IMI Hydronic Engineering TV4-14 User manual

Type
User manual
SAFETY – INSPECTION – DISASSEMBLING – DISPOSAL prescriptions
Compresso
Transfero
Vento
Pleno
DML
Rell
SAFETY – INSPECTION
••••••Personnel
Installing and operating personnel must possess the appropriate knowledge and training. The operator is responsible
for the personal protective equipment of the personnel. At least safety glasses and safety shoes are required for repair
work, maintenance inspections and installation.
••••••Follow the instructions
Installation, operation, maintenance and disassembly must be carried out as stated and showed in the dierent instruction
manuals that are an integral part of the delivery and in accordance with best practice. In addition to the IMI Hydronic
Engineering instructions, additional instructions from other companies may be included for the components used (e.g.
backow preventers)
.
You must follow these instructions in the same way as the IMI Hydronic Engineering instructions.
If anything is unclear, please contact IMI Hydronic Engineering customer service.
••••••Tests before commissioning and periodic inspections
Test required before commissioning and periodic inspections must be performed according to the regulations in the
country where the device is installed and operated. The organization of the tests is the responsibility of the operator.
There are no standardised international regulations for the acceptance test prior to commissioning and periodic
inspections. According to the PED, it is usually the vessels that determine how the installation is classied.
These are CE type-tested in accordance with Pressure Equipment Directive PED/2014/68/EU. For periodic
inspections, openings are provided for ange-type or endoscope inspections.
Compresso, Transfero, Vento, Pleno control units (TecBox) are classied as electrical equipment. Regular tests must
be carried out at least every 4 years. Local regulations may demand shorter periods and must be observed.
In Switzerland, Compresso does not require authorisation from the SVTI if the installation is protected in such a way
that psCH is not exceeded. Vessels with psv x V up to 3000 bar*litres do not require inspection by the SVTI.
The following combinations with TecBox are recommended:
Primary vessel (2) TecBox safety valve (SV)
C 10 C15
1000 litres 3 bar on request
800 litres 3.75 bar on request
700 litres 4.2 bar on request
600 litres 5 bar on request
500 litres 6 bar 6 bar
300 litres 10 bar
For Transfero as many extension vessels as required can be connected to the primary vessel. The CE-approved 2 bar
safety valve protects the vessels from inadmissible pressures. In Switzerland, SVTI inspection is not required for these
types of vessels.
Backow preventer BA: Perform inspection and maintenance in accordance with EN 1717 and the rules in the operator’s
country. Functional testing, with documentation, must normally be carried out annually. Dirt trap (SF): Inspect and clean
if necessary after a drop in the water make-up capacity or before functional testing of the backow preventer BA. We
recommend including the Pleno P / P R / P CR / BA4R in the maintenance cycle of the connected pressure-maintaining or
degassing station. Follow the maintenance instructions for Rell softening modules. The Pleno P / P R / P CR / BA4R can
work as an accessory in systems requiring technical inspections (Compresso | Transfero) and can be included as part of
the inspection.
••••••Place of installation
The access to the place of installation must be restricted to trained and specialised personnel. The oor structure must
be able to support the maximum operating and installation conditions. Connections for electricity, communication,
mains water and waste water must correspond to the requirements of the device. The room must be thouroughly
ventilated. The surrounding atmosphere must not be explosive. The gases discharged by Vento and Transfero
through the degassing process may be ammable (CH4 / H2) and must be safely removed to the outside air. Do not
store ammable, explosive materials near the pressure vessel. Pressurized containers (eg Compresso expansion
vessels) must be protected against external re, at least according to national regulations.
Please note the geodetic height of the installation room: With Compresso, the pressure maintenance curve drops
by 0.1 bar per 1000 meters above sea level. Transfero must not be operated above 4000 m above sea level (risk of
cavitation)!
•••• •Water quality
IMI Hydronic Engineering devices are designed for pressure maintenance, degassing, make-up and/or water
treatment in closed heating, solar and cooling systems with water that contains no aggressive or toxic agents.The
entire system must be dimensioned and operated in such a way as to minimise the amount of oxygen admitted
through the make-up water or through permeable components. Water treatment systems are to be dimensioned,
installed and operated according to the current state of the art.
WXMOIN0001
06.2020
en
de
fr
nl
WTMOIN0005
02.2022
Transfero Connect
TV 4 - 14
INSTALL
www.imi-hydronic.com
2
1
2
2
1
3
Transfero TU/TUE Transfero TG/TGE
LT
TU Art.Nr. 7463011
LT
TG Art.Nr. 7463013
TU-E Art.Nr. 7463012
TG-E Art.Nr. 7463014
4
100 ≤ L ≤ 150
dHc (TG) > 500 mm
dHc (TU) > 200 mm
≥150 mm
≥ 400
TU/TG TUE/TGE
T.1: 1x230V, 10A
T.2: 1x230V, 16A
+5°C - +40°C
≥ 600
LL
dHc
5
BA
Transfero TU Transfero TUE
6
Transfero TG Transfero TG-E
BA
7
TV.1 E (C) (H)
1 A
1 B
Sin2 Sin1
Sout
Optional
Swm
TV_4 TV_6 TV_8 TV_10 TV_14
dpu min bar 1 1,5 2 3,5 5,5
dpu max bar 2,5 3,5 4,5 6,5 10
TV.1_E, TV.1_EC Sin1 Sin2 Sout Swm
Ts min °C 0 0 0
Ts max °C 70 70 65
TV.1_EH, TV.1_EHC Sin1 Sin2 Sout Swm
Ts min °C 0 5 0 0
Ts max °C 90 70 90 65
Pleno / Pleno Refill
TV.1 EH / TV.1 EHC
Pleno P BA4 R
Pleno P AB 5
Pleno P AB5 R + Pleno Refill
Pleno P BA4 R + Pleno Refill
TV 10/14
TU / TG TU..E / TG..E
M
M2
P1
Sin1 Sout Sin2
Statico SD/SU
DLV
TV 4_, TV 6_, TV 8_ : SD/SU ≥ 50 l
TV 10_, TV 14_ : SD/SU ≥ 80 l
Transfero TV.1 E(H)(C)
TecBox
V2
PT
SYS
PT
ECO
PT
W
LT
Swm
WM
V1
FL
FL
Sv
8
TV.2 E (C) (H)
1 A
1 B
Sin1 Sout
Sin2
Optional
Swm
TV_4 TV_6 TV_8 TV_10 TV_14
dpu min bar 1 1,5 2 3,5 5,5
dpu max bar 2,5 3,5 4,5 6,5 10
TV.2_EH, TV.2_EHC Sin1 Sin2 Sout Swm
Ts min °C 0 5 0 0
Ts max °C 90 70 90 65
Pleno / Pleno Refill
Pleno P BA4 R
Pleno P AB 5
Pleno P AB5 R + Pleno Refill
Pleno P BA4 R + Pleno Refill
TV 10/14
V2
PT
SYS
PT
ECO
PT
W
LT
M
Swm
WM
V1
FL
FL
M2
PRV1
P1 P2
Sin1 Sout Sin2
Statico SD/SU
DLV
TV 4_, TV 6_, TV 8_ : SD/SU ≥ 50 l
TV 10_, TV 14_ : SD/SU ≥ 80 l
Transfero TV.2 E(H)(C)
TecBox
TU / TG TU..E / TG..E
Sv
9
 tr≤70°C
TV.1 E + Pleno BA4 R
 tr≤70°C
TV.1E+PlenoAB5R+PlenoRell
tR
Q
psvs
Hs
t
P
ZUT
tmax
DSV...DGH
> 500 mm
Statico SD/SU
DLV
TU/TG
Sin1
Sout
Swm
Sv
DNe
Zeparo G Force
TV 4_, TV 6_, TV 8_ : SD/SU ≥ 50
TV 10_, TV 14_ : SD/SU ≥ 80
Transfero
Connect
TecBox
pw 2-10 bar
tw 5-65 °C
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
tR
Q
psvs
Hs
t
P
ZUT
tmax
DSV...DGH
> 500 mm
Statico SD/SU
DLV
TU/TG
Sin1Sout
Swm
Sv
DNe
Zeparo G Force
Transfero
Connect
TexBox
pw 2 - 8 bar
tw 5 - 30 °C
TV 4_, TV 6_, TV 8_ : SD/SU ≥ 50
TV 10_, TV 14_ : SD/SU ≥ 80
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
10
 70°C<tr≤90°C
TV.1EH/TV.2EH+PlenoPBA4R+PlenoRell
 tr≤70°C
TV.1EH/TV.2EH+PlenoAB5R+PlenoRell
tR
Q
psvs
Hs
t
P
ZUT
tmax
DSV...DGH
> 500 mm
TU/TG TUE/TGE
Statico SD/SU
DLV Sin1
Sout
Swm
Sv
Sin2
DNe
DNe
Zeparo G Force
TV 4_, TV 6_, TV 8_ : SD/SU ≥ 50
TV 10_, TV 14_ : SD/SU ≥ 80
Transfero
Connect
TecBox
pw 2-8 bar
tw 5-30 °C
DNd
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
> 500 mm
Statico SD/SU
DLV
DD/DU/DG
TU/TG TUE/TGE
Sin1Sout
Swm
Sv
Sin2
DNe
DNe
DNd
tR
Q
psvs
Hs
t
P
ZUT
tmax
DSV...DGH
Zeparo G Force
Transfero
Connect
TecBox
pw 2-8 bar
tw 5-30 °C
TV 4_, TV 6_, TV 8_ : SD/SU ≥ 50
TV 10_, TV 14_ : SD/SU ≥ 80
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
11
 5°C≤tr≤70°C
TV.1EC+PlenoAB4R+PlenoRell
 0°C≤tr≤5°C
TV.2 EHC + Pleno BA4 R
tR
Q
psvs
Hst
P
ZUT
tmax
DSV...DGH
> 500 mm
Statico SD/SU
DLV
TU/TG
Sin1Sout
Sv
DNe
Zeparo G Force
Transfero
Connect
TexBox
TV 4_, TV 6_, TV 8_ : SD/SU ≥ 50
TV 10_, TV 14_ : SD/SU ≥ 80
Swm
pw 2 - 8 bar
tw 5 - 30 °C
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
tR
Q
psvs
Hs
t
P
ZUT
tmax
DSV...DGH
> 500 mm
DNe
Statico
SD/SU
DLV
DD/DU/DG
TU/TG TUE/TGE
DNe
Sin2
Sin1
Sout
Swm
Sv
DNd
Zeparo G Force
TV 4_, TV 6_, TV 8_ : SD/SU ≥ 50
TV 10_, TV 14_ : SD/SU ≥ 80
Transfero
Connect
TecBox
pw 2-10 bar
tw 5-65 °C
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
12
 5°C≤tr≤70°C
TV.2EHC+PlenoAB5R+PlenoRell
tR
Q
svs
Hs
t
P
ZUT
tmax
DSV...DGH
> 500 mm
Statico SD/SU
DLV
TU/TG TUE/TGE
Sin1
Sout
Sv
DNe DNe
Zeparo G Force
Transfero
Connect
TexBox
Swm
pw 2 - 10 bar
tw 5 - 30 °C
DNd Sin2
TV 4_, TV 6_, TV 8_ : SD/SU ≥ 50
TV 10_, TV 14_ : SD/SU ≥ 80
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
DNe
13
DNe
TV_4.1
TV_4.1 H
TV_4.2 H
TV_6.1
TV_6.1 H
TV_6.2 H
TV_8.1
TV_8.1 H
TV_8.2 H
TV_10.1
TV_10.1 H
TV_10.2 H
TV_14.1
TV_14.1 H
TV_14.2 H
Length up
to approx.
5 m
DNe 25 32 32 25 32 50 | 40 25 32 50 | 40 25 40 | 32 50 | 40 25 32 50 | 40
Hst | mall allall allall < 18 |
≥ 18
allall < 27 |
≥ 27
all< 29 |
≥ 29
< 44 |
≥ 44
allall < 61 |
≥ 61
DNd 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
Hst | mall allall allall allall allall allall allall al
ll
Length up
to approx.
10 m
DNe 25 32 50 | 40 25 40 | 32 50 | 40 25 40 | 32 50 | 40 25 40 | 32 50 | 40 25 32 50 | 40
Hst | mall all <13 |
≥13
all< 23 |
≥ 23
< 25 |
≥ 25
all< 24 |
≥ 24
< 34 |
≥ 34
all< 40 |
≥ 40
< 52 |
≥ 52
allall < 80 |
≥ 80
DNd 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
Hst | mall allall allall allall allall allall all all al
ll
Length up
to approx.
30 m
DNe 32 40 50 32 50 | 40 65 | 50 32 50 | 40 65 | 50 32 50 | 40 65 | 50 32 40 | 32 65 | 50
Hst | mall allall all< 26 |
≥ 26
< 22 |
≥ 22
all< 28 |
≥ 28
< 30 |
≥ 30
all< 45 |
≥ 45
< 48|
≥ 48
all< 80 |
≥ 80
< 70 |
≥ 70
DNd 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32
Hst | mall allall allall allall allall allall allall al
ll
Swm
max. qwm > 1300 l/h
(Rell 16000/36000/48000,
Rell Demin 13500/18000)
max. qwm < 1300 l/h
(Rell 6000/12000,
Rell Demin 2000/4000)
14
1x230V
T.1:10A/3x1,0mm2
T.2:16A/3x1,5mm2
5
1 2
LPE
N
LPE
N
34
1!
#1-5
T.1 = 10A
T.2 = 16A
6
BrainCube
Connect!
www.imi-hydronic.com
15
www.imi-hydronic.com
We reserve the right to introduce technical alterations without prior notice.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16

IMI Hydronic Engineering TV4-14 User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI