
Step 10.
Secure to the wall using 1 x appropriate screw
through each L Brackets (FF).
Step 9.
Using points a, b & c adjust the Cabinet to suit.
Step 11.
Screw into any side units using the provided
2 x 30mm screws (K) to secure the unit.
Screw just to the rear of the hinge plate then
place a cover cap on the head to conceal it.
Step 9a.
Rotate the screw clockwise
to move the cabinet up.
Anti-clockwise for down.
Step 9b.
Adjust the depth
using centre screw.
Step 9c.
Screw the red screw until it
touches the plate to lock
in position.
Hanging
Bracket
viewed though
Back Panel
b
C
c
a
a
b
Detail B
Screws for xing to walls are not provided
as these vary depending on your wall
material and construction. Ensure
appropriate xings
for wall constructions are used.
Step 12.
Attach hinge mounting plates on to
end panels (B) in locations shown
using Screws which are already
positioned within the Hinge Plates.
Hinge side to be mounted in accordance
to customer kitchen plan.
Hinge Plates
126mm
126mm
94mm
94mm
B
from base
from top
K
For Internal Use: FI.WR.INS.039_WKIN00129_WALL_600_BlrHsg_Rev5.indd
Page 5
WALL UNIT
600 & 600 Tall
Boiler Housing
Assembly Guide