Salsbury Industries 2300, 2350 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Salsbury Industries 2300 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Phone: 1-800-624-5269 Int’l Phone: 323-846-6700
Fax: 1-800-624-5299 Int’l Fax: 323-846-6800
Free Standing Roll-a-Bouts
2300 Series Installation Instructions
Thank you for selecting Salsbury’s 2300 series Free Standing Roll-a-Bouts. We are confident that the quality and construction of this product will
provide years of maintenance free use.
Installation Instructions
1. Place the Roll-a-Bout enclosure upright on flat surface.
2. Open the rear door and starting at the bottom, load 5 aluminum
mailbox modules (or 1 lower brass mailbox module if 2350).
3. Load 1 upper mailbox (only on 2350), making sure it is
pushed all the way forward.
4. On model 2300, all 5 aluminum mailbox modules should have
the rear flange placed within the notch of the supporting angle
brackets on the Roll-a-Bouts.
5. Close rear door and engage hasp and padlock eye. Lock with
standard padlock if so desired.
2300 / 2350 Free Standing Roll-a-Bouts
2300
For Aluminum Rack Ladder mailboxes
and Data Distribution boxes
2350
For Brass and Americana rear
loading mailboxes
Note: order mailboxes separately
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2006 Salsbury Industries. All rights reserved.
/