(3) Select the schedule data and click [Assign].
The schedule is now assigned.
Conrmtheschedule4.
(1)Selectapaneltoconrmtheschedule.
Click while holding down [Ctrl] or [Shift] to select multiple panels at the same time.
(2) Click
.
The [Distribute Settings] dialog box appears.
(3) Set the distribution date and time.
“Distribute Now” option button •
In the PUSH type distribution, select this option to
distribute the schedule after the procedure (7) is
completed. This option is not available in PULL
type distribution.
“Distributeatthespecieddate_time”optionbutton •
Select this option to distribute the schedule at a
specieddateandtime.
In PULL type distribution, the distribution will start
atthetimeoftherstaccessfromtheviewerPC
afterthespecieddateandtime.
(4) Set the distribution options.
“Turn ON Viewer PC before starting distribution” •
check box
Check this box to turn on the viewer PC if it is not
turned on before starting the schedule distribution.
This option is not available in PULL type distribution.
“Turn OFF Viewer PC after distribution” check box •
Check this box to turn off the viewer PC after the distribution is complete.
(5) Select whether to re-distribute the contents distributed in the past to the viewer PC.
Checkthe“DistributeonlydifferencesfromcontentlesonViewerPC”checkboxtodistribute
onlythecontentsyettobedistributed(theleswithdifferentnames,creationdates,datasizes,
etc.) and not to distribute the contents that have already been distributed.
(6) Check the “Merge this schedule with Viewer PC schedule” check box to add this schedule to the
schedule already existing on the viewer PC. If this check box is not checked, the schedule of the
viewer PC is overwritten with the schedule to be distributed.
(7) Click [OK].
Thescheduleisnowconrmed.
Conrmedschedulesaremarkedwiththeconrmed
sign (
).
TIPS
Check in the [Distribution Status (Delivery)] to see if the distribution is completed properly. (p.20)•
Oncethedistributionisconrmed,thetimetableortheprogramcannotbeedited.Cancelthe•
conrmationrsttoeditit.(Tocancelconrmationsoftimetablesorprogramswhicharewaitingfor
distribution or being distributed, cancel them in [Distribution Status (Delivery)]. (p.20))
Distribution of schedules and programs may take some time. Even in the simultaneous distribution to •
multiple panels, the data is actually sent sequentially. For this reason, there may be some time difference
in schedule and program distribution.
Old schedules are no longer required after new schedules have been sent. Unnecessary schedules and •
their associated content will be automatically deleted the next time SHARP Digital Signage Software
Client Scheduler starts.
The schedule data of the past is not distributed. Only the schedule data for today and onward is distributed.•