STC EG45612 User guide

Type
User guide
Y
e
a
r
s
W
a
r
r
a
n
t
y
P
C
S
H
E
L
L
7
10
Y
e
a
r
s
W
a
r
r
a
n
t
y
S
T
R
U
C
T
U
R
E
Easy Grow
TM
6’ x 12’ Greenhouse
Assembly Instructions
Systems Trading Corporation
450 7th Avenue Suite 2809, New York, NY 10123
Customer service: 1-877-782-4482 Email: [email protected]
T
www.stcny.com
1 / 44
Introduction
Before Starting Assembly:
5. Make sure you have the proper tools:
After choosing a location, proper preparation of the site is essential. The site must be level. If the site is
not level, create a base slightly larger than the outside dimensions of the greenhouse using a perimeter
diagonals from both sides and making sure they are equal. The greenhouse is secured from the inside
with pegs into holes cast with concrete. See step15 for details.
level. Make sure you have checked with your local authorities regarding any required building permits.
water drainage and easy access to power and water necessary for greenhouse gardening.
Choose a sunny, level position away from overhanging trees and power lines and protected from the
wind as much as possible. The location should be away from structures that could cause snow to drift
on or around the greenhouse.
Locate underground pipes or cables before preparing the site or anchoring the greenhouse.
The List of Parts has the corresponding step number referenced to each part. We recommend that
while you go through the list, make staging areas for each step and place the parts necessary for
2. Lay the parts out in separate staging areas:
3. Select a Location:
4. Prepare a Foundation:
1. Make sure you have all the necessary parts:
Compare the contents of the three cartons to the List of Parts. If any parts are missing or damaged or
you have any questions, please contact Customer Service by phone at 877-782-4482 or by email
at easygr[email protected] before beginning assembly.
CAREFULLY READ ALL INSTRUCTIONS BEFORE YOU BEGIN AND FOLLOW THE STEPS IN
THE ORDER THEY ARE PRESENTED.
NOTE: A cordless drill with Phillips head bit is highly recommended but not essential.
Tape Measure
Work Gloves
Safety Goggles
Phillips Screwdriver
Spirit Level
Small Step Ladder
Wooden Mallet
Liquid Soap or WD40 Lubricant
Scissors
Hex Key (included)
Our patented greenhouse has been designed to be easily assembled. All but one step can be completed
by one person. You will need assistance from another person to attach the roof. Although the greenhouse
can be assembled in six to eight hours, we recommend you take your time and make it a weekend project.
These instructions include helpful hints and important information needed to safely assemble and properly
maintain the greenhouse. Please read these instructions completely before you begin.
Thank you for purchasing your Easy Grow
TM
6x12 Greenhouse. This model features two roof vents and a
circular air vent to ensure proper ventilation. We have also included an automatic vent opener to help
greenhouse will provide years of enjoyment.
2 / 44
www.stcny.com
12
2
2
9
13
13
4
4
5
8
6
10
3
3
11
11
14
15
7
1
1
General Order of Assembly
Step 2: Assemble Front and Back
Step 1: Prepare Doors
Step 3: Assemble Sides
Step 4: Prepare Shelves
Step 5: Connect Sides to Back
Step 6: Connect Sides to Front
Step 7: Prepare Roof Vents
Step 8: Connect Gables and Roof Vents
Step 9: Brace Sides
Step 10: Install Circular Vent
Step 11: Install Side and Roof Panels
Step 12: Install Trim Plates
Step 13: Hang Doors
Step 14: Secure to Ground
Step 15: Install Trays
Safety Advice
Table of Contents
Dispose of all plastic bags safely. Keep them out of the
reach of small children.
Keep children and pets away from the assembly area until
the work is completed.
Always wear shoes, gloves and safety goggles when working.
In manufacturing all sharp edges and burs have been removed
but caution should still be taken when handling metal parts.
Do not lean against or push the greenhouse during assembly.
Take special care not to touch overhead power lines with the
Do not attempt to assemble the greenhouse in windy or wet
Do not position your greenhouse in an area exposed to
excessive wind.
If using power tools or a step ladder always follow the
manufacturers safety instructions.
Hot items such as recently used grills, blow torches etc.,
must not be stored in the greenhouse.
Store the polycarbonate panels in a cool dark place like a
garage until you are ready to use them.
Make sure the greenhouse complies with local building codes.
level surface.
conditions.
Introduction .....................................
Safety Advice .................................
General Order of Assembly ......
List of Parts .....................................
Assemble Front and Back...........
Prepare Doors ...............................
Assemble Sides .............................
Prepare Shelves ............................
Connect Sides to Back ...............
Connect Sides to Front .............
Prepare Roof Vents ......................
Connect Gables and Roof Vents
Brace Sides ...................................
Install Circular Vent ..................
Install Side and Roof Panels ...
Install Trim Plates .......................
Hang Doors ..................................
Secure to Ground .......................
Install Trays.....................................
1
2
2
3
6
8
16
22
23
25
28
29
37
38
39
41
43
44
35
!
G14C
G14D
4
4
G14J
4
G06A
G06C 2
2
2
1
1
G06B 2
G07C 2
G07D 2
2 G17A
2 G17B
G05D
G05D
1
1
G05G
G01D
G02A
G02E
G02F
G02H
G02N
2
2
2
2
2
1
1
4
G02B
2
G03B
G03V
G03E
G03G
4
4
G03T 2
1
4
1
1
1
G04C
G04D
4
4
G04B
4
G03J
G03H
G03Y
2
G03Z
G01M
G01N
2 G01Q
3 / 44
www.stcny.com
List of Parts
The greenhouse is shipped in three cartons. These cartons are heavy. Be careful when lifting them.
Wear proper safety gear including work shoes, gloves and goggles.
Place all the parts for each step in staging areas, checking that you have all parts as you go.
If any parts are missing or damaged, contact STC customer service before beginning assembly:
Customer Service:
877-782-4482 or email: easygr[email protected]
DOOR 3
VENT
QTYFactory Assembled
QTY
QTY
Step 8
Step 8
Step 3
Step 8
Step 8
Steps 2
Steps 2
Step 2
Step 2
Step 3
Step 3
Step 3
Step 8
Step 8
Step 8
Step 8
Step 8
Step 3
Step 3
Step 3
Step 8
Step 2
Step 2
Step 2
Step 4
Step 4
Step 3
Step 2
Step 2
Step 3
Step 3
Step 2
Step 2
Step 2
Step 7
Step 1
DOOR 3
VENT 1
Step 1
QTYFactory Assembled
QTY
QTY
3 Y31
1 Y32
4 Y33
4 Y11
6 Y12
2 Y13
4
Y5
8
Y09
Y10
2
4 / 44
www.stcny.com
S29
S30
S31
S33
S44
4
2
2
2
2
1
S25
1 S41
2
S41A
S06
S07
S16
G15A
S23
4
1
2
24
8
9
4
1
1
G09C 2
G09D 2
J02L 2
J02R 2
J03 2
J06 1
#S51
#S50
4#P30
2
2
2
#S49
Twin Panel QTY
Door Handle
QTY
Roof Vent Handle
QTY
Auto Vent Opener
QTY
Circular Vent
QTY
Door Hinge Parts
QTY
Trim Plate
QTY
circular vent
vent frame
plastic nut
Bracing Parts
QTY
Twin Panel QTY
Step 2
Step 2
Step 2
Step 11
Step 11
Step 11
Step 11
Step 11
Step 2
Door Handle
QTY
Steps 2,9
Steps 2,9
Steps 2
Step 8
Step 9
Step 1
Step 1
Step 1
Step 1
Step 1
Step 1
Step 7
Roof Vent Handle
QTY
Step 8
Step 8
Auto Vent Opener
QTY
Step 10
Step 10
Step 10
Circular Vent
QTY
Step 13
Step 13
Step 13
Step 13
Door Hinge Parts
QTY
Step 12
Step 12
Step 12
Step 12
Step 12
Step 12
Trim Plate
QTY
circular vent
vent frame
plastic nut
hex key
Bracing Parts
QTY
30
J05
5 / 44
www.stcny.com
20
8
2
2
S17L
S17R
S08
S01
8 S37
4
8
S22
S20
167
6
6
S13
2
S14
S24
S02
2
1
S42
S43
8
S52
8
S48
4
2
2
2
2
P05
P09
P10
P04
P03
6 P01
2 P19
4 P39
1 P21
1
4
1
P28
P18
P12
10
10
S34
S35
Connector
QTY
Connector
QTY
Shelf Trays
QTY
Anchor Clip and Peg
QTY
Connector
QTY
Connector
QTY
Steps 2
Steps 2
Steps 2
Steps 2
Step 3
Steps 2,3
Step 3
Step 3
Step 8
Step 2
Step 2
Step 2
Steps 3,4
Step 2
Step 2
Steps 2,3,4
Steps 4
Step 8
Step 3
Connector
QTY
Step 15
Shelf Trays
QTY
Steps 1,8
Steps 7
Step 8
Steps 1,8
Steps 1,2,3,4,9
Step 12
Step 2
Step 13
Step 14
Step 14
Anchor Clip and Peg
QTY
6 / 44
www.stcny.com
!
!
1.1A
1.1B
!
2
DOOR 3
G13B
G13B
G13A
DOOR 3
S14
S52
S52
G13A
Prepare Doors
Lay out all the parts for the doors in a staging area.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
The doors are partially assembled at the factory.
Remove protective plastic from both sides of panels on DOORS 3. Place sides to face the sun facing down.
Both doors are identical and partially assembled at the factory.
Remove protective plastic lm from both sides of panels. ALL VIEWS ARE SHOWN FROM THE INSIDE.
Remove protective plastic from EACH side of clear panels before installing.
Dispose of plastic properly. Install with outward curved side FACING DOWN.
NOTE: ALL VIEWS ARE FROM INSIDE.
QTYDOOR 3
Remove S52 screws and S14 nut as shown.
7 / 44
www.stcny.com
1.3C
1.3D
S29
S30
S31
S31
G13C
1.3B
1.3A
2
4
2
2
#S29
#S30
#S31
#S33
#S44
2
S44
G13C
S33
G13C
1.2
2
#G15A
S14
G13B
G15A
DOOR 3
G13B
G13A
S52
G13A
brace until all holes line up. Brace will dip slightly when hex bolt is secured.
G13C
NOTE: Connectors packaged as Door Handle Kit.
Slide hairpin clip S44 into groove on pin S29 to
hold securely in place.
Hook one side of spring S33 into hole on handle S30.
Repeat steps 1.2 through 1.3C
to complete second door.
Open door handle kit and remove parts. Slide pin S29 through handle
QTY
QTY
Connector
Connector
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
Brace
Place brace G15A onto DOOR 3 lining up the holes on each end with the holes in
brace with two S52 screws and S14 hex nut.
IMPORTANT: The hole for hex bolt is not at the midpoint of brace. Turn
8 / 44
26”
(660 mm)
G06B
G06A
x2
G06B
G06A
26”
(660 mm)
G02B
G02A
G02B
G02A
G06A
S01
G02B
S01
G02A
S01
G06B
S01
!
!
2.1A
2.1B
www.stcny.com
8
8
#S01
#S02
2
22
2 #G06A
#G06B
#G02A
#G02B
S02
Assemble Front and Back
The front and back are assembled with the outside face to the ground.
ALL VIEWS ARE SHOWN FROM INSIDE.
Lay out all the parts for the front face in a staging area.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
QTY
Connector
QTY
2.1C
Repeat steps 2.1A & 2.1B to complete assembly
of one more set ofG02A, G02B, G06A and G06B.
One set is used for assembly of front panel and
the other for the back panel.
9 / 44
www.stcny.com
2.3A
2.3B
G06B
G06A
G06C
2#G17B
2#G17A
8#S02
2.2A
2.2B
2.2D
2.3C
2.2C
S17R
x2
G06A
S17L
G06B
S17L
S52
S17R
S17L
G06B
G06A
G06C
S17R
S52
G02B
G02A
G06B
G06A
G17B
G17A
G17B
S01
S02
S02
G02B
G02A
G06B
G06A
G17B
G17A
#S17R
#S17L
#S52
4#P28
2
2 2
#G06C
44
#S52
P28
P28
P28
P28
Slide proles G06C into G06A and G06B, using connectors P28.
NOTE: P28 connectors do not snap into place.
Secure each connector with two S52 screws.
Repeat step 2.2A
through 2.2C
to duplicate one more set.
Repeat step 2.3A & 2.3B
to duplicate one more set.
Place connectors S17L and S17R on corners
matching up bottom two holes with holes
in proles G06A, G06B and G06C as shown.
QTYQTY QTY
QTY
Connector Connector Connector
Secure with four S02 screws.
QTY
QTY
Screw
NOTE: ALL VIEWS ARE FROM INSIDE.
10 / 44
www.stcny.com
2.4A
2.4B
2.5
G06C
Y5
2
4
#Y5
#Y33
1#P182#P09 2#P10
2
2
#G02E
#G02F
1#P12
!
P10
P09
P18
G02F
26.8”
(680 mm)
26.8”
(680 mm)
G02B
G02A
G06B
G06A
G06C
Y33
Y33
Y5
!
G17B
G17A
G02F
G02E
P10
P09
P18
G02F
G02E
QTY
Panel
Repeat to complete 2 sets.
Use P18 on front and P12 on back.
IMPORTANT: The holes are not at midpoint
of the proles. Arrange prole so the 26.8”
portion will be the bottom when standing
Slide proles G02E and G02F into connectors P09, P12 and P10
until they click into place.
x2
NOTE: ALL VIEWS ARE FROM INSIDE.
Remove protective plastic from both
sides of panels Y5 and Y33. Place side
to face toward the sun facing down.
Fit Y5 panel into V-channel on
prole G06C.
Remove protective plastic from EACH side of poly carbonate
panels before installing. Dispose of plastic properly. Install with
side labeled “Face this side towards the sun” FACING DOWN.
QTY
Connector
QTY
Connector
QTY
QTY
QTY
ConnectorConnector
Connectors P09, P10 and P18 CLICK into place.
11 / 44
www.stcny.com
G02B
G02A
2.6B
2.6C
2.6A
!
4#S02
G06B
S17L
G06A
G02E
G02F
S17R
G02A
G02B
P10
P10
P09
P09
G02F
G02E
S02
S02
Y33
Y33
Y5
Place connectors S17L and S17R on frame, lining up holes as shown.
Secure with two S02 screws.
and G02B. Continue sliding together making sure
G02E. Connectors click
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
Screw
Connectors P09 and P10 CLICK into place.
x2
Repeat steps 2.1 through 2.6B to complete
the frame of the back of the greenhouse.
12 / 44
www.stcny.com
2.7
2.7A
G02B
G02A
G06B
G06A
G17B
G17A
3
#Y31
1
#Y32
!
Y32
Y31
G02B
G02A
G06B
G06A
G17B
G17A
Y31
Y31
Slide two Y31 panels into V-channels on proles
G02A, G02B, G06A and G06B of the greenhouse BACK.
Fit top edges into proles G17A and G17B.
Front Back
Slide one Y31 and one Y32 panel into V-channels on proles
G02A, G02B, G06A and G06B of the greenhouse FRONT.
Fit top edges into proles G17A and G17B.
Remove protective plastic from both sides of
panels Y31 and Y32. Place side to face toward
the sun facing down.
FRONT
BACK
QTY
QTY
PanelPanel
Remove protective plastic from EACH side of poly carbonate
panels before installing. Dispose of plastic properly. Install with
side labeled “Face this side towards the sun” FACING DOWN.
ALL VIEWS ARE FROM INSIDE.
www.stcny.
13 / 44
2.8A
2.8B
#P01
2
2
2
#G01N
#G01Q
#G01M
G01N
G01N
G01Q
G01Q
G01Q
P01
P01
P01
P01
G01M
G01M
2#P05#P04
2
P04
P05
!
G01N
P04
P05
G01M
G01N
G01M
4
x2
into place.
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
QTY
Connector Connector
Connectors P04 and P05 CLICK into place.
Connectors P01 and P03 look very similar. P01 has
built in nuts used to support door hinges installed in Step 13.
MAKE SURE TO USE CONNECTOR P01 FOR THIS STEP.
IMPORTANT:
Connectors P01 CLICK into place.
QTY
Connector
QTY
www.stcny.com
14 / 44
2.9
!
Y32
Y31
G02B
G02A
G06A
G06B
P05
P01
P01
P04
G01M
G01N
G01Q
P05
P01
G06A
G02A
G01N
Repeat steps 2.8A through 2.9 to t the
bottom proles to the back of the greenhouse.
x2
way into place, carefully line up P01 connectors with
G06B and G06A and P04 and P05 connectors with
into V-channels. Snap connectors
P01, P04 and P05 securely
NOTE: ALL VIEWS ARE FROM INSIDE.
Connectors P01, P04 and P05 CLICK into place.
15 / 44
www.stcny.com
2.11
2.10A
2.10B
2.10C
4#S16#S06
81
G02B
G02A
G06A
G06B
G01N
G01Q
G01M
G17A
G17B
Y33
Y33
Repeat steps 2.10A through 2.11 to attach cables to the back of the greenhouse.
x2
facing up. Slide connector to other side of channel. Use hex key to securely tighten
and hold in place.
Use hex key to securely tighten and hold in place.
connector to hold in place.
QTY
QTY
Cable Connector Cable
QTY
Hex Key
NOTE: ALL VIEWS ARE FROM INSIDE.
IMPORTANT: Make sure all corners are squared at 90 degrees.
2.10
16 / 44
www.stcny.com
!
!
8
8
#S01
#S02
4#G03V
3.1B
3.1C
3.2B
L03A
26”
(660 mm)
6 3/4”
(172 mm)
G03V
S01
3.1A
G03V
S01
G03V
S02
S02
4
4
#S01
#S02
4#G04D
3.2A
S01
G04D
S02
Assemble Sides
You are assembling both sides in the following steps. Both sides are identical until step 5.1
Place all the parts for the sides on a level surface.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
QTY
QTY
Connector
Slide another connector S01 so it lines
Secure all pieces with S02
screws. Repeat to make four sets.
Secure with S02 screw. Repeat to make four sets.
QTY
QTY
Connector
NOTE: ALL VIEWS ARE FROM INSIDE.
of connectors
17 / 44
www.stcny.com
G04B
3.5B
4#G04C 8#S02
4#P39
3.5A
3.3
3.4
!
4#G04B 4#P03
P39
G03V
G04C
S01
S01
G04B
G03V
G04C
G04B
S02
S02
P03
P03
P03
P39
G04D
Repeat to make four sets.
Slide connector P03 into
Connector
Connector P39 CLICKS into place.
Connector P03 CLICKS into place.
QTY
Att into the
Secure with two S02 screws. Repeat to make four sets.
IMPORTANT: Connector P03 rests on top of connector
S01. S02 screw secures P03 to prole G04B.
QTY
QTY
Screw
QTY
QTY
Connector
NOTE: ALL VIEWS ARE FROM INSIDE.
18 / 44
www.stcny.com
3.6B
3.6A
!
4#S02
3.7B
8
4
#S02
#S08
4
4
#S02
#S20
3.7A
S20
S08
G03V
S20
S08
S02
S02
S01
G04D
G03V
G04C
G04B
P39
P39
S02
Secure with S02 screw. Repeat to
make four sets.
connector S01 into channel of G04C.
Slide long side of connectors S20
QTY
Screw
Connector P39 CLICKS into place.
Secure with three S02 screws.
Repeat to make four sets.
QTY
Connector
QTY
Connector
NOTE: ALL VIEWS ARE FROM INSIDE.
19 / 44
www.stcny.com
S20
S08
G03B
3.8A
3.8B
G03B
S02
S02
3.9B
3.9A
#S02 12#G07C 22#G01D
8
4
#S02
#S08
4
4
#S02
#S20
4#G03B
G03B
G07C
G03V
G07C
G01D
G03B
G03V
G07C
G01D
S02
G07C
G01D
G03B
G03V
lining up holes as shown.
Secure with three S02 screws. Repeat to make four sets.
Secure with six S02 screws. Repeat to make two sets.
QTY
Screw
QTYQTY
QTY
Connector
QTY
QTY
Connector
NOTE: ALL VIEWS ARE FROM INSIDE.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47

STC EG45612 User guide

Type
User guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI