not at the midpoint of brace. Turn
brace until all holes line up. Brace will dip slightly when hex bolt is secured.
G13D
S52
G18A
S52
G13G
G13H
S14
QTY
1
DOOR 2G
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61

STC EG45812VG User guide

Type
User guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI