2400

Aprilaire 2400, 2140, 2200 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Aprilaire 2400 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Air Cleaner Control Installation Instructions
Fits Models 2120, 2140, 2200, 2400 & 5000
The electronic controls (Figure 1) are used to circulate air through the air cleaner, monitor filter life and
inform the user that the air is being cleaned. Users can turn on the blower for a set period of time or
adjust it so that the blower is on, either as part of a heating/cooling call or blower only, for a set number
of minutes per hour. This requires the Air Cleaner Control to be mounted in an accessible location, and
requires 18-22 gauge (standard thermostat cable) wires to be run between the air cleaner components
and the HVAC components.
THE AIR CLEANER CONTROL CAN BE MOUNTED:
Option 1 (see below): near the thermostat.
Option 2 (see opposite side): on the air cleaner in the LED Base.
Option 3 (see opposite side): near the HVAC equipment.
Control
LED Base
INSTALL THE AIR CLEANER CONTROL
FIGURE 1 – Air Cleaner Control Components
90-1366
1
Run a 3-conductor cable between the LED Base and the low
voltage controls of the HVAC equipment.
2
Remove the cover from the LED Base and wire the LED Base to
the low voltage controls of the HVAC equipment as shown in
Diagram 3. Replace the cover on the LED Base.
3
Remove the backplate from the Air Cleaner Control and install
the backplate near the thermostat. Use the wire opening in the
wall behind the thermostat to make sure there is not a wall
stud between the thermostat and desired mounting location.
4
Run a 5-conductor cable between
the thermostat and Air Cleaner
Control.
5
Wire the thermostat to the
Air Cleaner Control as shown
in Diagram 4 or Diagram 5.
Diagram 4 is for standard, single
transformer systems; Diagram
5 is for two-transformer systems
such as radiant heat with forced
air cooling. Replace the Air
Cleaner Control on the backplate.
OPTION 1 – INSTALL THE AIR CLEANER CONTROL NEAR THE THERMOSTAT
R
FURNACE OR AIR
HANDLER
C
G
Y
W1
COOLING OR
COMPRESSOR
L1
L2
120
VAC
24
VAC
HEAT OR AUX.
HEAT
FAN
GSW
GF
C
R
LED BASE
SEE NOTE FOR
HEAT PUMPS AND
RADIANT HEAT
SYSTEMS
NOTE: IF THERE IS NO AUXILIARY HEAT OR IF THERE IS ONLY RADIANT HEAT,
DO NOT WIRE THE EQUIPMENT TO THE W TERMINAL OF THE LED BASE.
NEW WIRE
EXISTING
WIRE
LEGEND
WIRE NUT
BA
FROM THERMOSTAT
NOT USED
DIAGRAM 3 – Wiring the LED Base to the HVAC Equipment
90-1328
Wall Stud
FIGURE 3
4
3
5
FIGURE 2
90-1367
1
2
R
THERMOSTAT
G
Y
W
COOLING
HEATING
FAN
GSWGFC
R
AIR CLEANER CONTROL
DISCONNECT EXISTING WIRE FROM
THERMOSTAT G (FAN) TERMINAL AND
USE WIRE NUT TO CONNECT TO GF
WIRE FROM AIR CLEANER CONTROL
NEW WIRE
EXISTING
WIRE
LEGEND
WIRE NUT
BA
C
NOTE 1: IF THE TRANSFORMER COMMON IS NOT AVAILABLE, USE THE SUPPLIED BATTERIES
TO POWER THE AIR CLEANER CONTROL.
NOTE 2: IF THERE IS NO HEAT OR AUXILIARY HEAT OUTPUT WIRED ON THE THERMOSTAT,
JUMPER THE GS AND W TERMINALS ON THE AIR CLEANER CONTROL.
SEE NOTE 1
TO HVAC EQUIPMENT
SEE NOTE 2
NOT USED
DIAGRAM 4 – Single Transformer Systems
90-1332
RC
THERMOSTAT
Y
G
RH
W
COOLING
HEATING
FAN
GSW
GF
C
R
AIR CLEANER CONTROL
NEW WIRE
EXISTING
WIRE
LEGEND
WIRE NUT
BA
R
C
TO RADIANT/
HYDRONIC
HEAT SYSTEM
TO FORCED
AIR COOLING
SYSTEM
SEE NOTE
NOT USED
DISCONNECT EXISTING WIRE FROM THERMOSTAT G (FAN)
TERMINAL AND USE WIRE NUT TO CONNECT TO GF WIRE
FROM AIR CLEANER CONTROL
NOTE:
IF THE TRANSFORMER COMMON IS NOT AVAILABLE, USE THE SUPPLIED BATTERIES TO POWER
THE AIR CLEANER CONTROL. USE ONLY THE FORCED AIR COOLING SYSTEM TRANSFORMER
TO POWER THE AIR CLEANER CONTROL IN TWO TRANSFORMER SYSTEMS.
DIAGRAM 5 – Two Transformer Systems
90-1331
90-1321
Position the LED Base on the top of the Air Cleaner. If you have a plastic door latch on the top of the
Air Cleaner position the LED Base right behind the latch (see Diagram 1).
If you don’t have a plastic door latch on the top of the Air Cleaner position the LED Base close to the
front edge (see Diagram 2).
Note: Leave 4-1/2” above LED Base to allow for installation of the Air Cleaner Control to LED Base.
INSTALL THE AIR CLEANER CONTROL BASE
DIAGRAM 1 – Models with Door Latch
90-1364
LED BASE MOUNTING STEPS:
1. Remove filter assembly from Air Cleaner.
2. Position LED Base on top of Air Cleaner centered as shown in Diagrams 1 & 2.
3. Remove cover from LED Base.
4. Mark the two mounting hole locations and drill 1/8” diameter holes.
5. Assemble the LED Base to the Air Cleaner with screws provided.
6. Replace the cover on the LED Base.
DIAGRAM 2 – Models without Door Latch
Remove fi lter assembly from Air Cleaner Housing before drilling LED Base mounting holes.
CAUTION
RESEARCH PRODUCTS CORPORATION
P.O. Box 1467 • Madison, WI 53701-1467 • Phone: 608/257-8801 • Fax: 608/257-4357 • www.aprilairepartners.com
10007972 6.08
B2701049A
©2008 Research Products Corporation
Printed in U.S.A.
1
Remove the backplate from the Air
Cleaner Control, and install the backplate
at the desired location for the Air Cleaner
Control. Do not install the Air Cleaner
Control on supply ductwork.
2
Run a 5-conductor cable between the Air
Cleaner Control and the LED Base.
3
Run a 5-conductor cable between the
LED Base and the low voltage controls of
the HVAC equipment.
4
Remove the cover from the LED Base and
wire the Air Cleaner Control to the LED
Base as shown in Diagram 7. Replace
the Air Cleaner Control on the backplate.
5
Wire the LED Base to the HVAC
equipment as shown in Diagram 8.
Replace the cover on the LED Base.
OPTION 3 – INSTALL THE AIR CLEANER CONTROL NEAR THE HVAC SYSTEM
LED BASE
AIR CLEANER CONTROL
GSW
GF
C
R
BA
GSWGFC
R
BA
NOT USED
NOT USED
DIAGRAM 7 – Wiring the Air Cleaner Control to the LED Base
90-1330
R
FURNACE OR AIR
HANDLER
C
G
Y
W1
COOLING OR
COMPRESSOR
L1
L2
120
VAC
24
VAC
HEAT OR AUX.
HEAT
FAN
GSW
GF
C
R
DISCONNECT EXISTING WIRE FROM
FAN TERMINAL AND USE WIRE NUT
(FIELD SUPPLIED) TO CONNECT TO
GS WIRE FROM LED BASE
NEW WIRE
EXISTING
WIRE
LEGEND
WIRE NUT
BA
FROM THERMOSTAT
SEE NOTE FOR
HEAT PUMPS AND
RADIANT HEAT
SYSTEMS
NOT USED
LED BASE
NOTE: IF THERE IS NO AUXILIARY HEAT OR IF THERE IS ONLY RADIANT HEAT,
DO NOT WIRE THE EQUIPMENT TO THE W TERMINAL OF THE LED BASE,
AND JUMPER THE GF AND W TERMINALS ON THE LED BASE.
DIAGRAM 8 – Wiring the LED Base to the HVAC Equipment
90-1329
FIGURE 6
90-1369
2
1
3
4
5
4
1. Restore power to the HVAC equipment.
2. Set the thermostat mode to OFF and fan to AUTO.
3. The display on the Air Cleaner Control should look like Figure 8.
Verify that there is no activity in the “FILTERING” portion of the display.
4. Press the “Event Clean” button on the Air Cleaner Control.
Verify that the blower starts.
Verify that the “FILTERING” portion of the display sequences (Figure 9).
Verify that the LEDs on the LED base are sequencing on and off (Figure 10).
5. Press the “Event Clean” button again to cancel the operation.
6. Return the thermostat Mode and Fan to the desired setting.
Refer to the Owner’s Manual for details on the operation of the Air Cleaner Control.
Note: LED backlight is constantly on when C terminal is connected. LED backlight is on for ten seconds when batteries are used and a button is pushed.
START UP
FIGURE 8 FIGURE 10
LEDs will
sequence on / off
Filtering bars will sequence on /off
FIGURE 9
90-1322
90-1370
90-1322
OPTION 2 – AIR CLEANER CONTROL MOUNTED ON THE AIR CLEANER
R
FURNACE OR AIR
HANDLER
C
G
Y
W1
COOLING OR
COMPRESSOR
L1
L2
120
VAC
24
VAC
HEAT OR AUX.
HEAT
FAN
GSW
GF
C
R
DISCONNECT EXISTING WIRE FROM
FAN TERMINAL AND USE WIRE NUT
(FIELD SUPPLIED) TO CONNECT TO
GS WIRE FROM LED BASE
NEW WIRE
EXISTING
WIRE
LEGEND
WIRE NUT
BA
FROM THERMOSTAT
SEE NOTE FOR
HEAT PUMPS AND
RADIANT HEAT
SYSTEMS
NOT USED
LED BASE
NOTE: IF THERE IS NO AUXILIARY HEAT OR IF THERE IS ONLY RADIANT HEAT,
DO NOT WIRE THE EQUIPMENT TO THE W TERMINAL OF THE LED BASE,
AND JUMPER THE GF AND W TERMINALS ON THE LED BASE.
DIAGRAM 6 – Wiring the LED Base to the HVAC Equipment
90-1329
1
Run a 5-conductor cable between the LED Base and the low voltage controls of the HVAC equipment.
2
Remove the cover from the LED Base and wire to the low voltage controls of the HVAC equipment as
shown in Diagram 6.
3
Connect the supplied cable to the Air Cleaner Control and LED Base then slide the Air Cleaner Control
into place.
90-1368
FIGURE 4
1
2
90-1368
FIGURE 5
3
INSTALL THE AIR CLEANER CONTROL
SET UP
Jumper
FIGURE 7
90-1338
FILTER LIFE INDICATOR – SETTING THE REPLACEMENT FREQUENCY
Set the jumper on the back of the Air Cleaner Control
circuit board, as shown in Figure 7, to the desired
frequency for filter changes.
The factory default setting is OFF.
TABLE 1 – Filter Change Frequency
Jumper Position Filter Change Setting
OFF One calendar year (365 days)
A 6570 hours of use (9 months of continuous blower run time)
B 4380 hours of use (6 months of continuous blower run time)
C 2190 hours of use (3 months of continuous blower run time)
/