Sargent EC480 Installation guide

Type
Installation guide
Sargent Electrical Services Ltd. Copyright 2002
Issue 1 Page 1 of 1 21 October 2002
1 EC480 Control Panel Replacement
1.1 Installation Process
Unpack the new control panel.
Remove the decorative bezel from the control panel, by pulling in the direction of the BLUE
arrows.
Remove the two screws that hold the panel in place.
Carefully lift the panel forward to gain access to the rear circuit board of the control panel.
Disconnect the 6-way connector
Place the old panel to one side.
Connect the new panel to the 6-way connectors.
Check that all connectors are firmly seated.
Refit the control panel using the original screws and refit the bezel.
1.2 Current sensor re-calibration
Each EC480 control panel needs 'calibrating' to match the current sensor fitted within the EC500PSU.
The procedure is as follows:
If you have a solar panel fitted, either unplug the panel at the base of the PSU or carry out
this procedure at night.
With the charger turned off, and the power turned off at the control panel (no LED’s on)
Scroll down to the active battery screen
Hold down the select button (left arrow) until 'calibrating….' appears then release the
button
The current reading should now be correct.
  • Page 1 1

Sargent EC480 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI