Elizabethan Classics ECTW19 PB Installation guide

Type
Installation guide

This manual is also suitable for

Assembly Instructions for 2V4X and SE3
NOTE: WRAP AT LEAST 3 LAYERS OF TEFLON TAPE ON ALL THREADED CONNECTIONS
1. Faucet installation: Insert the faucet through the two holes in the tub. Thread the Lock
nuts onto the threaded shanks and tighten.
2. Connect the supply lines (sold separately) to the threaded shanks using the brass nuts
and washers provided with the supply lines, or provided with the faucet.
OVERTIGHTEN.
TWO PEOPLE ARE RECOMMENDED TO COMPLETE FOLLOWING STEPS:
3. Screw the 12" riser (D) into the bottom of tub filler and the long riser into the top of tub
filler.
4. Remove the nut and cone washer from the faucet's riser joint and slide the unthreaded
end of the 12" riser into the riser joint on the top of the faucet. Secure the riser by
tightening the brass nut (C).
5. Screw the shower valve onto the 36" riser. BE SURE THAT THE SHOWER VALVE IS
IN THE CORRECT POSITION ( THE CARTRIDGE WILL BE VISIBLE FROM THE TOP
SIDE OF SHOWER VALVE). See illustration.
6. Slide the shower riser connector (G)onto the shower riser (F) approximately 10 inches
below the top of the bend in the shower riser. Only tighten this joint slightly because this
may require adjustment later. Connect the shower riser (F) to the shower valve.
NOTE: WHEN POSITIONING THE SHOWER VALVE AND TUB FILLER DO NOT OVER
TIGHTEN. THE CONNECTIONS ARE NOT UNDER WATER PRESSURE, THEREFORE,
IT IS OK IF THE VALVES HAVE TO BE "BACKED OFF" TO PROPERLY POSITION THEM.
7. Measure the distance from the shower enclosure to the wall. Cut the unthreaded end of the
wall brace to the desired length.
8. Connect the escutcheon plate to the wall brace and secure by tightening the screw.
Thread the wall brace to the shower riser connector . Attach the escutcheon plate to the
wall using the screws and anchors provided.
9. Slide the shower enclosures into the shower riser connector and shower enclosure
connector, and secure with screws provided.
10.Measure the distance from the shower enclosure to the ceiling. Cut the unthreaded end
of ceiling brace to the desired length.
11.Connect the escutcheon plate to the ceiling brace and secure by tightening the screw.
Thread the ceiling brace to the shower enclosure connector. Attach the escutcheon
plate to the ceiling using the screws and anchors provided.
12.Connect the shower head to the shower riser.
CAUTION: DO NOT
Assembly Instructions for Handles
Lever Handles:
1. Be sure that the broach screws are tightened installing the lever handles.
2. Install the lever handles on the broaches and tighten the set screws using the allen
wrench provided.
before
Cross Handles:
1. Remove the screws from the top of the broaches.
2. Remove the insert caps from the cross handles.
3. Put the cross handles on the broaches and then tighten the screws. Insert the caps on the
cross handles.
Broach
Broach
Screw
Set
Screw
Allen
Wrench
F (Shower Riser)
Escutcheon Plate
Escutcheon Plate
Wall Brace
(12" Long)
G (Shower Riser Connector)
Ceiling Brace
(36" Long)
H (Shower Enclosure
Connector)
Shower Valve
Cartridge
Tub Filler
D (Small Riser)
(12" Long)
E (Long Riser)
(36" Long)
Shower Enclosure
C(Brass Nut)
B(Brass Nut)
A (Lock Nut)
Washer
Rev.D
Elizabethan
Classics
R
CAUTION: DO NOT OVER TIGHTEN NUTS - THIS CAN LEAD TO
STRIPPING OR CRACKING AND WILL VOID YOUR WARRANTY.
AND SCREWS
NOTE: TO BE INSTALLED ONLY BY QUALIFIED, LICENSED PLUMBER
TW17-19
Assembly Instructions for 2V4X and SE3L
NOTE: WRAP AT LEAST 3 LAYERS OF TEFLON TAPE ON ALL THREADED CONNECTIONS
1. Faucet installation: Insert the faucet through the two holes in the tub. Thread the Lock
nuts onto the threaded shanks and tighten.
2. Connect the supply lines (sold separately) to the threaded shanks using the brass nuts
and washers provided with the supply lines, or provided with the faucet.
CAUTION: DO NOT OVERTIGHTEN.
TWO PEOPLE ARE RECOMMENDED TO COMPLETE FOLLOWING STEPS:
3. Build up shower enclosure as per illustration A.
4. Screw the 12" riser (D) into the bottom of tub filler and the long riser into the top of tub
filler.
5. Remove the nut and cone washer from the faucet's riser joint and slide the unthreaded
end of the 12" riser into the riser joint on the top of the faucet. Secure the riser by
tightening the brass nut (C).
6. Screw the shower valve onto the 36" riser. BE SURE THAT THE SHOWER VALVE IS
IN THE CORRECT POSITION ( THE CARTRIDGE WILL BE VISIBLE FROM THE TOP
SIDE OF SHOWER VALVE). See illustration.
7. Slide the shower riser connector (G)onto the shower riser (F) approximately 10 inches
below the top of the bend in the shower riser. Only tighten this joint slightly because this
may require adjustment later. Connect the shower riser (F) to the shower valve.
NOTE: WHEN POSITIONING THE SHOWER VALVE AND TUB FILLER DO NOT OVER
TIGHTEN. THE CONNECTIONS ARE NOT UNDER WATER PRESSURE, THEREFORE,
IT IS OK IF THE VALVES HAVE TO BE "BACKED OFF" TO PROPERLY POSITION THEM.
8. Measure the distance from the shower enclosure to the wall. Cut the unthreaded end of the
wall brace to the desired length.
9. Connect the escutcheon plate to the wall brace and secure by tightening the screw.
Thread the wall brace to the shower riser connector . Attach the escutcheon plate to the
wall using the screws and anchors provided.
10 Slide the shower enclosures into the shower riser connector and shower enclosure
connector, and secure with screws provided.
11.Measure the distance from the shower enclosure to the ceiling. Cut the unthreaded end
of ceiling brace to the desired length.
12.Connect the escutcheon plate to the ceiling brace and secure by tightening the screw.
Thread the ceiling brace to the shower enclosure connector. Attach the escutcheon
plate to the ceiling using the screws and anchors provided.
13Connect the shower head to the shower riser.
Assembly Instructions for Handles
Lever Handles:
1. Be sure that the broach screws are tightened installing the lever handles.
2. Install the lever handles on the broaches and tighten the set screws using the allen
wrench provided.
before
Cross Handles:
1. Remove the screws from the top of the broaches.
2. Remove the insert caps from the cross handles.
3. Put the cross handles on the broaches and then tighten the screws. Insert the caps on the
cross handles.
Broach
Broach
Screw
Set
Screw
Allen
Wrench
F (Shower Riser)
Escutcheon Plate
Escutcheon Plate
Wall Brace
(12" Long)
G (Shower Riser Connector)
Ceiling Brace
(36" Long)
H (Shower Enclosure
Connector)
Shower Valve
Cartridge
Tub Filler
D (Small Riser)
(12" Long)
E (Long Riser)
(36" Long)
C(Brass Nut)
B(Brass Nut)
A (Lock Nut)
Washer
A
Enclosure Tube
Sleeve
Extension Tube
Enclosure Tube
Extension Tube
Rev.D
Elizabethan
Classics
R
NOTE: TO BE INSTALLED ONLY BY QUALIFIED, LICENSED PLUMBER
CAUTION: DO NOT OVER TIGHTEN NUTS - THIS CAN LEAD TO
STRIPPING OR CRACKING AND WILL VOID YOUR WARRANTY.
AND SCREWS
  • Page 1 1
  • Page 2 2

Elizabethan Classics ECTW19 PB Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI