Fortress Technologies PURE VIEW FULL GLASS PANEL AL13 HOME Installation Instructions Manual

  • Hello! I am an AI chatbot trained to assist you with the Fortress Technologies PURE VIEW FULL GLASS PANEL AL13 HOME Installation Instructions Manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
PURE VIEW FULL GLASS PANEL FOR AL
13
HOME
INSTALLATION INSTRUCTIONS
Pure
View®
PANEL TOTALMENTE DE VIDRIO PURE VIEW PARA AL
13
HOME
INSTRUCCIONES DE INSTALACIÓN
PANNEAUX COMPLETS EN VERRE PURE VIEW POUR SYSTÈME EN AL
13
HOME
INSTRUCTIONS D’INSTALLATION
2
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
English
Introducon.........................................................................3
LevelBracket............................................................4
AngledBracket.......................................................26
Care&Maintenance..............................................34
Warranty.................................................................35
Español
Introducción............................................................................3
Soporte a nivel............................................................4
Soporte en ángulo....................................................26
Cuidado y mantenimiento........................................34
Garana....................................................................35
Français
Introducon........................................................................3
Ferrureàniveau......................................................4
Ferrure à angle......................................................25
Ferrure pour escalier.............................................33
Entreen...............................................................48
Garane................................................................49
TABLE OF CONTENTS
3
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
INTRODUCTION
READ INSTRUCTIONS COMPLETELY BEFORE
STARTING INSTALLATION
It is the responsibility of the installer to meet all code and
safety requirements, and to obtain all required building
permits.Thedeckandrailinginstallershoulddetermine
andimplementappropriateinstallaontechniquesfor
eachinstallaonsituaon.FortressRailingProductsandits
distributors shall not be held liable for improper or unsafe
installaons.
FortressPostsmustalwaysbesecuredtothedeck
framingandshouldneverbeaachedtoonlythedeck
boards.
PureViewI-SupportisrequiredforCanadian
CodeCompliance.
Note
WhencungFortressrailing,itisveryimportantto
completethefollowingatcutpoints:
• Removeallmetalshavingsfromthecutarea.
• Fileanysharpedgeslebycung.Thoroughlywipeand
removeanylings,grime,ordirtfromtherailing.
• ApplytwocoatsofFortresszincbasedtouch-uppaintto
thecutarea.Iftouchupisatrailends,allowpainttodry
beforeconnecngbrackettopost.
Be sure to remove any metal shavings from the surface of
deck,pao,orbalconytopreventstainsonthedeck
surface.
Torx Safety Tips
• Alwaysusethelowestspeedsengondrill.
• Toreducechanceofbitbreakage,startghteningwithdrill
onlowtorquesengandworkupunlscrewissecured.
Tip: Pre-drill holes with 3/16” [4.5mm] drill bit.
4
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Required Tools
Goggles
Drill
Tape
Measurer
Level
Tool
Speed
Square
Touch-Up
Paint
Miter
Saw
T-25
Driver Bit
#2Phillips
Head Bit
Bit
Extender
5/16”[8mm]
Nut Driver Bit
DrillBits:1/16”,
3/16”,3/8”,5/8”[1.5mm,
4.5mm,9.5mm,16mm]
Pure View: Al
13
HOME Full Glass Panel Installaon Opons
Socket
Set
Pencil
Rubber
Mallet
Hex
Wrench
Crescent
Wrench
Socket
Wrench
PostCap
Straight Bracket Cup
Al
13
HOMEPostwithPostBaseCover
Straight Bracket Cap
Spring
Punch
Safety
Gloves
Liquid
Soap
Ratchet
Straps
2”[51mm]or3”[76mm]ProudPost
PureView:Al
13
HOMEFullGlassPanel68-1/2”[1740mm]
RoundAccentTopRail
FlatAccentTopRail
PureViewFullGlass
Al
13
HOMEVercalCable/
PureViewI-Support
File
5
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
2”[51mm]OverThePost(OTP)
FlatATRLine
Splice
RoundATRLine
Splice
RoundAccentTopRail
FlatAccentTopRail
Straight Bracket Cup
Straight Bracket Cup
PureView:Al
13
HOMEFullGlassPanel68-1/2”[1740mm]
Al
13
HOMEPostwithPostBaseCover
PureViewFullGlass
Al
13
HOMEVercalCable/
PureViewI-Support
2”[51mm]or3”[76mm]ProudPostConguraons
*Installedheightsincludea3-1/2”[89mm]forthe32-1/2”[825.5mm]panel&2”[51mm]forthe
40”[1016mm] panel spacebetweendecksurfaceandboomedgeofboomrail.
Al
13
HOME
Panel Height
40”[1016mm]
Rail Panel
42”[1067mm]
InstalledPanelHeight
45-1/2”[1156mm]
RequiredPost
32-1/2”[826mm] 39-1/2”[1003.5mm]36”[914.5mm]
2”[51mm]OverThePost(OTP)Conguraons
Al
13
HOME
Panel Height
40”[1016mm]
Rail Panel
42”[1067mm]
InstalledPanelHeight
42”[1067mm]
RequiredPost
32-1/2”[826mm] 36”[914.5mm]36”[914.5mm]
*Installed heights include a 3-1/2” [89mm] for the 32-1/2” [825.5mm] panel & 2” [51mm] for the 40”
[1016mm] panel space between deck surface and bottom edge of bottom rail.
6
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
FullGlassPanelSizeChart
12.25”
[838mmx311mm]
18.25”
[838mmx464mm]
24.25”
[838mmx616mm]
31.25”
[838mmx794mm]
36.25”
[838mmx921mm]
41.25”
[838mmx1048mm]
46.25”
[838mmx1175mm]
51.25”
[838mmx1302mm]
56.25”
[838mmx1429mm]
61.25”
[838mmx1556mm]
18”to23”
[457mmto584mm]
24”to29”
[610mmto584mm]
30”to35”
[762mmto889mm]
37”to42”
[940mmto1067mm]
42”to47”
[1067mmto1194mm]
47”to52”
[1194mmto1321mm]
52”to57”
[1321mmto1448mm]
57”to62”
[1448mmto1575mm]
62”to67”
[1575mmto1702mm]
67”to72”
[1702mmto1829mm]
15”to20”
[381mmx508mm]
21”to26”
[533mmx660mm]
27”to32”
[686mmx813mm]
34”to39”
[868mmx991mm]
39”to44”
[991mmx1118mm]
44”to49”
[1118mmx1245mm]
49”to54”
[1245mmx1372mm]
54”to59”
[1372mmx1499mm]
59”to64”
[1499mmx1626mm]
64”to69”
[1626mmx1753mm]
Glass Widths 3” [76mm] Post
O.C. Spacing
Between Post
Spacing
32 1/2” [825.5mm] & 40” [1016mm] Panels
17”to22”
[432mmto559mm]
2” [51mm] Post
O.C. Spacing
23”to28”
[584mmto711mm]
29”to34”
[736.5mmto863.5mm]
36”to41”
[914.5mmto1041.5mm]
41”to46”
[1041.5mmto1168.5mm]
46”to51”
[1168.5mmto1295.5mm]
51”to56”
[1295.4mmto1422.4mm]
56”to61”
[1422.4mmto1549.4mm]
61”to66”
[1549.4mmto1676.4mm]
66”to71”
[1676.4mmto1803.4mm]
Note:
321/2”[825.5mm]panelusesa31-1/2”[800mm]tallpieceofglass
anda40”[1016mm]panelusesa39”[990.5mm]tallpieceofglass.
Step 1: Install Wood Blocks
1. InstallWoodBlocklevelwithtopofjoist.AsshowninFig.1(A)
2. SecureWoodBlocktoblockingonallfoursideswith#10X
3-1/2”[89mm]deckscrews.
POST MOUNTING
*IfusingFortressEvoluonFraming,contactFortressforinstrucons.
Note:
Its recommended to install brackets into post before post
mounng. Reference page 9 for bracket Installaon steps.
7
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
WoodBlockmustbeconstructedwithtreateddimensional
lumberwithaminimumthicknessof11/2”[38mm].
Step 3: Max Post Spacing
68-1/2”[1740mm]AL13HOMERailsmaximumpost
spacingis68-3/4”[1746mm].
Note:
Do not exceed the maximum post spacing.
Fig. 1
#10x3-1/3”
[84.5mm]
(A)
(A)
Joist
Blocking
Step 2: Posion Base Plate
1. PosiontheedgeofAL
13
HOME base plate a minimum
of½”[12.5mm]fromtheinsideedgeofrimjoist.
AsshowninFig.1.
Fig. 1
1/2”[12.5mm]
1/2”
[12.5mm]
8
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Step 5: Check Mounted Posts
1. Shimpostasneededtoensurepostislevel.
Step 4: Mount Posts
1. Markmounngholelocaonsandpre-drilla3/8”[9.5mm]
hole.
2. Insert3/8”x3-1/2”[9.5mmx89mm]HexHeadgalvanized
boltsthrough3/8”[9.5mm]galvanizedwasherandpost
baseplate.
Note:
PostBasePlateholesMUSTbeposionedaminimum½”
[12.5mm]fromedgeofdeckboard.
Useonly3/8”[9.5mm]HexHeadGalvanizedBolts.Lag
ScrewsshouldNOTbeused.Secureeachpostwithfourbolts.
Fig. 1
6’panelmaximumpostspacingis69-1/4”
[1759mm]
Fig. 1 Fig. 2
OTP and Proud Post: Max Post Spacing
• 8’ panel maximum post spacing is 93-7/8”.
• 6’ panel maximum post spacing is 69-7/8”.
Note: Do not exceed the maximum post spacing.
8’ Panel max post spacing 93-7/8”
6’ Panel max post spacing 69-7/8”
OTP and Proud Post: Measuring The Panel Opening Length
• Measure the distance of the panel opening.
• Measure from the back wall of the bracket to the back wall of the bracket on other post.
• Confirm that the measurements for the top brackets are the same as the bottom brackets.
Measure the panel opening
Not here
Measure from
back of bracket
Check measurement with top
3/12
OTP and Proud Post: Max Post Spacing
• 8’ panel maximum post spacing is 93-7/8”.
• 6’ panel maximum post spacing is 69-7/8”.
Note: Do not exceed the maximum post spacing.
8’ Panel max post spacing 93-7/8”
6’ Panel max post spacing 69-7/8”
OTP and Proud Post: Measuring The Panel Opening Length
• Measure the distance of the panel opening.
• Measure from the back wall of the bracket to the back wall of the bracket on other post.
• Confirm that the measurements for the top brackets are the same as the bottom brackets.
Measure the panel opening
Not here
Measure from
back of bracket
Check measurement with top
3/12
9
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Step 1: Mark Bracket Hole Locaons
1. Markthecenterlineofeachpostwithapencil.
2. TakemeasurementsusedinFig.1and2tomarkboom
andtopbracketholelocaonsontoposts.
BRACKET INSTALLATION
Fig. 1
Bracket Hole Locaons
Pre-drill Dimensions: Pre-drillingwitha3/16”[4.5mm]drillbitisrequired
4”[101.5mm]
A*
3/8”[10mm]
B
3/8”[10mm]
35-3/16”[894mm]
C
411/4”[1048mm]
11/16”[17mm]
D
*DimensionAposionsboomedgeofrail(1) 3-1/2”[89mm]and(2) 2”[51mm]
abovedecksurface.
*DimensionAismeasuredfromtheboomsurfaceofpostbase.
2-1/2”[63.5mm]
11/16”[17mm]
32-1/2” [825.5mm] Panel
40” [1016mm] Panel
Fig. 2
B
C
B
A
B
D
(1)
(2)
Fig. 1
Fig. 2
Shim post as needed to
ensure post is level
Deck Board
RimJoist
Joist/Blocking
Wood Block
1/2”
[12.5
mm]
A
10
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Fig. 1 Fig. 2
Fig. 3
Step 2: Pre-Drill and Install Brackets
Tip:
Its important to double check dimensions to conrm
accuracy of bracket hole locaons before drilling.
1. UseSpringPunchtomarktheholes.AsshowninFig.1.
2. Pre-drillbracketholeswitha3/16”[89.5mm]drillbit.As
showninFig.2.
3. AachBrackettothepostswithsupplied
T-25thread-cungscrews.Usetwoscrewsperbracket.
Uselowspeedsengondrill.AsshowninFig.3.
4. Oncetopandboombracketsareinstalled,remeasure
bracketspacingtoconrmdimensionsusedinFig.2and3
ofstep1.AsshowninFig.4.
5. R e m o v e a l l m e t a l s h a v i n g s f r o m d e c k , p o s t b a s e c o v e r, 
post,andpanelbeforebracketisscrewedtopostto
preventcorrosion.
11
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Fig. 4
Step 3: Measure The Panel Opening Length
1. Measurethedistanceofthepanelopening.
AsshowninFig.1.
2. Conrmthatthemeasurementsforthetopbracketsarethe
sameastheboombrackets.
Note:
Measure from the back wall of the bracket to the back wall
of the bracket on other post. As shown in Fig. 2.
CUTTING DOWN BOTTOM AND TOP RAILS
Step 1: Measure & Mark Rails Where Cuts Will Be Made
1. Takemeasurementsfoundonpage11,step3ofBracket
Installaonandmarktheselocaonswithapencilonthe
topandboomrail.
Fig. 1
Fig. 2
Measure the panel opening
Checkmeasurementwithtop
Do not
measure from
post
Measure
from back
of bracket
12
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Fig. 1
Step 2: Cut & Clean Rails
1. Cutrailsusingasawwithanetoothcarbidecungblade.
2. Useletosmoothcutedges.
3. Removeanymetalshavingsanddustwithabrushorrag.
4. Makesuresurfacestobepaintedareclean.
4”[101.5mm]max
spacing on each side
Step 3: Apply Spray Paint To Cut Areas
1. Usingapieceofcardboardasamask,applythe1
st
coat of
Fortresszincbasedtouch-uppaint.
2. Allowtodrybeforeapplyingsecondcoat.
3. Applythe2
nd
coatofFortresszincbasedtouch-uppaint.
4. Allowtodryandinstall.
Tip:
Beforecungrails,conrmFullGlassPanelspacing.
Thespacebetweenglassandpostshouldnotexceed4”
[101.5mm]oneachside.AsshowninFig.1.
Totalpanelopeninglengthshouldbeglasswidthplus8”
[203mm]max.
Fig. 1
Fig. 2
Fig. 3
13
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
1. Measureandlocatethecenteroftheboomrail.Usingthe
I-Supportasaguide,markthecenterofthe2screwholes.
AsshowninFig.1.
2. Usinga3/16”[4.5mm]drillbit,drillthoughtheoutsidewall.
3. InstalltheI-SupportwiththeprovidedPhillipsHeadthread
cungscrews.AsshowninFig.2.
Note:
BesuretoinstallI-Supportonsideofrailfacingdeck.
FULL GLASS PANEL INSTALLATION
Step 1: Install I-Support On Boom Rail
Fig. 1
2X
Fig. 1
3/16”
[4.5mm]
Hole
Fig. 2
Phillips
Head
Thread
Cung
Screws
1. Install cut boomrailintothelowerinstalledbrackets.
2. Pre-drillBracket Cup holesforscrewsusinga3/16”
[89.5mm]drillbit.
3. SecurerailtoBracketCupswithprovidedT-25Drive
Thread-CungScrews.Uselowspeedsengondrill.
Step 2: Install Boom Rail
14
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Fig. 1
Straight
Bracket
Cup
Al
13
HOMEVercalCable/
PureViewI-Support
Straight
Bracket
Cup
Fig. 2
Step 3: Install Full Glass Into Boom Rail
1. Carefullyposionfullglasssheetintothecenterofthe
boomrail.AsshowninFig.1.
2. I n s e r t s p a c e r s o n e i t h e r s i d e o f t h e g l a s s i n t h e b o o m 
rail.Spacerwillbeushwiththesideoftheglass.
AsshowninFig.2.
Tip:
Besuretowearsafetygloves&glasseswhenhandling
glass.
Set
Screw
Tip:
It is recommended to apply a small amount of liquid soap
totheblackgasketopeningsinthetopandboomrails
beforeinstallingFullGlass.AsshowninFig.3.TheLiquid
Soaphelpstheglassseleinplace.
Fig. 3
15
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Fig. 1
PureViewFullGlass
Fig. 2
Glass
Spacer
Step 4: Install Top Rail
1. CarefullyslipTopRailoverthetopoftheglassintothetop
BracketCups.
2. Usearubbermalletandawoodblocktodrivethetoprail
ontotheglass.AsshowninFig.2.
3. Pre-drillBracket Cup holesforscrewsusinga3/16”
[89.5mm]drillbit.
4. SecuretoprailtoBracketCupswithprovidedT-25Drive
Thread-CungScrews.Uselowspeedsengondrill.
BoomRail
Gasket
Fig. 1
TopRail
Fig. 2
16
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Step 5: Install Top Rail (Alternave)
1. CarefullyslipTopRailoverthetopoftheglassintothetop
BracketCups.
2. Carefully slip RatchetStraps over top rail and underneath
boomrail.
3. SlowlyclampeachStrapunlglassisfullyseatedintoprail.
AsshowninFig.1.
4. Pre-drillBracket Cup holesforscrewsusinga3/16”
[89.5mm]drillbit.
5. SecuretoprailtoBracketCupswithprovidedT-25Drive
Thread-CungScrews.Uselowspeedsengondrill.
Step 6: Aach I-Support To Deck
1. FastenI-SupporttodecksurfacewiththesuppliedPhillips
HeadWoodScrew.
Tip:
Pre-drillwitha1/16”[1.5mm]drillbit.
Fig. 1
Fig. 1
PureView
Full Glass
RatchetStraps
17
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
PROUD POST: ROUND ACCENT TOP RAIL (ATR)
Step 1: Round ATR Spacers
1. AachSpacersusingprovidedself-drillingscrewswitha
5/16”[8mm]nutdriver,twoscrewsperspacer.Asshownin
Fig.2.
TheAccentTopRailKitcomeswith6spacersinthe69.89”
[1775mm]kit.
Thespacersshouldbeequallyspacedalongthelength
oftherail,withnomorethen14”[279.5mm]spacing
betweenthem.AsshowninFig.1.
Theendspacersshouldbeplacedasclosetotheend
bracketsaspossible.
Note:
DO NOT REMOVE BACKING OF DOUBLE SIDED TAPE UNTIL
YOU ARE READY TO PERMANENTLY ATTACH THE ATR.
Fig. 1
Double Sided
Tape
Fig. 2
14”[355.5mm]
Max
SpacerAached
NextToBracket
18
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Step 2: Round ATR Line & End
1. Measurethedistancefromtheinsideedgeofthe2posts.
2. CuttheATRtomeasuredlength.
3. WhentestngtheATR,placeitontopofthespacers.
DonotpresstheATRdownoverthespacers.Removingthe
ATRfromthespacerscandamagetheATRandspacers.As
showninFig.2.
4. Removethebackingofallofthedouble-sidedtapeonthe
ATRspacers.
5. ARubberMalletmightneedtobeusedtoinstall.Ifusinga
RubberMallet,useaclothtoprotecttheATRfromdamage.
Fig. 1
PROUD POST: FLAT ACCENT TOP RAIL (ATR)
Step 1: Flat ATR Spacers
1. MeasuredistancebetweenbracketsandcutATRSpacerto
length.TheSpacercanbe1/4”[6.5mm]shorterthanthe
distancebetweenbrackets.
Fig. 2
ATRShouldNotGoPastThis
PointWhenTestFing
19
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
1. MeasuredistancebetweenbracketsandcutATRSpacerto
length.TheSpacercanbe1/4”[6.5mm]shorterthanthe
distancebetweenbrackets.
2. Ifoneofthescrewholeswascutoduringthesizingofthe
ATRSpacer,usea5/8”[16mm]drillbittoaddanotherhole
1”fromtheendoftheATRSpacer.
3. AachtheATRSpacerusingtheprovidedself-drilling
screwswitha5/16”[8mm]nutdriver.
4. Allscrewholesmusthaveascrewinstalled.
Note:
Flat ATR uses a full length ATR spacer.
DO NOT REMOVE BACKING OF DOUBLE SIDED TAPE UNTIL
YOU ARE READY TO PERMANENTLY ATTACH THE ATR.
Fig. 1
Step 2: Flat ATR Line And End
ReferenceProudPostRoundATRLine&Endinstruconson
page18.
Double Sided
Tape
Fig. 2
20
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
OVER THE POST: ROUND ACCENT TOP RAIL (ATR)
Step 1: Round ATR Spacers
1. Aachspacersusingprovidedself-drillingscrewswitha
5/16”[8mm]nutdriver,twoscrewsperspacer.Asshownin
Fig.2.
TheAccentTopRailKitcomeswith6spacersinthe69-7/8”
[1775mm]kit.
Thespacersshouldbeequallyspacedalongthelength
oftherail,withnomorethen14”[279.5mm]spacing
betweenthem.AsshowninFig.1.
Theendspacersshouldbeplacedasclosetotheend
bracketsaspossible.
Note:
DO NOT REMOVE BACKING OF DOUBLE SIDED TAPE UNTIL
YOU ARE READY TO PERMANENTLY ATTACH THE ATR.
Double Sided
Tape
Fig. 2
Fig. 1
SpacerAached
NextToBracket
14”[279.5mm]
Max
/