KitchenAid KDDD 6010 Installation guide

Type
Installation guide

KitchenAid KDDD 6010 makes it easy to create a stylish and functional integrated look for your kitchen. Designed to match the aesthetic of your cabinetry, it seamlessly blends with your existing décor.

KitchenAid KDDD 6010 makes it easy to create a stylish and functional integrated look for your kitchen. Designed to match the aesthetic of your cabinetry, it seamlessly blends with your existing décor.

KDDD 6010
Assembly instructions
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 1
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 2
Before you start 4
Width of all panels 5
Height of upper panel 5
Height of lower panel 5
Important 6
Toe Kick preparation 7
Width of Toe Kick Panel 7
Height of Toe Kick Panel 7
Parts supplied 8
Tools needed 8
Panel preparation instructions 9
Step 1: badge and handle position 9
Step 2: badge cut-out & bracket removal 10
Step 3: fitting the handle and badge 11
Step 4: securing the mounting brackets 12
Step 5: securing the Toe Kick Panel 13
Step 6: earthing the mounting brackets and connecting
the badge wires 13
Step 7: fitting the panels to the product 14
Customer care 14
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 3
PLEASE NOTE: Your model of may different from the model shown in the diagrams. Diagrams
have been simplified to enable clearer instruction.
FOLLOW THESE INSTRUCTIONS BEFORE REFERRING TO PRODUCT INSTALLATION
INSTRUCTION SHEET P/N 526609.
The Door and toe Kick Panels of the can be made to match your kitchen cabinetry. This
diagram, with the addition of your own measurements will help you calculate the required panel sizes.
CABINETRY ALIGNMENT
The following calculations assume:
The top of the Upper Panel is to be aligned with the top of the adjacent cabinetry. The final
panel/cabinetry alignment is achieved by adjusting the ’s feet.
R
R
R
Before you start
5mm
MIN.
819,5 - 879,5mm
735mm
open
Height of
2,5mm
MINIMUM
CLEARANCE
Width of ALL the Panels.
Bench Top
Adjacent
Cabinetry
Upper Panel
Lower Panel
12mm
MINIMUM CLEARANCE
Toe Kick Panel
Height of Toe
Kick Panel
Height
of Upper
Panel
Bottom of
adjacent
door
8mm
AIR GAP
Side View of
Front View of
Top of door must not
overlap cabinetry
R
2mm Tabs
5mm
MINIMUM
CLEARANCE
Height
of Lower
Panel
AIR FLOW
AIR FLOW
2,5mm
MINIMUM
CLEARANCE
5mm
MINIMUM
CLEARANCE
Bench Top
4
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 4
Measure A the width between adjacent door7drawer fronts and write it in the first box below, then
complete the equation.
For example:
Width of all panels
2x
(2,5mm MIN)
door clearance width of all panels
600mm
2,5mm
595mm
2 X
door clearance
width of all panels
5
For example:
Height of upper panel
398mm
(0mm recommended)
standard height
398mm
0mm
398mm
height of upper panel
door extension
standard height
height of upper panel
door extension
Measure C door/drawer (or equivalent) and write it in the first box below, then complete the equation.
For example:
Note: The “Door ExtensionB allows for the top of the Upper Panel to be above the where required.
WARNING
The air vent between the Upper and Lower Panels must not be covered. An air gap of 8 mm MUST
be provided.
R
Height of lower panel
8mm
(311,5mm MIN)
MIN 717,5mm +
398mm717,5mm
311,5mm
8mm
height of upper panel
air gap
height of lower panel
height of upper panel
air gap
height of lower panel
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 5
INTEGRATED PANEL THICKNESS
Upper and Lower Panel minimum thickness is 16 mm. Panel thickness above 18 mm can be
accommodated but product depth will increase accordingly.
INTEGRATED PANEL MATERIAL
Drawer Front material must be suitable for damp conditions (50°c @ 80% RH) and adequately sealed to
withstand moisture.
Additional protection can be provided by using a “Moisture Resistant Board”. Taping edges alone may not
provide adequate sealing. For painted panels, radius all rear edges to improve sealing.
ENSURE THE PRODUCT IS NOT PLUGGED IN.
IMPORTANT: The installation of the Panels requires an electrical connection and must be
performed by a suitably qualified person.
Important
6
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 6
TOE KICK OPTIONS
A) The Prefinished Toe Kick is supplied. Refer to Installation
Instructions for preparation.
B) The Black Prefinished Toe Kick can also have a front panel of your
choice attached to it using screws or an adhesive.
C) A Toe Kick panel of any material with thickness from 9-19 mm can
be screwed to a plastic Mounting Bracket (supplied).
TOE KICK PANEL INSTALLATION DEPTH
When using a rectangular Toe Kick, the maximum depth, excluding
the Toe Kick Panel is 67 mm.
To move the Toe Kick deeper the Toe Kick Panel must have the
profile shown in the diagram below cut out of it. The maximum Toe
Kick depth with the cut out excluding the Toe Kick Panel is 127 mm.
Toe Kick preparation
Toe Kick Panel
Refer to “Width of All Panels” on page 5.
Width of Toe Kick Panel
7
Height of Toe Kick Panel
[Door Extension]
[
dimension]
[MIN
clearance]
[height of Toe
Kick Panel
MIN 70,5mm]
817,5mm
0mm
735mm 12mm
70,5mm
735mm
12mm
MIN 70,5mm
Refer to the diagram on page 1. Measure D the height from the top of the adjacent cabinet door fronts to
the floor and write it in the first box below, the complete the equation. For example:
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 7
Parts supplied
Door Front Seal (2)
p.n. 526466
Mounting Bracket (2)
(Upper and lower)
p.n. 526440 e 526441
Integrated Rectangular Badge (2)
(Satin Chrome supplied)
p.n. 526975
Other Badges Available
Rectangular:
Bright Chrome Kit p.n. 527276
Brass Kit p.n. 527277
Eliptical:
Black Kit p.n. 526683
Satin Chrome Kit p.n. 526684
Bright Chrome Kit p.n. 527156
Brass Kit p.n. 526685
Toe Kick Bracket (1)
p.n. 526682
INTEGRATED
PANEL
PREPARATION
BOOKLET
INTEGRATED PARTS KIT part no. 526675
Panel
Preparation
Booklet (1)
Panel
Mounting
Screws (12)
Toe Kick
Mounting
Screws (5
)
Safety Glasses, Tape Measure, Pencil, Needle-nose Pliers, Drill & Phillips Bit or Phillips Screwdriver, Ø 25
mm Boring Bit or Ø 25 mm Hole Saw, Small Hand or Jig Saw.
Tools needed
8
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 8
READ THESE INSTRUCTIONS COMPLETELY AND CAREFULLY.
Panel preparation instructions
9
BADGE AND HANDLE POSITIONS
On both Panels, select the Badge position to suit the cabinetry design, within the available badge zones.
The Badge may be centred on the edge of the badge zone.
The handle position will also need to be taken into account.
Step 1: badge and handle position
Available
Badge
Zone
228,5mm
228,5mm
Badge
Allow for
Handle
127mm
127mm
54mm
211mm
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 9
BADGE CUT-OUT
Cut the badge slot in each Panel by drilling two 25
mm diameter holes and cutting out the remaining
material between the holes. A hole centre to hole
centre template is provided on the Mounting
Bracket.
WARNING
Accuracy is essential when cutting the Badge
slot to ensure a neat fit to hold the Badge.
WARNING
Ensure the product is not plugged in.
REMOVING THE BRACKET
1 To remove the Mounting Brackets with draw
the pins from the Drawer sides, using a pair of
needle-nose pliers.
2 Gently slide the Mounting Bracket off in a
downwards and outwards motion. Disconnect
the Mounting Bracket and Badge earthing wires,
also unplug the Badge harness from the Badge
Isolator box. Remove the Badge from the
Mounting Bracket.
NOTE: The four 3.3 mm holes on the perimeter of
the rectangular recess in the Mounting Bracket can
also be used to define the badge zone.
Step 2: badge cut-out & bracket removal
Badge
Outline
Ø 25mm ± 0,25mm
30mm ± 0,5mm
10
Badge Zone
1
1
2
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 10
FITTING THE HANDLES
Fit the customer supplied handles.
WARNING
When mounting the handles, ensure fastenings do not
protrude beyond the back surface of the Panels.
FITTING THE BADGES
Fit a badge to each Panel by feeding the wires through to the back
and pressing the Badge into the cut out. If needed adhere the Badge
to the Panel with an adhesive.
Feed the Badge wires through the slot in the Mounting Bracket. As
the Mounting Bracket is placed on the rear of the Panel the excess
wire must be pulled through.
Step 3: fitting the handle and badge
11
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 11
Each Mounting Bracket is directly screwed to the
back of each Integrated Panel. On a soft surface
centralise and align the Upper Mounting Bracket on
the upper Panel and the Lower Mounting Bracket
on the Lower Panel.
WARNING
For some materials pilot holes may need to
be drilled first before screwing the Mounting
Bracket onto the Panel. Ensure the drill does
not damage the face of the Panel.
WARNING
The mounting bracket must not be modified
in any way. It is designed to hold the door
front in the correct position to allow venting.
WARNING
The top door front must not extend beyond
the bottom of the mounting bracket. Drying
problems and moisture damage may
otherwise occur.
IMPORTANT
Break off the tab at the top of the Lower Mounting
Bracket, after Panel has been secured.
Using 6 of the 16 mm screws supplied, secure the
Mounting Bracket to each Panel at the 6 points
shown in the diagram.
NOTE: The Mounting Brackets need to be securely
fixed to each Panel. Where possible use the 6 outer
slots shown above. If these slots can not be used,
select alternative slots, as close as possible to the
outer slots. Ensure the screws are evenly spaced
about the Panel.
Step 4: securing the mounting brackets
UPPER
MOUNTING BRACKET
ENSURE
BRACKETS
ARE ALIGNED
OVER PANEL
EDGES
LOWER
MOUNTING BRACKET
REMOVE LOWER MOUNTING BRACKET TAB
SLOTS
SLOTS
CENTRE
MARKS
CENTRE
LINE
CENTRE
MARKS
12
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 12
NOTE: If using the supplied Black Prefinished Toe
Kick, proceed to Step 6 Earthing the Mounting
Brackets and Connecting the Badge Wires.
Place Toe Kick Panel face down on a soft surface
and mark a vertical center line.
Centralise the plastic Mounting Bracket on top of
the Toe Kick Panel.
Align the top of the Bracket with the top of the
Panel.
Using 5 of the 16 mm screws provided fix the
Mounting Bracket to the Toe Kick Panel.
Step 5: securing the Toe Kick Panel
Screw
Holes (5)
Toe Kick
Panel
TOP
Toe Kick
Mounting
Bracket
13
WARNING
Ensure the Product is not plugged in.
1 Plug the green Badge earthing wire onto a
Mounting Bracket tab. Plug the earthing wire
from the Product onto the other Mounting
Bracket tab.
2 Connect the Badge plug to the top of the Badge
Isolator Box.
WARNING
The Badge Isolator Board is an electrostatic
sensitive device. Ensure you are adequately
earthed when connecting the Badge by
wearing an earthing strap or by earthing
yourself to the .
R
Step 6: earthing the mounting brackets and connecting the
badge wires
2
1
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 13
1 Fit the assembled panels by sliding in an inwards
and upwards motion. The rubber seal between
the Drawer and Panels must be kept in place.
2 Secure the panels by inserting the pins
on either side of the Drawer. Ensure
that the rib on the pin is vertical.
NOTE: Do not fit the Toe Kick Panel (or supplied
Black Prefinished Toe Kick) to the until
the Product is in the cavity.
WARNING
The gap between doors must be 8 mm or
drying problems and moisture damage may
occur.
INTEGRATED PANEL PREPARATION IS
COMPLETE.
The product is now ready to install. refer to
product Installation Intruction Sheet P/N 526609.
R
Step 7: fitting the panels to the product
1
2
2
14
If you have any questions concerning the installation of this , please see your Use Guide or
Warranty information for contact details.
R
Customer care
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 14
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 15
5019 106 00865
Printed in Italy
n
05/07
GB
5019_106_00865_FLYER_GB 30-05-2007 13:57 Pagina 16
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16

KitchenAid KDDD 6010 Installation guide

Type
Installation guide

KitchenAid KDDD 6010 makes it easy to create a stylish and functional integrated look for your kitchen. Designed to match the aesthetic of your cabinetry, it seamlessly blends with your existing décor.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI