Cumberland MOHD Double Owner's manual

  • Hello! I am an AI chatbot trained to assist you with the Cumberland MOHD Double Owner's manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Date: 01-01-15 PNEG-964
Instructions
1004 East Illinois Street • Assumption, IL 62510 • 1-217-226-4421
PNEG-964
Page 1 of 3
Printed in the U.S.A.
Copyright © 2015 by The GSI Group, LLC
www.gsiag.com CN-315800
MOHD Double Install
Double Shutter Motor Kit Assembly Instructions
Mount Return Spring
1. Drill 1/8" hole 1-1/4" left of each connecting bar in flat edge of frame. (See Figure 1.)
2. Attach the return springs from the 1/8" holes in the frame to the pre-drilled 1/8" holes in the connecting
bars, using an “S” hook on both ends of the return springs. (See Figure 3 on Page 2.)
Mount Assembly
1. Attach motor mount bracket to the back of the motor using four (4) #8-32 x 3/8" THS screws.
(See Figure 2 on Page 2.)
2. Remove motor arm. Install the stop bracket as shown to the top of the motor using four (4)
MS #8-32 x 3/8" THS Screws. (See Figure 4 on Page 3.)
3. Re-install the motor arm onto the shaft and tighten
4. Center the motor mount bracket on the frame and attach to frame and center bar using three (3)
#8-18 x 1/2" self-tapping screws and flat washers. (See Figure 1.)
Figure 1 Complete Assembly
Ref # Description Ref # Description
ADrill 1/8" Hole GMotor
Arm
B Return Spring HLead Chain
CConnecting Bar IStop Bracket
DCenter Bar JMotor Mount Bracket
EFrame KYoke Chain
F Motor
Page 2 of 3 PNEG-964
MOHD Double Install
Mount Assembly (Continued)
Figure 2 Motor Mount Bracket
Yoke Chain Installation
1. Measure 34" down from the top of the frame and drill a 1/8" hole into the flat edge on each side of
the frame. (See Figure 1 on Page 1.)
Figure 3 Side View of Connecting Bar
2. Measure up 13" from the top of the motor and drill a 1/8" hole into the center of the center bar.
(See Figure 1 on Page 1.)
3. Measure down 29" from the top of the frame and drill a 1/8" hole through both connecting bars.
(See Figure 1 on Page 1 and Figure 3.)
4. Attach the yoke chain from the 1/8" holes in frame to 1/8" holes in the connecting bars using “S”
hooks. Then attach chain from connecting bars to the 1/8" hole in the center bar using “S” hooks.
F
L
J
Ref # Description
FMotor
J Motor Mount Bracket
L#8-32 x 3/8" THS Screws
Ref # Description
ADrill 1/8'' hole, 1/8'' in and align
with center of blade trough.
B Connecting Bar
PNEG-964 Page 3 of 3
MOHD Double Install
Lead Chain Installation
1. Connect the lead chain from the center bar to the motor arm using “S” hooks.
(See Figure 1 on Page 1.)
2. Move motor arm counterclockwise to full open position. Adjust blades for full open position by
adjusting lead chain to “S” hook at motor arm. (See Figure 4 and Figure 5.)
Figure 4 Motor Front Figure 5 Full Open Shutter Position
GA
B
C
EF
D
Ref # Description
AMotor
B Motor Arm
CStop Bracket
D Full Open Position
EMotor Mount Bracket
F #8-32 x 3/8" THS Screws
GChain
H Full Open Stop
/