Fortress Technologies PURE VIEW GLASS BALUSTER FOR Fe26 STEEL Installation Instructions Manual

  • Hello! I am an AI chatbot trained to assist you with the Fortress Technologies PURE VIEW GLASS BALUSTER FOR Fe26 STEEL Installation Instructions Manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
1
PURE VIEW GLASS BALUSTER FOR Fe
26
STEEL
INSTALLATION INSTRUCTIONS
Pure
View®
PURE VIEW GLASS BALUSTER FOR Fe
26
STEEL
INSTALLATION INSTRUCTIONS
PANNEAUX À BALUSTRES DE VERRE PURE VIEW POUR SYSTÈME EN ACIER Fe
26
INSTRUCTIONS D’INSTALLATION
2
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
English
Introducon.........................................................................3
UniversalBracket(UB).............................................4
CollarBracket(CB).................................................16
AngledBracket(UB&CB)......................................20
Stair Bracket (UB & CB)..........................................28
Care&Maintenance..............................................40
Warranty.................................................................41
Español
Introducción...........................................................................3
Soporte universal (UB)...............................................4
Soporte de collarín (CB)............................................16
Soporte en ángulo (UB y CB)....................................20
Soporte de escalera (UB y CB)..................................28
Cuidado y mantenimiento........................................40
Garana.................................................................... 41
Français
Introducon.........................................................................3
Ferrureuniverselle(FU)...........................................4
Ferrureàcollier(FC)..............................................16
Ferrureàangle(FU&FC)......................................20
Ferrure pour escalier(FU&FC).............................28
Entreen................................................................40
Garane.................................................................41
TABLE OF CONTENTS
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
3
INTRODUCTION
READ INSTRUCTIONS COMPLETELY BEFORE
STARTING INSTALLATION
It is the responsibility of the installer to meet all code and
safety requirements, and to obtain all required building
permits.Thedeckandrailinginstallershoulddetermine
andimplementappropriateinstallaontechniquesfor
eachinstallaonsituaon.FortressRailingProductsandits
distributors shall not be held liable for improper or unsafe
installaons.
FortressPostsmustalwaysbesecuredtothedeck
framingandshouldneverbeaachedtoonlythedeck
boards.
PureViewI-SupportisrequiredforCanadian
CodeCompliance.
Note
WhencungFortressrailing,itisveryimportantto
completethefollowingatcutpoints:
• Removeallmetalshavingsfromthecutarea.
• Fileanysharpedgeslebycung.Thoroughlywipeand
removeanylings,grime,ordirtfromtherailing.
• ApplytwocoatsofFortresszincbasedtouch-uppaintto
thecutarea.Iftouchupisatrailends,allowpainttodry
beforeconnecngbrackettopost.
Be sure to remove any metal shavings from the surface of
deck,pao,orbalconytopreventstainsonthedeck
surface.
Torx Safety Tips
• Alwaysusethelowestspeedsengondrill.
• Toreducechanceofbitbreakage,startghteningwithdrill
onlowtorquesengandworkupunlscrewissecured.
Tip: Pre-drill holes with 3/16” [4.5mm] drill bit.
4
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
Required Tools
Goggles
Drill
Tape
Measurer
Level
Tool
Speed
Square
Touch-Up
Paint
MetalCung
MiterSaw
T-25
Driver Bit
#2Phillips
Head Bit
Bit
Extender
DrillBits:
1/16”,3/16”,3/8”,
[1.5mm,4.5mm,9.5mm]
Pure View: Fe
26
Glass Baluster Universal (UB) Brackets
InstallaonOpon
Pencil
Rubber
Mallet
Ball Cap
UB-05Cap
PressedDomeCap
Base Cover
UB-05Cup
3-3/4”[95.5mm]I-Support
Spring
Punch
Safety
Gloves
2”x4”
Wood
3-3/4”
[95.5mm]
2”X2”&3”X3”
[51mmx51mm]&
[76mmx76mm]IronPostsWithBase
PureView:SteelRail
69-1/2”[1765.5mm]
PureView
Glass Baluster
File
UNIVERSAL BRACKET
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
5
*Installed heights include a 3-3/4”[95.5mm]spacebetweendecksurface
andboomedgeofboomrail.
Universal Bracket (UB)PostConguraon
34”[864mm]
40”[1016mm]
38-1/16”[967mm]
43-7/8”[1114mm]
39-1/2”[1003mm]
45-1/2”[1156mm]
Fe
26
Pure View Baluster
Panel Height
Rail Panel
InstalledPanelHeight* RequiredPost
Step 1: Install Wood Blocks
1. InstallWoodBlocklevelwithtopofjoist.AsshowninFig.1(A)
2. SecureWoodBlocktoblockingonallfoursideswith#10X
3-1/2”[89mm]deckscrews.
WoodBlockmustbeconstructedwithtreateddimensional
lumberwithaminimumthicknessof11/2”[38mm].
POST MOUNTING
*IfusingFortressEvoluonFraming,contactFortressforinstrucons.
Note:
Its recommended to install brackets into post before post
mounng.Referencepage7forbracketInstallaonsteps.
Fig. 1
#10x3-1/3”
[84.5mm]
(A)
(A)
Joist
Blocking
6
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
Step 2: PosionBasePlate
1. PosiontheedgeofAL
13
HOME base plate a minimum
of½”[12.5mm]fromtheinsideedgeofrimjoist.
AsshowninFig.1.
Fig. 1
1/2”[12.5mm]
1/2”
[12.5mm]
Step 4: Mount Posts
1. Markmounngholelocaonsandpre-drilla3/8”[9.5mm]
hole.
2. Insert3/8”x3-1/2”[9.5mmx89mm]HexHeadgalvanized
boltsthrough3/8”[9.5mm]galvanizedwasherandpost
baseplate.
Fig. 1
Step 3: Max Post Spacing
6’panelmaximumpostspacingis69-3/4”[1771.5mm].
Note:
Do not exceed the maximum post spacing.
6’panelmaximumpostspacingis69-3/4”
[1771.5mm]
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
7
Note:
PostBasePlateholesMUSTbeposionedaminimum½”
[12.5mm]fromedgeofdeckboard.
Useonly3/8”[9.5mm]HexHeadGalvanizedBolts.Lag
ScrewsshouldNOTbeused.Secureeachpostwithfourbolts.
Fig. 1 Fig. 2
OTP and Proud Post: Max Post Spacing
• 8’ panel maximum post spacing is 93-7/8”.
• 6’ panel maximum post spacing is 69-7/8”.
Note: Do not exceed the maximum post spacing.
8’ Panel max post spacing 93-7/8”
6’ Panel max post spacing 69-7/8”
OTP and Proud Post: Measuring The Panel Opening Length
• Measure the distance of the panel opening.
• Measure from the back wall of the bracket to the back wall of the bracket on other post.
• Confirm that the measurements for the top brackets are the same as the bottom brackets.
Measure the panel opening
Not here
Measure from
back of bracket
Check measurement with top
3/12
OTP and Proud Post: Max Post Spacing
• 8’ panel maximum post spacing is 93-7/8”.
• 6’ panel maximum post spacing is 69-7/8”.
Note: Do not exceed the maximum post spacing.
8’ Panel max post spacing 93-7/8”
6’ Panel max post spacing 69-7/8”
OTP and Proud Post: Measuring The Panel Opening Length
• Measure the distance of the panel opening.
• Measure from the back wall of the bracket to the back wall of the bracket on other post.
• Confirm that the measurements for the top brackets are the same as the bottom brackets.
Measure the panel opening
Not here
Measure from
back of bracket
Check measurement with top
3/12
Step 1: MarkBracketHoleLocaons
1. Markthecenterlineofeachpostwithapencil.
2. TakemeasurementsusedinFig.1and2tomarkboom
andtopbracketholelocaonsontoposts.
Tip:
Remove all metal shavings from deck, post base
cover, post, and panel before bracket is screwed to
post to prevent rust stains.
UNIVERSAL BRACKET: BRACKET INSTALLATION
Step 5: Check Mounted Posts
1. Shimpostasneededtoensurepostislevel.
Fig. 1
Fig. 2
Shim post as needed to
ensure post is level
Deck Board
RimJoist
Joist/Blocking
Wood Block
1/2”
[12.5
mm]
8
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
5/8”[16mm]
37-1/8”[943mm]
*DimensionAposionsboomedgeofrail3-3/4”[95.5mm]abovedecksurface.
*DimensionAismeasuredfromtheboomsurfaceofpostbase.
34” [864mm] Panel
5/8”[16mm]
42-15/16”[1090mm]
40” [1016mm] Panel
4-1/16”[103mm]
4-1/16”[103mm]
5/8”[16mm]
5/8”[16mm]
Fig. 2
B
C
B
A
B A
D
Fig. 1
UB-05BracketHoleLocaons
Pre-drill Dimensions: Pre-drillingwitha5/32”[4mm]drillbitisrequired
A*
B C D
Step 2: Pre-Drill and Install Brackets
Tip:
Itsimportanttodoublecheckdimensionstoconrm
accuracyofbracketholelocaonsbeforedrilling.
1. UseSpringPunchtomarktheholes.AsshowninFig.1.
2. Pre-drillbracketholeswitha3/16”[89.5mm]drillbit.As
showninFig.2.
3. AachBrackettothepostswithsuppliedT-25thread-cut-
ngscrews.Usetwoscrewsperbracket.Uselowspeed
sengondrill.AsshowninFig.3.
4. Oncetopandboombracketsareinstalled,remeasure
bracketspacingtoconrmdimensionsusedinFig.2and3
ofstep1.AsshowninFig.4.
5. R e m o v e a l l m e t a l s h a v i n g s f r o m d e c k , p o s t b a s e c o v e r, 
post,andpanelbeforebracketisscrewedtopostto
preventcorrosion.
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
9
Fig. 1 Fig. 2
Fig. 3
Fig. 4
Step 3: Measure The Panel Opening Length
1. Measurethedistanceofthepanelopening.
AsshowninFig.1.
2. Conrmthatthemeasurementsforthetopbracketsarethe
sameastheboombrackets.
Note:
Measure from the back wall of the bracket to the back wall
of the bracket on other post. As shown in Fig. 2.
10
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
Fig. 1
Fig. 2
Measure the panel opening
Checkmeasurementwithtop
Do not
measure from
post
Measure
from back
of bracket
UNIVERSAL BRACKET: CUTTING DOWN BOTTOM
& TOP RAILS
Step 1: Measure & Mark Rails Where Cuts Will Be Made
1. Toensurerailsaresymmetrical,takethemeasurement
foundonpage9,step3ofBracketInstallaon,anddivideit
inhalf.Thencutequallengthsfrombothends.
2. Find the center of the rails and measure out half of the
lengtheachdirecon.AsshowninFig.1.
3. Marktheselocaonswithapencilonthetopandboom
rail.
Fig. 1
Mark HereMark Here
Mark Here Mark Here
HalfofPanelLength
CenterofRails
Step 2: Cut & Clean Rails
1. Cutrailsusingasawwithaferrousmetalcungblade.
2. Useletosmoothcutedges.
3. Removeanymetalshavingsanddustwithabrushorrag.
4. Makesuresurfacestobepaintedareclean.
Note:
BesurenottocutGrommetsinrails.
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
11
Fig. 1
Fig. 2
Fig. 3
Step 3: Apply Spray Paint To Cut Areas
1. Usingapieceofcardboardasamask,applythe1
st
coat of
Fortresszincbasedtouch-uppaint.
2. Allowtodrybeforeapplyingsecondcoat.
3. Applythe2
nd
coatofFortresszincbasedtouch-uppaint.
4. Allowtodryandinstall.
Fig. 1
2X
1. Measureandlocatethecenteroftheboomrail.Usingthe
I-Supportasaguide,markthecenterofthe2screwholes.
AsshowninFig.1.
2. Usinga3/16”[4.5mm]drillbit,drillthoughtheoutsidewall.
3. InstalltheI-SupportwiththeprovidedT-25threadcung
screws.AsshowninFig.2.
Note:
BesuretoinstallI-Supportonsideofrailfacingdeck.
UNIVERSAL BRACKET: BALUSTER INSTALLATION
Step 1: InstallI-SupportOnBoomRail
12
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
Fig. 2
Set
Screw
Fig. 1
3/16”
[4.5mm]
Hole
Fig. 2
T-25
Thread
Cung
Screws
Step 2:InstallBoomRail
1. Install cut boomrailintothelowerinstalledbrackets.
2. Pre-drillBracket Cup holesforscrewsusinga3/16”
[89.5mm]drillbit.
3. SecurerailtoBracketCupswithprovidedT-25Drive
Thread-CungScrews.Uselowspeedsengondrill.
Fig. 1
UB-05
Cup
UB-05
Cup
3-3/4”[95.5mm]I-Support
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
13
TopRail
Step 3:InstallBalustersIntoBoomRail
1. CarefullyslipBalustersvercallyintoeachslotofthe
boomrail.Holesinbalustersshouldnotbevisibleaer
inseronofbalusterintorail.AsshowninFig.1.
Tip:
Besuretowearsafetyglovesandgoggleswhenhandling
Glass.
Fig. 1
Baluster
Pre-Installed
Grommet*
Step 4: Install Top Rail
1. CarefullyslipTopRailoverthetopoftheBalustersintothe
slots&topBracketCups.
2. Pre-drillBracket Cup holesforscrewsusinga3/16”
[89.5mm]drillbit.
3. SecurerailtoBracketCupsatthismewithprovidedT-25
DriveThread-CungScrews.Uselowspeedsengondrill.
Pre-sloed
BoomRail
*PureViewStandardGrommetscomeinstalledinpre-sloedrails.
Fig. 1
14
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
Step 5: AachI-SupportToDeck
1. FastenI-SupporttodecksurfacewiththesuppliedT-25
WoodScrew.
Tip:
Pre-drillwitha1/16”[1.5mm]drillbit.
Step 1: Install Bracket Cap, Post Base Cover & Pressed Dome Cap
1. BracketCapssnapdownoverBracket Cups.
AsshowninFig.1.
2. Dis-assemblePostBaseCoverandinstallonpost.
AsshowninFig.2.
3.
PressedDomeCaps&BallCapsarepresstintoplace.
AsshowninFig.3&4.
4. Use a broom or compressor to remove debris from railing
anddecksurface.
BRACKET CAP, POST BASE COVER & PRESSED DOME/BALL CAP
INSTALLATION
Fig. 1
Fig. 1
Fig. 2
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
15
Fig. 3
Fig. 4
16
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
Pure View: Fe
26
Glass Baluster Collar Brackets (CB)
InstallaonOpon
Ball Cap
CB-05
PressedDomeCap
Base Cover
3-3/4”[95.5mm]I-Support
3-3/4”
[95.5mm]
2”X2”&3”X3”
[51mmx51mm]&
[76mmx76mm]IronPostswithbase
PureView:SteelRail
69-1/2”[1765.5mm]
PureView
Glass Baluster
Collar Bracket (CB) PostConguraon
*Installed heights include a 3-3/4”[95.5mm]spacebetweendecksurface
andboomedgeofboomrail.
Rail Panel
38-1/16”[967mm]
43-7/8”[1114mm]
InstalledPanelHeight*
39-1/2”[1003mm]
45-1/2”[1156mm]
RequiredPost
Pure View
Baluster Height
34”[864mm]
40”[1016mm]
COLLAR BRACKET: POST MOUNTING
ReferencePostMounnginstruconsonpage5.
Note:
IT’SRECOMMENDEDTOINSTALLBRACKETSONTOPOSTBEFORE
POSTMOUNTING.
COLLAR BRACKET
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
17
COLLAR BRACKET: BRACKET INSTALLATION
Step 1: MarkBracketHoleLocaons
ReferenceBracketholemarkinginstruconsonpage7.
Fig. 2
Step 2: Pre-Drill Bracket Holes
ReferenceBracketholepre-drillinginstruconsonpage8.
Note:
DO NOTinstallBracketsinthisstep.
3-3/16”[81mm] 2-1/2”[63mm]36-1/2”[925mm]
30-5/8”[778mm]
3-3/16”[81mm] 2-1/2”[63mm]
Fig. 1
CB-05BracketHoleLocaons
Pre-drill Dimensions: Pre-drillingwitha3/16”[4.5mm]drillbitisrequired
A* B C
*DimensionAposionsboomedgeofrail3-3/4”[95.5mm]abovedecksurface.
*DimensionAismeasuredfromtheboomsurfaceofpostbase.
34” [864mm] Panel
40” [1016mm] Panel
Step 3: Measure The Panel Opening Length
ReferencePanelopeninginstruconsonpage9.
COLLAR BRACKET: CUTTING DOWN TOP & BOTTOM RAILS
Referencepages10&11forrailcung&spray painngsteps.
A
C
C
B
C
A
18
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
ReferenceI-supportinstallaoninstruconsonpage12.
COLLAR BRACKET: BALUSTER INSTALLATION
Step 1: InstallI-SupportOnBoomRail
Step 2:InstallBoomRail
1. SlideCB-05Bracketsovereachendoftheboomrail.Make
surethatallsetscrewholesfacethedesireddirecon.
AsshowninFig.1.
2. SecureBracketsintopre-drilledBracketholesonpostwith
providedT-25DriveThread-CungScrews.
3. Pre-drillBracketSetScrewholesonboomRailusinga
3/16”[89.5mm]drillbit.
4. SecureBrackettoRailwithprovidedT-25Drive
Thread-CungScrews.Uselowspeedsengondrill.
AsshowninFig.2.
Fig. 1
Fig. 2
SetScrew
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
19
Step 3:InstallBalustersIntoBoomRail
ReferenceBalusterinstallaoninstruconsonpage13.
Step 4: Install Top Rail
1. SlideCB-05BracketsovereachendoftheTopRail.Make
surethatallsetscrewholesfacethedesireddirecon.
AsshowninFig.1.
2. CarefullyslipTopRailoverthetopoftheBalustersintothe
slots.
3. SecureBracketsintopre-drilledBracketholesonpostwith
providedT-25DriveThread-CungScrews.
4. Pre-drillBracketSetScrewholesonboomRailusinga
3/16”[89.5mm]drillbit.
5. SecureBrackettoRailwithprovidedT-25Drive
Thread-CungScrews.Uselowspeedsengondrill.
Fig. 1
TopRail
Step 5: AachI-SupportToDeck
ReferenceI-supportmounnginstruconsonpage14.
Step 1: Post Base Cover & Pressed Dome/Ball Cap
ReferencePostBaseCover&PressedDome/BallCap
instruconsonpages14&15.
POST BASE COVER & PRESSED DOME/BALL CAP INSTALLATION
20
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
ANGLE BRACKET
Pure View: Fe
26
GlassBalusterAngledBracketInstallaon
Opons
Ball Cap
UB-05Cap
PressedDomeCap
Base Cover
UB-05Cup
3-3/4”[95.5mm]I-Support
3-3/4”
[95.5mm]
2”X2”&3”X3”
[51mmx51mm]&
[76mmx76mm]
IronPostswithbase
PureView:SteelRail
69-1/2”[1765.5mm]
Universal Bracket (UB) Adapter
*Installed heights include a 3-3/4”[95.5mm]spacebetweendecksurface
andboomedgeofboomrail.
34”[864mm]
40”[1016mm]
38-1/16”[967mm]
43-7/8”[1114mm]
39-1/2”[1003mm]
45-1/2”[1156mm]
UniversalBracket(UB)AdapterPostConguraon
Fe
26
Pure View Baluster
Panel Height
Rail Panel
InstalledPanelHeight* RequiredPost
UB-05AngleAdapter
PureViewGlassBaluster
/