Vita CLASSIC Kensington Planter Box & Trellis Operating instructions

  • Hello! I'm a chat assistant, and I've reviewed the assembly instructions for the Vita Kensington Planter Box & Trellis. This document outlines the steps to assemble the planter box and trellis using pre-assembled panels, screws, and post caps. I'm ready to answer any questions you have about the assembly process or the product components.
  • What should I do if there are missing or defective parts?
    Do I need to drill pilot holes?
    What area should I use to assemble this?
1. Pre-Assembled Back Panel with Trellis (1) - 10895
2. Pre-Assembled Side Panels
(2) - 10896
3. Pre-Assembled Front Panel with Posts Connected (1) - 10894
4. Wide Floorboard (1) - 10897
5.
Post Caps (4) - 10611
6. 2 1/2” (64 mm) Stainless Steel Screws (4) - 20009-1
7.
1 1/2” (38 mm) Stainless Steel Screws
(8) - 20005
8. Narrow Floorboard (1) - 11232
General Information
Read Instructions through carefully before beginning assembly.
When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
We recommend an area approx 4’x 8’ (1.2 m x 2.4 m) for unobstructed assembling.
You should not need to use excessive force when assembling components.
All screws are self-tapping, therefore no pilot holes are necessary on product.
The Kensington Planter Box & Trellis
Please read through before starting assembly.
Check Box for These Contents
In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346 (Mon. to Fri. 8:00 AM to
5:00 PM EST).
ASSEMBLY INSTRUCTIONS
1
1
3
2
Ver 1.6 March 27, 2023
23 in
(58 cm)
16 in
(41 cm)
18.375 in
(47 cm)
65.3 in
(166 cm) 63.7 in
(162 cm)
20 in
(51 cm)
21.4 in
(54 cm)
16 in
(41 cm)
2 in
(5 cm)
5
6
Not to Scale
7
www.wearevita.com
8
4
2
Fit the front wall panel over the side walls. Push until the panels
bottom out. Using the 1 1/2(38 mm) screws provided, secure the
side wall panels into the front wall panel with 2 screws at the end of
the rails. Screws should only be drilled in half-way so that panels do
no pull out of the posts when under stress.
3
4
5
STEP ONE
Slide the floorboards together and place inside the planter box.
Install the four post cap to the four posts as shown.
Connect the Front & Back Wall
to the Side Wall Panels
1
2
5
1
23
4
STEP T WO
Install the Floor Boards and
Post Caps
Layout front wall panel on the work surface.
Insert the side walls into the routed holes on the front wall
panel
posts. Push until The panel bottoms out. Fasten each panel with two
2 1/2" (64 mm) screws on the side of the trellis post as shown.
www.wearevita.com
North America Toll Free Phone: 1 800 282 9346
/