Remeha Avanta Plus Gas 310/610 Eco Pro Installation, User And Service Manual

Type
Installation, User And Service Manual
Great Britain
EN
Gas 310 ECO PRO -
Gas 610 ECO PRO
Installation, User
and Service
Manual
125467-05
EC declaration of conformity
The device complies with the standard type described in the EG
declaration of conformity. It was manufactured and commissioned in
accordance with European directives.
The original declaration of conformity is available from the
manufacturer.
Contents
1 Introduction ................................................................................................6
1.1 Symbols used .......................................................6
1.2 Abbreviations ........................................................6
1.3 Liabilities ...............................................................7
1.3.1 Manufacturer’s liability .............................................7
1.3.2 Installer’s liability .....................................................7
1.3.3 User’s liability ..........................................................7
2 Safety instructions and recommendations ..............................................9
2.1 Safety instructions ...............................................9
2.2 Recommendations ................................................9
3 Technical description ..............................................................................11
3.1 General description ............................................11
3.2 Homologations ....................................................11
3.2.1 Certifications .........................................................11
3.2.2 Equipment categories ...........................................12
3.2.3 Type plate .............................................................12
3.2.4 Factory test ...........................................................12
3.3 Main parts ............................................................13
3.3.1 Boiler type Gas 310 ECO PRO .............................13
3.3.2 Boiler type Gas 610 ECO PRO .............................14
3.3.3 System pump ........................................................14
3.3.4 Regulation of the water temperature .....................15
3.3.5 Protection against a shortage of water ..................15
3.3.6 Maximum temperature protection .........................15
3.3.7 Air differential pressure switch ..............................15
3.4 Technical specifications ....................................15
3.4.1 Boiler type Gas 310 ECO PRO .............................15
3.4.2 Boiler type Gas 610 ECO PRO .............................17
4 Installation ................................................................................................19
4.1 Regulations governing installation ...................19
4.2 Package list .........................................................19
4.2.1 Standard delivery ..................................................19
4.2.2 Accessories ...........................................................19
4.3 Installation options .............................................20
4.3.1 Transport ...............................................................20
160514 - 125467-05
1
4.3.2 Location of the boiler .............................................21
4.3.3 Main dimensions ...................................................26
4.4 Hydraulic connections .......................................28
4.4.1 Flushing the system ..............................................28
4.4.2 Connection of the heating circuit ...........................28
4.4.3 Connecting the condensate discharge pipe ..........29
4.5 Gas connection ...................................................30
4.6 Connections for the air and exhaust
pipes ....................................................................30
4.6.1 Classification .........................................................31
4.6.2 Outlets ...................................................................31
4.6.3 Lengths of the air/flue gas pipes ...........................32
4.6.4 Additional Directives ..............................................35
4.6.5 Connection of the combustion gas exhaust
pipe .......................................................................35
4.6.6 Connection of the air intake pipe ...........................36
4.7 Electrical connections ........................................36
4.7.1 Control unit ............................................................37
4.7.2 Recommendations ................................................38
4.7.3 Standard control PCB ...........................................38
4.7.4 Connecting the on/off control ................................40
4.7.5 Connecting modulating controller .........................40
4.7.6 Shutdown input .....................................................40
4.7.7 Release input ........................................................41
4.7.8 System pump ........................................................41
4.7.9 PC/Laptop connection ...........................................41
4.7.10 Connection possibilities for the PCB (SCU-
S05) .......................................................................42
4.8 Electrical diagram ...............................................47
4.9 Filling the system ...............................................47
4.9.1 Water treatment ....................................................48
4.9.2 Filling the siphon ...................................................48
4.9.3 Filling the system ..................................................49
5 Commissioning ........................................................................................50
5.1 Control panel .......................................................50
5.1.1 Functions of the keys ............................................50
5.1.2 Meaning of the symbols on the display .................50
5.2 Check points before commissioning ................51
5.2.1 Preparing the boiler for commissioning .................51
5.2.2 Gas circuit .............................................................52
5.2.3 Hydraulic circuit .....................................................52
5.2.4 Connections for the air and exhaust pipes ............52
5.2.5 Electrical connections ...........................................52
5.3 Commissioning the boiler ..................................52
5.4 Gas settings ........................................................53
5.4.1 Setting the air/gas ratio (Full load) ........................54
Contents
160514 - 125467-05
2
5.4.2 Setting the air/gas ratio (Part load) ......................55
5.5 Checks and adjustments after
commissioning ...................................................56
5.5.1 Finalizing work ......................................................56
5.6 Reading out measured values ...........................56
5.6.1 Reading the various current values .......................56
5.7 Changing the settings ........................................57
6 Switching off the boiler ............................................................................58
6.1 Installation shutdown .........................................58
6.2 Antifreeze protection ..........................................58
7 Checking and maintenance .....................................................................59
7.1 General ................................................................59
7.2 Standard checks .................................................59
7.2.1 Checking the hydraulic pressure ...........................60
7.2.2 Checking the ionization current .............................60
7.2.3 Check the water quality .........................................60
7.2.4 Checking the air supply connections and flue gas
discharge connections ..........................................60
7.2.5 Checking the gas filter for pollution .......................61
7.2.6 Checking combustion ............................................61
7.2.7 Check the air supply hose .....................................62
7.2.8 Check the dirt trap .................................................62
7.2.9 Check the air box ..................................................62
7.2.10 Check the air pressure differential switch PS ........63
7.2.11 Check the gas leakage control VPS ......................64
7.2.12 Check the minimum gas pressure switch
Gps ........................................................................66
7.3 Specific maintenance operations ......................66
7.3.1 Clean the fan and the venturi ................................67
7.3.2 Clean and inspect the non-return valve ................68
7.3.3 Replacing the ionization/ignition electrode ............68
7.3.4 Cleaning the gas filter ...........................................69
7.3.5 Cleaning the burner ...............................................70
7.3.6 Clean the burner area ...........................................70
7.3.7 Checking the heat exchanger ...............................71
7.3.8 Cleaning the condensate collector ........................72
7.3.9 Cleaning the siphon ..............................................72
7.3.10 Assembling the boiler ............................................73
7.3.11 Put the boiler back into operation ..........................73
8 Troubleshooting .......................................................................................74
8.1 Shutdowns and lock-outs ..................................74
8.1.1 General .................................................................74
8.1.2 Blocking .................................................................74
8.1.3 Lock out .................................................................74
160514 - 125467-05
3
8.1.4 Error memory ........................................................75
9 Spare parts ................................................................................................76
9.1 General ................................................................76
10 Checklists .................................................................................................77
10.1 Checklist for commissioning .............................77
10.2 Checklist for periodic inspection and
maintenance ........................................................78
Contents
160514 - 125467-05
4
160514 - 125467-05
5
1 Introduction
1.1 Symbols used
In these instructions, various danger levels are employed to draw the
user’s attention to particular information. In so doing, we wish to
safeguard the user’s safety, obviate hazards and guarantee correct
operation of the appliance.
DANGER
Risk of a dangerous situation causing serious physical
injury.
WARNING
Risk of a dangerous situation causing slight physical
injury.
CAUTION
Risk of material damage.
Signals important information.
¼Signals a referral to other instructions or other pages in the
instructions.
1.2 Abbreviations
4 3CE: Collective conduit for sealed boiler
4 Central heating: Central heating
4 PCU: Primary Control Unit - PCB for managing burner operation
4 SU: Safety Unit - Safety PCB
4 PSU: Parameter Storage Unit - Parameter storage for PCBs
PCU and SU
4 SCU: Secondary Control Unit - Extended control PCB
1. Introduction
Gas 310 ECO PRO - Gas 610 ECO PRO
6
160514 - 125467-05
1.3 Liabilities
1.3.1. Manufacturer’s liability
Our products are manufactured in compliance with the requirements
of the various applicable European Directives. They are therefore
delivered with [ marking and all relevant documentation.
In the interest of customers, we are continuously endeavouring to
make improvements in product quality. All the specifications stated in
this document are therefore subject to change without notice.
Our liability as the manufacturer may not be invoked in the following
cases:
4 Failure to abide by the instructions on using the appliance.
4 Faulty or insufficient maintenance of the appliance.
4 Failure to abide by the instructions on installing the appliance.
1.3.2. Installer’s liability
The installer is responsible for the installation and inital start up of the
appliance. The installer must respect the following instructions:
4 Read and follow the instructions given in the manuals provided
with the appliance.
4 Carry out installation in compliance with the prevailing legislation
and standards.
4 Perform the initial start up and carry out any checks necessary.
4 Explain the installation to the user.
4 If a maintenance is necessary, warn the user of the obligation to
check the appliance and maintain it in good working order.
4 Give all the instruction manuals to the user.
1.3.3. User’s liability
To guarantee optimum operation of the appliance, the user must
respect the following instructions:
4 Read and follow the instructions given in the manuals provided
with the appliance.
4 Call on qualified professionals to carry out installation and initial
start up.
4 Get your installer to explain your installation to you.
4 Have the required checks and services done by a qualified
professional.
4 Keep the instruction manuals in good condition close to the
appliance.
Gas 310 ECO PRO - Gas 610 ECO PRO
1. Introduction
160514 - 125467-05
7
This appliance is not intended to be used by persons (including
children) whose physcial, sensory or mental capacity is impaired or
persons with no experience or knowledge, unless they have the
benefit, through the intermediary of a person responsible for their
safety, of supervision or prior instructions regarding use of the
appliance. Care should be taken to ensure that children do not play
with the appliance.
If the mains lead is damaged it must be replaced by the original
manufacturer, the manufacturer’s dealer or another suitably skilled
person to prevent hazardous situations.
1. Introduction Gas 310 ECO PRO - Gas 610 ECO PRO
8
160514 - 125467-05
2 Safety instructions and
recommendations
2.1 Safety instructions
DANGER
If you smell gas:
1. Do not use a naked flame, do not smoke, do not
operate electrical contacts or switches ( doorbell,
light, motor, lift, etc..).
2. Shut off the gas supply.
3. Open the windows.
4. Report any leaks immediately.
5. Trace possible leaks and seal them immediately.
6. If the gas leak is before the gas meter, contact the
gas supplier.
DANGER
If you smell flue gases:
1. Switch the appliance off.
2. Open the windows.
3. Report any leaks immediately.
4. Trace possible leaks and seal them immediately.
2.2 Recommendations
WARNING
4 Installation and maintenance of the boiler must be
carried out by a qualified professional in compliance
with prevailing local and national regulations.
4 When working on the boiler, always disconnect the
boiler from the mains and close the main gas inlet
valve.
4 After maintenance or repair work, check all
installations to ensure that there are no leaks.
CAUTION
The boiler must be installed in a frost-free environment.
Store this document in the document wallet on the inside
of the boiler casing (Underneath the instrument panel).
Gas 310 ECO PRO - Gas 610 ECO PRO 2. Safety instructions and recommendations
160514 - 125467-05
9
Casing components
Only remove the casing for maintenance and repair operations. Put
the casing back in place after maintenance and repair operations.
Instructions stickers
The instructions and warnings affixed to the appliance must never be
removed or covered and must remain legible during the entire lifespan
of the appliance. Immediately replace damaged or illegible
instructions and warning stickers.
Modifications
Modifications may only be made to the boiler after the written
permission of Remeha to do so.
2. Safety instructions and recommendations Gas 310 ECO PRO - Gas 610 ECO PRO
10
160514 - 125467-05
3 Technical description
3.1 General description
Floor-standing high efficiency gas boiler
4 High efficiency heating.
4 Low pollutant emissions.
4 Heat exchanger made of cast aluminium sections.
4 Transport wheels as standard.
4 Left or right-hand version of the water and flue gas side
connections possible.
4 Separable for assembly in boiler room.
4 HMI Gas 310/610 ECO PRO control panel.
Boiler type:
4 Type Gas 310 ECO PRO-285
4 Type Gas 310 ECO PRO-355
4 Type Gas 310 ECO PRO-430
4 Type Gas 310 ECO PRO-500
4 Type Gas 310 ECO PRO-575
4 Type Gas 310 ECO PRO-650
Boiler type:
4 Type Gas 610 ECO PRO-570
4 Type Gas 610 ECO PRO-710
4 Type Gas 610 ECO PRO-860
4 Type Gas 610 ECO PRO-1000
4 Type Gas 610 ECO PRO-1150
4 Type Gas 610 ECO PRO-1300
3.2 Homologations
3.2.1. Certifications
CE identification no
PIN 0063CL3613
NOx classification
5 (EN 15420)
Type of connection
(Flue gas outlet)
B
23
, B
23P
, C
33
, C
53
, C
63
, C
83
, C
93
Gas 310 ECO PRO - Gas 610 ECO PRO 3. Technical description
160514 - 125467-05
11
3.2.2. Equipment categories
Gas category Gas type Connection pressure (mbar)
I
2H
Gas H (G20) 20
The boiler is preset in the factory to operate on natural gas G20 (Gas
H).
3.2.3. Type plate
The identification plate is located behind the boiler casing on the
frame, near the syphon connection. It contains the boiler serial
number and important boiler specifications, such as the model and
the gas category.
3.2.4. Factory test
Before leaving the factory, each boiler is set for optimum performance
and tested to check the following items:
4 Electrical safety
4 Adjustment (CO
2
)
4 Water tightness
4 Gas tightness
4 Parameter settings
T003475-F
3. Technical description Gas 310 ECO PRO - Gas 610 ECO PRO
12
160514 - 125467-05
3.3 Main parts
3.3.1. Boiler type Gas 310 ECO PRO
T004014-E
2
1
3
4
5
6
7
8
27
40
28
29
30
32
34
31
33
35
36
37
38
39
11
12
14
13
15
16
17
18
19
20
22
24
26
21
23
25
10
9
1
Flow connection
(1)
21
Return sensor
2
Air differential pressure switch
22
Gas filter
3
Flue gas discharge pipe
23
Type plate
4
Return connection
24
Siphon
5
Outlet for measuring combustion gases
25
Transport wheels
6
Flue gas thermostat (Accessory)
26
Jacking bolt
7
Condensate collector sealant cap
27
Gas connection
8
Pivoting castor
28
Gas pressure measurement point
9
Jacking bolt
29
Control panel
10
Base frame
30
Location for optional features or a control unit
11
Second return connection (Accessory)
31
Pressure measurement point
12
Heat exchanger insulation kit (Accessory)
32
Sight glass
13
Boiler casing
33
Non-return valve
14
Air inlet
34
Fan
15
Burner
35
Extension piece
16
Adapter
36
Venturi
17
Ignition/ionization electrode
37
Gas block
18
Heat exchanger
38
Air inlet hose
19
Inspection hatch
39
Document holder
20
Heat exchanger sensor
40
Ignition transformer
(1) ¼For more details about the devices in the flow pipe, please see "Connection of the heating circuit", page 28
Gas 310 ECO PRO - Gas 610 ECO PRO 3. Technical description
160514 - 125467-05
13
3.3.2. Boiler type Gas 610 ECO PRO
T004015-G
1
3
4
5
2
6
7
8
27
28
29
30
32
34
31
33
35
36
14
13
15
16
17
18
19
20
22
24
26
21
23
25
10
41
11
12
9
37
38
39
40
1
Flow connection
(1)
21
Return sensor
2
Air differential pressure switch
22
Gas filter
3
Flue gas discharge pipe
23
Type plate
4
Return connection
24
Siphon
5
Outlet for measuring combustion gases
25
Transport wheels
6
Flue gas thermostat (Accessory)
26
Jacking bolt
7
Condensate collector sealant cap
27
Gas connection
8
Pivoting castor
28
Gas pressure measurement point
9
Jacking bolt
29
Control panel
10
Base frame
30
Location for optional features or a control unit
11
Heat exchanger insulation kit (Accessory)
31
Pressure measurement point
12
Flue gas collector
32
Sight glass
13
Boiler casing
33
Non-return valve
14
Air inlet
34
Fan
15
Burner
35
Extension piece
16
Adapter
36
Venturi
17
Ignition/ionization electrode
37
Gas block
18
Heat exchanger
38
Air inlet hose
19
Inspection hatch
39
Document holder
20
Heat exchanger sensor
40
Ignition transformer
41
Second return connection (Accessory)
(1) ¼For more details about the devices in the flow pipe, please see "Connection of the heating circuit", page 28
3.3.3. System pump
The boiler does not have a built-in pump. A system pump can be
installed on the connector of the standard control PCB. This can be
an on/off pump or a modulating pump (with 0 - 10 V control).
3. Technical description
Gas 310 ECO PRO - Gas 610 ECO PRO
14
160514 - 125467-05
¼For more information on controlling a modulating pump, See
paragraph: "Electrical connections", page 36.
Parameters p43 and p44 are used to modify the pump settings.
¼See the Installation and service manual HMI GAS 310/610 ECO
PRO for comprehensive operating instructions. This includes
information about changing and reading parameters, the meaning of
fault codes and deleting the failure memory.
3.3.4. Regulation of the water temperature
The boiler is equipped with electronic temperature control based on
flow, return, and boiler block temperature sensors. The flow
temperature can be set between 20°C and 90°C. The boiler reduces
its power when the set outlet-temperature is attained. The cutout
temperature is the set heating outlet-temperature + 5 °C.
3.3.5. Protection against a shortage of water
The boiler is fitted with a safety device to prevent the shortage of water
based on temperature measurements (Temperature difference
between flow and return). If ΔT = 25 K is reached (factory setting),
the boiler reduces its output by modulating to remain in operation as
long as possible. If ΔT ≥ 25 K the boiler goes into part load. If ΔT >
25 + 5 K the boiler goes into a normal control stop (blocking).
3.3.6. Maximum temperature protection
The maximum protection switches the boiler off if the water
temperature is too high (110°C) and locks it on the control box (Fixed
value, cannot be modified). Once the fault has been rectified, the
boiler can be reset by pressing the J button for 2 seconds.
3.3.7. Air differential pressure switch
Before a start and when the boiler is in operation, the air pressure
differential switch PS measures the difference in pressure between
the measuring points at the rear of the heat exchanger p
+
and the air
box p
-
. If the pressure difference is greater than 6 mbar, then the boiler
will lock out. Once the fault has been rectified, the boiler can be reset
by pressing the J button for 2 seconds.
3.4 Technical specifications
3.4.1. Boiler type Gas 310 ECO PRO
Gas 310 ECO PRO - Gas 610 ECO PRO
3. Technical description
160514 - 125467-05
15
Boiler type GAS 310 ECO PRO Unit 285 355 430 500 575 650
General
Number of sections - - 5 6 7 8 9 10
EC indentification no. PIN
0063CL3613
Input control Adjustable
Modulating, Start/Stop, 0 - 10 V
Nominal output (Pn)
(80/60 °C)
minimum
maximum
(1)
kW
51
261
65
327
79
395
92
461
106
530
119
601
Nominal output (Pn)
(50/30 °C)
maximum
(1)
kW 279 350 425 497 574 651
Nominal input(Qn)
(Hs)
minimum
maximum
(1)
kW
60
295
75
369
96
445
105
520
121
598
135
677
Nominal input (Qn)
(Hi)
minimum
maximum
(1)
kW
54
266
68
333
82
402
95
469
109
539
122
610
Full load water efficiency (Hi) (80/60 °C) % 98.0 98.1 98.2 98.3 98.4 98.5
Full load water efficiency (Hi) (50/30 °C) % 104.8 105.2 105.6 106.0 106.4 106.8
Low load water efficiency (Hi)
(Tr = 60 °C)
% 94.7 95.3 95.8 96.3 96.8 97.3
Annual efficiency (DIN 4702, Part 8) % 109.6 109.5 109.4 109.3 109.2 109.1
Part load efficiency 92/42 EEG (Tr = 30 °C) % 109.2 109.0 108.8 108.6 108.3 108.1
Data on the gases and combustion gases
Gas consumption G20 (Gas H)
minimum
maximum
m
3
/h
5.7
28.1
7.2
35.2
8.7
42.5
10.1
49.6
11.5
57.0
12.9
64.6
Gas inlet pressure G20 (Gas H)
minimum
maximum
mbar
17
30
17
30
17
100
17
100
17
100
17
30
Flue gas losses % 2.3 2.3 2.3 2.3 2.3 2.3
NOx-Emission per year (BREEAM)
(EN 15420)
mg/kWh 33 35 32 29 36 26
Maintenance consumption (EN15420)
(Without heat exchanger insulation kit)
(∆T = 30 K)
(2)
W 571 591 611 630 650 670
% 0.21 0.18 0.15 0.13 0.12 0.11
Mass flue gas flow rate
minimum
maximum
kg/h
91
448
114
560
138
676
160
789
183
907
205
1026
Flue gas temperature
minimum
maximum
°C
30
80
Maximum residual fan duty for flue gas
Pa 130 120 130 150 150 150
Characteristics of the heating circuit
Water content - l 49 60 71 82 93 104
Water operating pressure minimum bar 0.8
Water operating pressure (PMS) maximum bar 7
Water temperature maximum °C 110
Operating temperature
minimum
maximum
°C
20
90
Factory setting 80
Water resistance (∆T = 20K)
mbar 113 110 120 110 125 130
kPa 11.3 11 12 11 12.5 13.0
Water resistance (∆T = 11K)
mbar 374 364 397 364 413 435
kPa 37.4 36.4 39.7 36.4 41.3 43.5
Electrical characteristics
Power supply voltage
VAC/Hz 230/50
Fuse (230 VAC)
F2 Circuit-breaker AT 10
F1 control PCB AT 2
Power consumption - Full load maximum W 279 334 426 543 763 723
(1) Factory setting
(2) ∆T = Boiler temp - Ambient temperature
(3) For a room sealed operation
3. Technical description Gas 310 ECO PRO - Gas 610 ECO PRO
16
160514 - 125467-05
Boiler type GAS 310 ECO PRO Unit 285 355 430 500 575 650
Power consumption - Part load maximum W 46 46 58 61 62 55
Power consumption - Standby maximum W 6 6 6 6 6 7
Electrical protection index IP
X1B
(3)
Other characteristics
Weight (empty) Total kg 364 398 433 495 531 568
Acoustic level at 1 metre
(3)
dB(A) 61 61 65 65 65 65
Ambient temperature maximum °C 40
(1) Factory setting
(2) ∆T = Boiler temp - Ambient temperature
(3) For a room sealed operation
3.4.2. Boiler type Gas 610 ECO PRO
Boiler type
GAS 610 ECO PRO Unit 570 710 860 1000 1150 1300
General
Number of sections - - 2x5 2x6 2x7 2x8 2x9 2x10
EC indentification no. PIN
0063CL3613
Input control Adjustable
Modulating, Start/Stop, 0 - 10 V
Nominal output (Pn)
(80/60 °C)
minimum
maximum
(1)
kW
69
522
87
654
123
790
122
922
148
1060
158
1202
Nominal output (Pn)
(50/30 °C)
maximum
(1)
kW 558 700 850 994 1148 1303
Nominal input(Qn)
(Hs)
minimum
maximum
(1)
kW
80
590
101
738
142
890
141
1040
170
1196
180
1354
Nominal input (Qn)
(Hi)
minimum
maximum
(1)
kW
72
532
91
666
128
804
127
938
170
1078
162
1220
Full load water efficiency (Hi) (80/60 °C) % 98.0 98.1 98.2 98.3 98.4 98.5
Full load water efficiency (Hi) (50/30 °C) % 104.8 105.2 105.6 106.0 106.4 106.8
Low load water efficiency (Hi)
(Tr = 60 °C)
% 94.7 95.3 95.8 96.3 96.8 97.3
Annual efficiency (DIN 4702, Part 8) % 109.6 109.5 109.4 109.3 109.2 109.1
Part load efficiency 92/42 EEG (Tr = 30 °C) % 109.2 109.0 108.8 108.6 108.3 108.1
Data on the gases and combustion gases
Gas consumption G20 (Gas H)
minimum
maximum
m
3
/h
7.6
56.2
9.6
70.4
13.5
85.0
13.4
99.2
16.2
114.0
17.2
129.2
Gas inlet pressure G20 (Gas H)
minimum
maximum
mbar
17
30
17
30
17
100
17
100
17
100
17
30
Flue gas losses % 2.3 2.3 2.3 2.3 2.3 2.3
NOx-Emission per year (BREEAM)
(EN 15420)
mg/kWh 33 35 32 29 36 26
Maintenance consumption (EN15420)
(Without heat exchanger insulation kit)
(∆T = 30 K)
(2)
W 1142 1182 1222 1260 1300 1340
% 0.21 0.18 0.15 0.13 0.12 0.11
Mass flue gas flow rate
minimum
maximum
kg/h
182
896
228
1120
276
1352
320
1578
366
1814
410
2052
Flue gas temperature
minimum
maximum
°C
30
80
Maximum residual fan duty for flue gas
Pa 130 120 130 130 130 150
Characteristics of the heating circuit
(1) Factory setting
(2) ∆T = Boiler temp - Ambient temperature
(3) For a room sealed operation
Gas 310 ECO PRO - Gas 610 ECO PRO 3. Technical description
160514 - 125467-05
17
Boiler type GAS 610 ECO PRO Unit 570 710 860 1000 1150 1300
Water content - l 98 120 142 164 186 208
Water operating pressure minimum bar 0.8
Water operating pressure (PMS) maximum bar 7
Water temperature maximum °C 110
Operating temperature
minimum
maximum
°C
20
90
Factory setting 80
Water resistance (∆T = 20K)
mbar 113 110 120 110 125 130
kPa 11.3 11 12 11 12.5 13
Water resistance (∆T = 11K)
mbar 374 364 397 364 413 435
kPa 37.4 36.4 39.7 36.4 41.3 43.5
Electrical characteristics
Power supply voltage
VAC/Hz 230/50
Fuse (230 VAC)
F2 Circuit-breaker AT 10
F1 control PCB AT 2
Power consumption - Full load maximum W 558 668 852 1086 1526 1446
Power consumption - Part load maximum W 92 92 116 122 124 110
Power consumption - Standby maximum W 12 12 12 12 12 14
Electrical protection index IP
X1B
(3)
Other characteristics
Weight (empty) Total kg 707 771 837 957 1025 1095
Acoustic level at 1 metre
(3)
dB(A) 64 64 68 68 68 68
Ambient temperature maximum °C 40
(1) Factory setting
(2) ∆T = Boiler temp - Ambient temperature
(3) For a room sealed operation
3. Technical description Gas 310 ECO PRO - Gas 610 ECO PRO
18
160514 - 125467-05
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84

Remeha Avanta Plus Gas 310/610 Eco Pro Installation, User And Service Manual

Type
Installation, User And Service Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI