Kichler Lighting 2999NBR, 2999AP, 2999BK, 2999CH, 2999CLP, 2999DBK, 2999NI, 2999OZ, 2999PN Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Kichler Lighting 2999NBR Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1) Pass fixture wire from top of fixture body through stem.
Screw stem to top of fixture body. NOTE: Thread locking
compound must be applied to all stem threads as noted
with symbol (3) to prevent accidental rotation of fixture
during cleaning, relamping, etc.
2) Pass fixture wire through each remaining stem and screw
stems together.
3) Refer to fixture installation instructions to complete installation.
1) Pase el alambre del artefacto a través del vástago y atornille
el vástago al tope del artefacto. NOTA: El compuesto para
rosca estanca se debe aplicar a todas las roscas del
vástago como se notó con el símbolo (3) para impedir la
rotación accidental del artefacto durante la limpieza,
instalación de una bombilla nueva, etc.
2) Pase el alambre del artefacto a través de los vástagos
restantes y atornille los stagos juntos.
3) Consulte las instrucciones de instalación de artefacto para
completar la instalación.
1) Passez le fil dans la tige et vissez la tige en haut du corps du
luminaire.
REMARQUE: Appliquer le frein filet sur tous les filets de la
tige indiqués par le symbole (3) pour empêcher la rotation
accidentelle du luminaire pendant le nettoyage, remplacement
de lampe, etc.
2) Passez le fil dans les tiges restantes et vissez les tiges
ensemble.
3) Référer aux instructions d’installation de luminaires pour
compléter l’installation.
Date Issued: 5/30/14
IS-2999-BL
STEM
VARILLA
TIGE
3
Were here to help 866-558-5706
Hrs: M-F 9am to 5pm EST
3
3
3
3
FIXTURE BODY
CUERPO DEL ARTEFACTO
CORPS DU LUMINAIRE
/