Salsbury Industries 2300 Installation guide

Type
Installation guide

This manual is also suitable for

SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Phone: 1-800-624-5269 Int’l Phone: 323-846-6700
Fax: 1-800-624-5299 Int’l Fax: 323-846-6800
Free Standing Roll-a-Bouts
2300 Series Installation Instructions
Thank you for selecting Salsbury’s 2300 series Free Standing Roll-a-Bouts. We are confident that the quality and construction of this product will
provide years of maintenance free use.
Installation Instructions
1. Place the Roll-a-Bout enclosure upright on flat surface.
2. Open the rear door and starting at the bottom, load 5 aluminum
mailbox modules (or 1 lower brass mailbox module if 2350).
3. Load 1 upper mailbox (only on 2350), making sure it is
pushed all the way forward.
4. On model 2300, all 5 aluminum mailbox modules should have
the rear flange placed within the notch of the supporting angle
brackets on the Roll-a-Bouts.
5. Close rear door and engage hasp and padlock eye. Lock with
standard padlock if so desired.
2300 / 2350 Free Standing Roll-a-Bouts
2300
For Aluminum Rack Ladder mailboxes
and Data Distribution boxes
2350
For Brass and Americana rear
loading mailboxes
Note: order mailboxes separately
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2006 Salsbury Industries. All rights reserved.
  • Page 1 1

Salsbury Industries 2300 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI