Vita EZ Mount for 4"x4" Arbor Post, 4" EZ Mount Arbor Post (4 pk), EZ Mount for 4"x4" Arbor Post (4-Pack), VA80440 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Vita EZ Mount for 4"x4" Arbor Post Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
4” / 5” EZ Mount Post for Arbors
A S S EMB LY INS T R UCTIONS
Please read through before starting installation.
Check Box
for These Contents
In the event of missing or defective parts please call our customer service department
at 1 800 282 9346 (Mon. to Fri. 8:00 AM to 5:00 PM EST).
V1.1/071020
1
1.
2.
3.
Removable Donut (2) 4in Part Number 11145 / 5in Part Number 11148
Pipe Anchor Assembly (1) Ø
1 5/8” x 26 1/8” - 11147
5/8” (16mm) Self-Augering Stainless Steel Screw (4) 20016
3
2
Tools You Will Need
· Sledge Hammer (5 or 10 lbs)
· Cordless Drill with Phillips Bit
· Spirit Level
· Adjustable Wrench
· Tape Measure
17 in [43.1cm]
9 1/8 in [23.2 cm]
Ø3 3/4 in [9.5cm] for 4” EZ Mount
Ø4 3/4 in [12.1cm] for 5” EZ Mount
Ø1 5/8 in
[4.1 cm]
www.wearevita.com
2
EZ Mount Post for Arbors
S T EP ONE
3
Using the instructions provided with your arbor, locate the center
of the four post and mark accordingly.
Remove the top outer donut to prevent damage while driving the
pipe into the ground. To remove, expand the two tabs at the bottom
of the donut and pull upwards.
Position the pipe anchor at the desired location and using a sledge
hammer, drive the anchor post into the ground 17 in [43.1cm].
Try to drive the pipe as level as possible. Using a spirit level, check
level every 6 in [15.2cm]. After about 12 in [30.5cm] deep the trajectory
of the pipe is typically established and you cannot manually pull the
pipe back into level.
Reinstall the top out donut and adjust the bottom and top donuts
to compensate for crooked pipe.
Repeat for all 4 posts.
1
2
2
3
4
4
17 in [43.1cm]
North America Toll Free Phone: 1 800 282 9346
www.wearevita.com
3
Slide the side panel over two of the pipe anchors as shown.
(Or in some cases, with a helper, slide the entire arbor assembly over
the 4 pipe anchors).
Fasten each of the post using the 5/8” (16mm) screws provided.
The screw should bite into the bottom donut as shown.
1
2
S T EP TWO
1
2
/