ROOTECH Accura 2300S/2350-1P3FSC User guide

Category
Measuring, testing & control
Type
User guide
Distribution Panel Digital Power Meter
Accura 2300S front view
Accura 2300S rear view
Single-phase Three-Feeder
Power Measuring Module
Special-Purpose Module
Accura 2350-1P3FSC-125A
(Basic Module)
Accura 2350-GAS
Accura 2350-GW
Accura 2350-1P3FSC-125A-DIZCT
(Option Module)
Accura 2350-TEMP
Accura TSEN
Accura 2350-1P3FSC-60A
(Basic Module)
Accura 2350-DO
Accura 2350-IDC
Accura 2350-1P3FSC-60A-DIZCT
(Option Module)
Accura 2350-DCM-50V-80A
Accura 2350-DCM-500V-80A
Accura 2300S/2350 User Guide
Notice
2015 Rootech Inc. All Rights Reserved
Page 3
Notice
Symbols
Caution
Indicates the presence of dangerous voltage which can cause severe injury or death if
proper precautions are not followed.
Caution
Alerts the user of the presence of hazards which can result in injury, damage to property
or to the device if proper precautions are not followed.
Note
Indicates installation, operation and maintenance instructions for the product.
Indicates alternative voltage or current.
Indicates direct voltage or current.
Installation Considerations
The installation and operation of Accura 2500/2550 should be performed only by qualified, competent
personnel that have received appropriate training and experience with high voltage and current modules.
Caution
Failure to observe the following instructions may result in severe injury or death.
During normal operation of Accura 2500/2550, hazardous voltages are present on its terminal strips that
connect the PT(Potential Transformer), CT(Current Transformer), voltage input, power, and external I/O
circuits. The secondary of the PT/CT may generate fatal voltages/currents resulting from the primary of
the PT/CT.
Standard safety precautions should be followed while installing or maintaining the product, including
removing PT fuses and shorting CT secondaries.
Install the product in a switchgear cabinet to prevent users from accessing terminal strips after
completing wiring of the product.
Notice
Accura 2300S/2350 User Guide
Page 4
2015 Rootech Inc. All Rights Reserved
Caution
Observe the following instructions, or permanent damage may occur to the product.
Do not apply voltages and currents that exceed input ratings of the PT and the CT to the product.
Using the device for other purposes not specified by the manufacturer can cause severe damage to the
product.
Connect the device’s chassis ground terminal to the earth ground to protect the device from noise and
surge.
About the Manual
Rootech Inc. reserves the right to make changes in the device specifications shown in this User Guide
without notice. Therefore, we recommend that customers should check the latest information on
specifications of the device before making orders.
In the absence of written agreements, Rootech Inc. assumes no liability for assistance with product
applications and the system design created by customers or legal issues, including infringement of
intellectual property arising from the use of modules described herein by third-parties.
We are committed to providing accurate information in this document. However, we assume no
responsibility for any errors in the document and reserves the right to make changes without notice.
Limitation of Liability
Where applicable law allows and does not prohibit or restrict such limitation, Rootech, Inc’s liability for this
product shall be limited to the price paid for the product.
Accura 2300S/2350-1P3FSC User Guide
Warranty
2015 Rootech Inc. All Rights Reserved
Page 5
Warranty
Rootech Inc. provides warrants for two years from the product receipt date only to the original
purchaser of the products and software that are sold or licensed by the company.
To obtain warranty service, the purchased products should be free from serious defects in material and
workmanship.
The software is provided in an up-to-date version, thus we do not offer any warranty for the software
product.
In order to make a product claim under the warranties described above, the original purchaser should
immediately contact Rootech headquarters. Upon receiving claims, Rootech will check out the product
either at where the purchaser is or at the company after receiving the product from the customer, who
is responsible for the cost of shipping the product. After inspecting the product, we will provide repair
or replacement services for the product.
Rootech will decide at its discretion whether to repair or replace it or give a refund for the product for
when the warranty period for the product expired or issues related to the product are not applicable for
warranty terms and conditions.
Limitation of Warranty
The Warranty does not apply to uninterrupted or error-free operation of the product or cover normal
wear and tear of the product or costs caused by the removal, installation, or troubleshooting of the
customer's electrical systems.
Defects caused by any of the following factors are not covered under the warranty.
Improper use(alteration, accident, misuse, abuse) or failure to act in accordance with installation,
operation or maintenance instructions
Unauthorized modifications, changes or repair attempts
Failure to comply with applicable safety standards & regulations
Damages resulting from transporting or storing the product
Damages caused by the force majeure event, including fire, flood, earthquakes, storm damage,
overvoltage & lightning
If the original identification marks(trade-mark, serial number, etc.) have been defaced, altered, or
removed
Warranty
Accura 2300S/2350-1P3FSC User Guide
Page 6
2015 Rootech Inc. All Rights Reserved
Rootech shall not be liable for any other claims except the claims made by customers, including the
original purchaser, his employees, agents, or contractors for any loss, damage, or expense incurred
related to the purchased product when the above warranty terms and conditions are not fulfilled.
Any technical assistance provided by Rootech's personnel or representatives in system design shall be
deemed to be a suggestion. The original purchaser is responsible for determining the feasibility of such
suggestions and should conduct tests to prove their feasibility
It is the original purchasers responsibility to determine the suitability of any product and associated
documentation. The original purchaser should acknowledge that 100% uptime is not guaranteed
because of possible hardware or software defects. The original purchaser should also recognize that
such defects and failures may cause inaccuracies or malfunctions.
Any agency, corporate entity, or individual employees of Rootech or other companies is not authorized
to amend, modify or extend warranty in any way.
Standard Compliance
Process Control Equipment
E324900
MSIP-REM-RTE-ACCURA 2300S
Accura 2300S/2350-1P3FSC User Guide
Warranty
2015 Rootech Inc. All Rights Reserved
Page 7
Revision History
The following version of Accura 2300S/2350-1P3FSC User Guide has been released.
Revision
Date
Description
Revision 1.20
February 15, 2019
Initial release
Revision 1.21
May 31, 2019
Added detailed description of DO pulse generation related to energy
Revision 1.22
September 25, 2019
Return to Accura 2350 module management policy
Voltage THD: extended to 40th harmonic (voltage 384-sampling/cycle)
Added measurement description for harmonics
Revision 1.23
July 14, 2021
Modified the Max/Min data errors in the General Measurement table
Updated standard compliance
Modified some images about connection as KEC revision
Contents
Accura 2300S/2350-1P3FSC User Guide
Page 8
2015 Rootech Inc. All Rights Reserved
Contents
Chapter 1 Introduction ...................................................................................................................................................... 14
Overview ................................................................................................................................................................................................................... 14
Application ............................................................................................................................................................................................................... 17
Device Lineup ......................................................................................................................................................................................................... 18
Data Center Distribution Panel Digital Power Meter/Single-phase Three Feeder Power Measuring Module18
Distribution Panel Digital Power Meter/General Power Measuring Module ................................................................. 18
Special-Purpose Module ......................................................................................................................................................................... 19
Installation Example ................................................................................................................................................................................... 20
Features............................................................................................................................................................................................................ 22
Chapter 2 Installation ......................................................................................................................................................... 25
Environmental Conditions ................................................................................................................................................................................ 25
Before you begin .................................................................................................................................................................................................. 26
Meter Overview ........................................................................................................................................................................................... 26
Components .................................................................................................................................................................................................. 27
Dimension ....................................................................................................................................................................................................... 28
Installation ...................................................................................................................................................................................................... 30
Step 1: Mounting .................................................................................................................................................................................................. 32
Accura 2300S Mounting .......................................................................................................................................................................... 32
Accura 2350-1P3FSC Power Measuring Module Panel Installation ................................................................................... 33
Step 2: Accura 2300S Wiring .......................................................................................................................................................................... 38
Accura 2300S Voltage Connection ..................................................................................................................................................... 38
Accura 2300S Digital Input/Output Wiring .................................................................................................................................... 43
Step 3: Accura 2350-1P3FSC Through-hole Wiring ............................................................................................................................ 46
Step 4: Accura 2350-1P3FSC-DIZCT Wiring ............................................................................................................................................ 50
Step 5: Accura 2300S/2350 Combination of Communication ....................................................................................................... 53
Step 6: Accura 2300S External Communication .................................................................................................................................... 55
Ethernet Communication ........................................................................................................................................................................ 55
RS-485 Communication ........................................................................................................................................................................... 57
Step 7: Accura 2300S Power Supply and Ground Connection ...................................................................................................... 58
Power Supply Connection....................................................................................................................................................................... 58
Ground Terminal Connection ................................................................................................................................................................ 58
Chapter 3 Accura 2350-1P3FSC Operation/Setup ........................................................................................................... 59
Operation Mode .......................................................................................................................................................................................... 59
Button Operation ........................................................................................................................................................................................ 59
Display Mode ................................................................................................................................................................................................ 60
Setup Mode ................................................................................................................................................................................................... 61
Chapter 4 Accura 2300S Operation/Setup ..................................................................................................................... 70
Accura 2300S/2350-1P3FSC User Guide
Contents
2015 Rootech Inc. All Rights Reserved
Page 9
Device Configuration .......................................................................................................................................................................................... 70
Operation Mode .......................................................................................................................................................................................... 70
LED Display .................................................................................................................................................................................................... 70
Button Operation ........................................................................................................................................................................................ 70
Display Mode ......................................................................................................................................................................................................... 72
Front Display ................................................................................................................................................................................................. 72
Accura 2350 Module ID Selection ...................................................................................................................................................... 74
Display Full Screen ..................................................................................................................................................................................... 75
Voltage/Current/Power ............................................................................................................................................................................. 76
Voltage/Frequency ...................................................................................................................................................................................... 76
Current.............................................................................................................................................................................................................. 77
Power/Power Factor ................................................................................................................................................................................... 77
Demand ........................................................................................................................................................................................................... 77
Active Energy ................................................................................................................................................................................................ 78
Leakage Current........................................................................................................................................................................................... 78
Ethernet Information ................................................................................................................................................................................. 79
Temperature/Time ....................................................................................................................................................................................... 80
Setup Mode ............................................................................................................................................................................................................ 81
Setup Full Screen ........................................................................................................................................................................................ 82
Measurement Setup .................................................................................................................................................................................. 83
Event Setup .................................................................................................................................................................................................... 88
RS-485 Communication Setup ............................................................................................................................................................. 98
Ethernet Communication Setup......................................................................................................................................................... 100
Reset Setup .................................................................................................................................................................................................. 103
Display Setup .............................................................................................................................................................................................. 104
Accura 2350 Module ID Setup ........................................................................................................................................................... 107
Information................................................................................................................................................................................................... 111
Digital Input/Output Setup .................................................................................................................................................................. 112
Event Log Mode.................................................................................................................................................................................................. 117
Start Event and End Event .................................................................................................................................................................... 117
Start Event Alarm Generation ............................................................................................................................................................. 117
Start Event Alarm Clearing ................................................................................................................................................................... 117
Button Function ......................................................................................................................................................................................... 118
Event Log Number ................................................................................................................................................................................... 119
Event Time-stamp ..................................................................................................................................................................................... 119
Dip Event Log ............................................................................................................................................................................................. 120
Swell Event Log .......................................................................................................................................................................................... 120
Fuse Fail Event Log .................................................................................................................................................................................. 121
Temperature Event Log .......................................................................................................................................................................... 121
Contents
Accura 2300S/2350-1P3FSC User Guide
Page 10
2015 Rootech Inc. All Rights Reserved
Current Event Log ..................................................................................................................................................................................... 122
Leakage Current Event Log .................................................................................................................................................................. 122
Demand Current Event Log ................................................................................................................................................................. 123
1P3FSC DI Event Log ............................................................................................................................................................................... 123
No Event Log .............................................................................................................................................................................................. 123
Required Setup Step ......................................................................................................................................................................................... 124
Step 1: Accura 2300S Connection, PT Rating ............................................................................................................................. 124
Step 2: Accura 2350 Communication ID Auto-Assignment and Update ...................................................................... 125
Step 3: Accura 2300S Ethernet Setup ............................................................................................................................................. 128
Chapter 5 Measurement Description............................................................................................................................. 129
General Measurement ...................................................................................................................................................................................... 129
Measurement Event .......................................................................................................................................................................................... 131
Measurement for Voltage Connection .................................................................................................................................................... 132
3-phase 4-wire ........................................................................................................................................................................................... 132
3-phase 3-wire ........................................................................................................................................................................................... 133
1-phase 3-wire ........................................................................................................................................................................................... 135
1-phase 2-wire ........................................................................................................................................................................................... 136
Dip[Sag]/Swell Measurement ....................................................................................................................................................................... 137
Leakage Current Measurement ................................................................................................................................................................... 138
Residual Voltage Measurement ................................................................................................................................................................... 138
Phase Power Measurement ........................................................................................................................................................................... 139
Power Factor(PF) Measurement ................................................................................................................................................................... 140
PF Phase Angle Status Measurement ....................................................................................................................................................... 140
Demand Measurement .................................................................................................................................................................................... 141
Voltage Harmonics ............................................................................................................................................................................................ 142
Current Harmonics ............................................................................................................................................................................................. 142
Unbalance(NEMA MG1) .................................................................................................................................................................................. 143
Sequence Unbalance ........................................................................................................................................................................................ 144
Aggregation .......................................................................................................................................................................................................... 145
Appendix A Specification ................................................................................................................................................ 147
Appendix B Standard Compliance ................................................................................................................................. 150
Appendix C Accuracy/Reliability .................................................................................................................................... 151
Accuracy ........................................................................................................................................................................................................ 151
Reliability ....................................................................................................................................................................................................... 152
Appendix D Ordering Information ................................................................................................................................. 153
Accura 2300S/2350-1P3FSC User Guide
Contents
2015 Rootech Inc. All Rights Reserved
Page 11
Figures
Fig 1.1 Accura 2350-1P3FSC Dimension Compatibility for Each Rating of MCCB/ELB ............................................ 16
Fig 1.2 Accura 2350-1P3FSC Power Measuring Module Installation ................................................................................ 16
Fig 1.3 Accura 2300S/2350-1P3FSC Installation Example[Using external CT and Accura 2350-3P-CT5A
model incoming feeder] .......................................................................................................................................................................... 20
Fig 1.4 Accura 2300S/2350-1P3FSC Installation Example[Using Accura 2350-1PSCSH model at incoming
feeder] .............................................................................................................................................................................................................. 21
Fig 2.1 Accura 2300S Front .................................................................................................................................................................... 26
Fig 2.2 Accura 2300S Side ...................................................................................................................................................................... 26
Fig 2.3 Accura 2300S Rear ...................................................................................................................................................................... 26
Fig 2.4 Accura 2350-1P3FSC Power Measuring Module ......................................................................................................... 27
Fig 2.5 Accura 2300S Components .................................................................................................................................................... 27
Fig 2.6 Accura 2350-1P3FSC Power Measuring Module Components ............................................................................ 27
Fig 2.7 Accura 2300S Front Dimension ............................................................................................................................................ 28
Fig 2.8 Accura 2300S Side Dimension .............................................................................................................................................. 28
Fig 2.9 Accura 2300S Rear Dimension ............................................................................................................................................. 28
Fig 2.10 Accura 2350-1P3FSC Power Measuring Module Dimension .............................................................................. 29
Fig 2.11 Accura 2300S/2350-1P3FSC Installation [Using 1PSCSH module at incoming feeder] ......................... 30
Fig 2.12 Accura 2300S/2350-1P3FSC Installation [Using 3P-CT5A module at incoming feeder] ....................... 31
Fig 2.13 Accura 2300S Mounting ........................................................................................................................................................ 32
Fig 2.14 Accura 2350-1P3FSC Power Measuring Module Installation[Using mounting wing] ............................. 33
Fig 2.15 Accura 2350-1P3FSC Mounting Plate Cutout[Using mounting wing] ............................................................ 34
Fig 2.16 Accura 2350-1P3FSC Mounting Plate [Using the lower part of power measuring module] .............. 35
Fig 2.17 Accura 2350-1P3FSC Remodeling Installation[Using Cable tie] ........................................................................ 36
Fig 2.18 Accura 2350-1P3FSC Remodeling Installation[Using lower part of module] ............................................. 37
Fig 2.19 Accura 2300S Voltage Connection................................................................................................................................... 38
Fig 2.20 Three-phase 4-wire Direct Connection .......................................................................................................................... 39
Fig 2.21 Three-phase 4-wire 3PT Connection .............................................................................................................................. 39
Fig 2.22 Three-phase 3-wire Direct Connection .......................................................................................................................... 40
Fig 2.23 Three-phase 3-wire 2PT Connection .............................................................................................................................. 40
Fig 2.24 Single-phase 3-wire Direct Connection ......................................................................................................................... 41
Fig 2.25 Single-phase 3-wire 2PT Connection ............................................................................................................................. 41
Fig 2.26 Single-phase 2-wire Direct Connection ......................................................................................................................... 42
Fig 2.27 Single-phase 2-wire 1PT Connection ............................................................................................................................. 42
Fig 2.28 Accura 2300S Digital Input/Output Channel .............................................................................................................. 43
Fig 2.29 Digital Input ................................................................................................................................................................................ 43
Fig 2.30 DC Relay Application .............................................................................................................................................................. 45
Fig 2.31 AC Relay Application............................................................................................................................................................... 45
Contents
Accura 2300S/2350-1P3FSC User Guide
Page 12
2015 Rootech Inc. All Rights Reserved
Fig 2.32 Accura 2350-1P3FSC Through-hole Installation Position ..................................................................................... 47
Fig 2.33 Accura 2350-1P3FSC Measurement Principle ............................................................................................................. 47
Fig 2.34 Three-phase 4-wire Through-hole Wiring .................................................................................................................... 48
Fig 2.35 Three-phase 3-wire Through-hole Wiring .................................................................................................................... 49
Fig 2.36 Digital Input 4 Channels of Option Module ............................................................................................................... 50
Fig 2.37 ZCT Input 3 Channels of Option Module ..................................................................................................................... 51
Fig 2.38 ZCT Wiring ................................................................................................................................................................................... 51
Fig 2.39 Digital Input and ZCT Wiring of Option Module ..................................................................................................... 52
Fig 2.40 Accura 2300S/2350 Combination Example of Communication ......................................................................... 53
Fig 2.41 Accura 2300S Ethernet Communication Port ............................................................................................................. 55
Fig 2.42 Accura 2300S Ethernet Communication ....................................................................................................................... 56
Fig 2.43 Accura 2300S RS-485 Communication .......................................................................................................................... 57
Fig 2.44 Accura 2300S RS-485 Communication Connection ................................................................................................ 57
Fig 2.45 Accura 2300S Power Supply ............................................................................................................................................... 58
Fig 4.1 Accura 2300S Front configuration ...................................................................................................................................... 70
Fig 4.2 Screen of Display Mode ........................................................................................................................................................... 71
Fig 4.3 Screen of Setup Mode .............................................................................................................................................................. 71
Fig 4.4 Screen of Event Log Mode ..................................................................................................................................................... 71
Fig 4.5 Accura 2300S Front View ........................................................................................................................................................ 72
Fig 4.6 Accura 2300S Temperature Sensor ..................................................................................................................................... 73
Fig 4.7 Accura 2350 Module ID Selection at upper part of LCD Screen ........................................................................ 74
Fig 4.8 Line-to-neutral Voltage/Current/Power Display Screen ........................................................................................... 76
Fig 4.9 Line-to-line Voltage/Current/Power Display Screen .................................................................................................. 76
Fig 4.10 Line-to-line Voltage Display Screen ................................................................................................................................ 76
Fig 4.11 Current Display Screen .......................................................................................................................................................... 77
Fig 4.12 Active Power Display Screen ............................................................................................................................................... 77
Fig 4.13 Demand Active Power Display Screen ........................................................................................................................... 78
Fig 4.14 Net Energy Display Screen of Feeder 1 ........................................................................................................................ 78
Fig 4.15 Leakage Current Display Screen........................................................................................................................................ 79
Fig 4.16 Ethernet Connection Display Screen ............................................................................................................................... 79
Fig 4.17 Accura 2300S Rear Surface Temperature Display Screen ..................................................................................... 80
Fig 4.18 3-phase 4-wire connection[3P4W]: PT Primary VAB , Secondary V12............................................................... 83
Fig 4.19 3-phase 3-wire connection[3P3W]: PT Primary VAB , Secondary V12............................................................... 84
Fig 4.20 1-phase 3-wire connection[1P3W]: PT Primary VL12 , Secondary V13 ............................................................. 84
Fig 4.21 1-phase 2-wire connection[1P2W]: PT Primary VL12 , Secondary V1N ............................................................. 84
Fig 4.22 Dip Event Setup[3-phase 4-wire] ...................................................................................................................................... 89
Fig 4.23 Dip Event Setup[3-phase 3-wire] ...................................................................................................................................... 89
Fig 4.24 Swell Event Setup[3-phase 4-wire] .................................................................................................................................. 91
Fig 4.25 Swell Event Setup[3-phase 3-wire] .................................................................................................................................. 91
Accura 2300S/2350-1P3FSC User Guide
Contents
2015 Rootech Inc. All Rights Reserved
Page 13
Fig 4.26 Dip[Sag] Event Alarm Display ........................................................................................................................................... 117
Fig 4.27 Swell Event Alarm Display .................................................................................................................................................. 117
Fig 4.28 Event Log Number Example ............................................................................................................................................. 119
Fig 5.1 3PT 3P4W Connection ............................................................................................................................................................ 132
Fig 5.2 2PT 3P3W Connection ............................................................................................................................................................ 133
Fig 5.3 2PT 1P3W Connection ............................................................................................................................................................ 135
Fig 5.4 1PT 1P2W Connection ............................................................................................................................................................ 136
Fig 5.5 Half-cycle Refreshed 1-cycle RMS Calculation............................................................................................................ 137
Fig 5.6 Voltage Dip[Sag] Detection .................................................................................................................................................. 137
Fig 5.7 Power Sign and PF Phase Angle Status ......................................................................................................................... 140
Fig 5.8 Demand Calculation ................................................................................................................................................................ 141
Fig 5.9 Prediction Demand Calculation .......................................................................................................................................... 141
Fig 5.10 Voltage FFT Data Processing (~MCU F/W 3.50) ..................................................................................................... 142
Fig 5.11 Voltage FFT Data Processing (MCU F/W 3.51~) ..................................................................................................... 142
Fig 5.12 Current FFT Data Processing............................................................................................................................................. 143
Fig 5.13 Symmetrical Components .................................................................................................................................................. 144
Fig 5.14 Aggregation Process ............................................................................................................................................................. 145
Chapter 1 Introduction
Accura 2300S/2350-1P3FSC User Guide
Page 14
2015 Rootech Inc. All Rights Reserved
Chapter 1 Introduction
Overview
Energy Management Paradigm Shift from Main Load to Branch Load
In the energy low-cost era, total energy management centered on switchgear panels such as main
feeder (from feeder to ABS) for stable power supply played an important role. However, there is an
increasing demand to manage the branch load electrical energy in manufacturing plants, IDC centers,
and the distribution boards of buildings when the energy costs rise sharply and the CO2 emission
reduction policy is implemented in 2015.
Limit of Applying the Switchgear Panel Digital Power Meter to Distribution Panel
To apply the digital power meter which is long used in the existing switchgear panel to distribution
panel has had the limit caused by narrow space, hazardous wiring of voltage and current, and high
installation cost. This fundamentally makes it difficult for energy management supervisor to access to
the energy information of branch loads in distribution panel.
Distribution Panel Digital Power Meter Specialized for Branch Load Management
Distribution panel digital power meter comprises both Accura 2300S[digital power meter] which is
mounted on front of distribution panel, and Accura 2350[power measuring module] which is mounted in
branch loads inside the panel. Accura 2300S collects power data from several Accura 2350s on RS-485
communication and displays measurements of only one Accura 2350 selected on its LCD screen. This
provides energy management supervisor with the power quality information of branch loads which was
impossible to identify.
Accura 2350-1P3FSC Single-phase Three Feeder Power Measuring Module, Suitable for Data Center
Distribution Panel Having Multiple Single-phase Feeders
Data center distribution panel has multiple single-phase feeders of the same current capacity. Accura
2350-1P3FSC single-phase three feeder power measuring module measures three single-phase feeders
of the same current capacity at the same time. Installation time and cost can be drastically reduced
comparing to installment of Accura 2350-1P[1PSC] single-phase power measuring module.
Accura 2350-1P3FSC-DIZCT Single-phase Three Feeder Power Measuring Module[Option Module]
Supporting the Monitoring of Leakage Current for Each Single-phase Feeder, and MCCB Trip-status
Accura 2350-1P3FSC-DIZCT single-phase three feeder power measuring module[Option module]
provides the additional function to monitor both leakage current and MCCB trip-status of each single-
phase feeder by expanding the function of Accura 2350-1P3FSC single-phase three feeder power
measuring module[Basic module]. This makes it possible to do not only the energy management but
also the safety management for consistency of power supply.
Accura 2300S/2350-1P3FSC User Guide
Chapter 1 Introduction
2015 Rootech Inc. All Rights Reserved
Page 15
Voltage ±0.2% Reading/Current ±0.5% Reading/IEC62053-22 Class 0.5S
Recently enterprise energy management system is essential for effective energy use and preventive
management to prepare CO2 emission management in data center, plant and building. The key factor to
determine reliability of the energy management is measuring accuracy. Accura 2300S/2350 supports
precision measurement of ±0.2% reading error of voltage and ±0.5% 1 reading error of current, and
conforms to IEC62053-22 class 0.5S for power and energy. This makes it possible to precisely analyze
and diagnose various problems with energy management and power facilities.
1. Single-phase three feeder power measuring module can increase the error of up to ±1% reading value depending
on the penetration position of power cable.
Dip[Sag]/Swell[IEC61000-4-30], Power Quality
Accura 2300S provides a variety of power quality information, including dip[sag], swell and harmonic
information[up to 40th], crest factor, K-factor, and unbalance ratio. This enables the energy manager to
easily identify power quality changes in various power distribution systems in the power plant, thus
realistic power quality management is possible. Power quality information conforms to IEC61000-4-30.
Maximum/Minimum/Average during Aggregation Interval
Accura 2300S calculates average at every 0.5 second interval from measurements at cycle time,
providing maximum/minimum/average at 1 second, 5 second, 1 minute, 5 minute, 1 hour and 6 hour
intervals from average at every 0.5 second interval. The measuring interval which is more than 0.5
second interval is called aggregation interval.
Accura 2300S provides both of maximum/minimum/average at each aggregation interval and time
information[time stamp] at the time of generation, as well as average at 0.5 second interval about
various measuring parameters such as voltage, current, power, and etc on communication. This includes
information of the measuring parameters fluctuating instantaneously, which makes it possible to
precisely analyze the trend of quality of voltage, current, and power.
Proven Safety and Reliability with CE/UL/KC
The structure-framework, circuit, and fire of Accura 2300/2350 conforms to standard CE[EN61326-1,
EN61326-2-1], UL[UL61010-1], and KC[KN22, KN24].
All-in-one Installation with MCCB/ELB Having the Same Current Rating
Accura 2350-1P3FSC single-phase three feeder power measuring module is installed all-in-one with the
existing MCCB because the distance between through-holes of the module on two kinds of current
rating, 60A and 125A is compatible with that between terminals of MCCB/ELB.
Chapter 1 Introduction
Accura 2300S/2350-1P3FSC User Guide
Page 16
2015 Rootech Inc. All Rights Reserved
Fig 1.1 Accura 2350-1P3FSC Dimension Compatibility for Each Rating of MCCB/ELB
Split-core Structure Possible to Install on Live Wire
Accura 2350-1P3FSC single-phase three feeders power measuring module makes it possible to install
without power interruption by split-core structure.
Fig 1.2 Accura 2350-1P3FSC Power Measuring Module Installation
Accura 2300S/2350-1P3FSC User Guide
Chapter 1 Introduction
2015 Rootech Inc. All Rights Reserved
Page 17
Application
Enterprise Energy Management
Providing energy information of branch loads in distribution panel, Accura 2300S/2350 together with
Accura 3300S/3500S/3550S/3700/7500 mounted in switchgear panels truly makes it possible to realize
enterprise energy management system.
Data Center Energy Management on Each Server
Accura 2350-1P3FSC single-phase three feeder power measuring module is optimized for server
distribution panel with multiple single feeders of the same current capacity, measuring three single
feeders per one module. In addition, Accura 2350-1P3FSC-DIZCT single-phase three feeder power
measuring module[option module] supports safety management by monitoring both leakage current of
each feeder and MCCB trip-status.
CO2 Emission Management by Reduction of High Energy Cost
Accura 2300S/2350 provides various power quality information which enables management of energy
use, power facility operation and high efficiency device analysis. This can be an essential infrastructure
for management of CO2 emission, presenting the exact analytic criterion on energy usage status to
energy management supervisor.
Energy Efficiency Verification of High Efficiency Device
Accura 2300S/2350 provides high accuracy energy information to determine the efficiency of high
efficiency device such as LED, lighting, motor, and power facility.
Chapter 1 Introduction
Accura 2300S/2350-1P3FSC User Guide
Page 18
2015 Rootech Inc. All Rights Reserved
Device Lineup
Data Center Distribution Panel Digital Power Meter/Single-phase Three Feeder Power
Measuring Module
Data center distribution panel digital power meter comprises Accura 2300S [digital power meter] which
is mounted at the front of distribution panel, and Accura 2350-1P3FSC which is mounted per 3 feeders
inside the panel. Accura 2300S collects and display data from the large number of Accura 2350-1P3FSC
using the 6C telephone line 1.
Device
Model
Description
Weight
Distribution panel digital
power meter
Accura 2300S
Collects data from all Accura 2350s
487 g
Selectively displays one Accura 2350 2
Ethernet[or RS-485] communication
Temperature of Accura 2300S rear side 3
Single-phase three feeder
Power measuring module
Accura 2350-1P3FSC-125A
Current measurement rating 125A
457 g
Accura 2350-1P3FSC-125A-DIZCT
Current measurement rating 125A,
option[connects DI, ZCT]
468 g
Accura 2350-1P3FSC-60A
Current measurement rating 60A
393 g
Accura 2350-1P3FSC-60A-DIZCT
Current measurement rating 60A,
option[connects DI, ZCT]
404 g
1. Packaged with device. Core conductor of telephone line should be minimum 0.128mm2[26 AWG]. Distance from
the power line should be 5mm or more so that communication interference caused by the noisy power line will not
occur.
2. Accura 2300S displays only measurements of one Accura 2350 selected. Refer to “Chapter 4 Accura 2300S
Operation/Setup > Display Mode > Module ID Selection”.
3. It is not for firewatching, but for reference only. A temperature sensor is mounted on the rear of Accura 2300S.
Distribution Panel Digital Power Meter/General Power Measuring Module
Refer to Accura 2300S/2350 User Guide for details of distribution panel digital power meter except for
the Accura 2350-1P3FSC which measures the three single-phase feeder at the same time.
Accura 2300S/2350-1P3FSC User Guide
Chapter 1 Introduction
2015 Rootech Inc. All Rights Reserved
Page 19
Special-Purpose Module
Accura 2350 module for special purpose in addition to measuring module is as follows. Refer to Accura
2300S/2350 User Guide for more details about these special-purpose modules.
Module
Model
Description
GAS
Accura 2350-GAS
Gas concentration of the surroundings
GW[Gateway]
Accura 2350-GW
Collects data of device that supports RS-485 communication.
TEMP[Temperature]
Accura 2350-TEMP
External temperature measurements of the panel where the module
is installed
Accura TSEN
Temperature measurements at the location where the module is
installed inside the distribution panel
Accura 2350-TEMPS
Simultaneous measurement of internal and external temperature
[based on temperature measuring module installation surface]
DO[Digital Output]
Accura 2350-DO
Provides digital output which is able to be controlled in remote and
from Accura 2300S.
IDC[DC Current Input]
Accura 2350-IDC
Analog current input [-20mA to 20mA]
VDC[DC Voltage Input]
Accura 2350-VDC
Analog voltage input [-50V to 50V]
DCM[DC voltage/current]
Accura 2350-DCM
-50V-80A
Measurement up to DC 50V and 80A
-500V--80A
Measurement up to DC 500V and 80A
Chapter 1 Introduction
Accura 2300S/2350-1P3FSC User Guide
Page 20
2015 Rootech Inc. All Rights Reserved
Installation Example
Accura 2300S/2350-1P3FSC Installation Example[Accura 2350-3P-CT5A using external CT is used at
the incoming feeder]
The following is the installation example of single-phase three feeder power measuring module
optimized for distribution panel branching single-phase power line of the same current capacity.
However, as the incoming feeder has large current capacity and three-phase power line, it cannot be
measured by Accura 2350-1P3FSC. In this case, Accura 2350-3P-CT5A using external CT is installed in Fig
1.3 or Accura 2350-1PSCSH installed in Fig 1.4. Refer to Accura 2300S/2350 User Guide for the details
about Accura 2350-3P-CT5A-75 and Accura 2350-1PSCSH.
Fig 1.3 Accura 2300S/2350-1P3FSC Installation Example[Using external CT and Accura 2350-3P-
CT5A model incoming feeder]
1. If through-hole current exceeds 250A, Accura 2350-3P-CT5A-75 using external CT should be chosen.
Refer to Accura 2300S/2350 User Guide for details about Accura 2350-3P-CT5A-75.
2. Packaged with device. Core conductor of telephone line should be minimum 0.128mm2[26 AWG], and is
recommended as the distance more than 5mm with power line which creates a lot of noise not to cause
communication interferences.
3. Only for communication with host program.
Installation
Front panel
Accura 2300S
Distribution panel digital meter
Incoming feeder
Accura 2350-3P-CT5A-75 1
Three-phase power measuring
module
Branch load
Accura 2350-1P3FSC-125
Accura 2350-1P3FSC-60
Single-phase three feeder power
measuring module
Communication
6C telephone line 2
Only for internal communication
Ethernet 3
Only for external communication
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155

ROOTECH Accura 2300S/2350-1P3FSC User guide

Category
Measuring, testing & control
Type
User guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI