BALD 481A42 Installation guide

  • Hello! I've reviewed the installation manual for the Touchboards Floor support 400 and 400H. It contains instructions for mounting the supports to different types of walls and assembling the components with included mounting hardware. I'm ready to answer any questions you have about this device's installation or the steps described in the document.
  • What is the minimum number of fixation points per bracket?
    What type of wall is mentioned in the manual?
    What hardware is advised for mounting?
Floorsupport
for the BalanceBox®400 and 400H
Installation manual
order number: 481A42
Floor support
for the BalanceBox®400 and 400H
partnr: 902828-00
606
24"
406
16"
406
16"
Important:
When mounting on
studded plastered
drywalls
always mount to the
studs in the wall.
(common stud distances
shown in the sketch)
Use minimum 2 fixation
points per bracket.
Fischer UX 10 mm
Wurth Master 10 mm
DIN 571 8 x 70 mm.
diam. 5/16¨ x 3¨
DIN 571 8 x 70 mm.
diam. 5/16¨ x 3¨
Toggler Snaptoggle BE
diam. M8 or 5/16¨ -18
wood-stud
drywall
wood-stud
drywall
metal-stud
drywall
ADVISED MOUNTING HARDWAREWALL TYPE
Installation Manual
for Floorsupport for BalanceBox®400 and 400H
10
6
111
4
32
5
7 98
E
B
K
E
AE
L
Contents of the box
Assemble 2 legs (5mm) Assemble 3x (5 mm) Assemble 4x (4 mm)Hang BalanceBox (*) and
fix at bottom, use screw N
(5 mm)
NOTE: careful not to
damage grey plastic
dampener!
Set height and align top
level Measure 494mm and fix
(4 mm)Assemble top and bottom
4x
Fix 3 brackets to the wall
fasteners not included Fix TOP bracket (5mm) Fix bottom bracket (5mm)
F
* Please refer to
BalanceBox® user
manual!
Mount cover strips with
double sided tape
G:4x H:4x I:12x J:12x K:4x L:4x M:14X N:2X
A
B
A:2x
B:4x
C:3x
D:1x
E:1x
F:2x
B
F
MM
BC
H
Min 2 screws per bracket
I
JK
DE
K
N
GB
L
/