Preface, Contents
Advanced PC Configuration -
Introduction
1
Getting Started
Configured Mode
2
PG Operation
3
Additional Functions
4
Configuring the OPC Server
5
Using the CP 1616 as a
PROFINET IO Controller/Device
6
Examples
Industrial Ethernet
7
PROFIBUS-DP
8
Unspecified S7 Connection
9
SNMP
10
PROFINET
11
Tools
Station Configuration Editor
12
NCM PC
13
PC Station Wizard
14
Symbol File Configurator
15
Configuration Console
16
OPC Scout
17
DCOM Settings
18
Appendix
SIMATIC NET
Commissioning PC Stations
- Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Manual
2
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Classification of the Safety-Related Notices
This manual contains notices which you should observe to ensure your own
personal safety, as well as to protect the product and connected equipment. These
notices are highlighted in the manual by a warning triangle and are marked as
follows according to the level of danger:
!
Danger
indicates that death or severe personal injury will result if proper precautions are
not taken.
!
Warning
indicates that death or severe personal injury can result if proper precautions are
not taken.
!
Caution
with warning triangle indicates that minor personal injury can result if proper
precautions are not taken.
Caution
without warning triangle indicates that damage to property can result if proper
precautions are not taken.
Notice
indicates that an undesirable result or status can occur if the relevant notice is
ignored.
Note
highlights important information on the product, using the product, or part of the
documentation that is of particular importance and that will be of benefit to the
user.
3
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Trademarks
SIMATICR, SIMATIC HMIR and SIMATIC NETR are registered trademarks of
SIEMENS AG.
Third parties using for their own purposes any other names in this document which
refer to trademarks might infringe upon the rights of the trademark owners.
Safety Instructions Regarding your Product:
Before you use the product described here, read the safety instructions below
thoroughly.
Qualified Personnel
Only qualified personnel should be allowed to install and work on this equipment.
Qualified persons are defined as persons who are authorized to commission, to
ground, and to tag circuits, equipment, and systems in accordance with establis-
hed safety practices and standards.
Correct Usage of Hardware Products
Note the following
!
Warning
This device and its components may only be used for the applications described in
the catalog or the technical description, and only in connection with devices or
components from other manufacturers which have been approved or
recommended by Siemens.
This product can only function correctly and safely if it is transported, stored, set
up, and installed correctly, and operated and maintained as recommended.
Before you use the supplied sample programs or programs you have written
yourself, make certain that no injury to persons nor damage to equipment can
result in your plant or process.
EU Directive: Do not start up until you have established that the machine on which
you intend to run this component complies with the directive 89/392/EEC.
Correct Usage of Software Products
Note the following
!
Warning
This software may only be used for the applications described in the catalog or the
technical description, and only in connection with software products, devices, or
components from other manufacturers which have been approved or
recommended by Siemens.
Before you use the supplied sample programs or programs you have written
yourself, make certain that no injury to persons nor damage to equipment can
result in your plant or process.
4
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Prior to Startup
Before putting the product into operation, note the following:
Caution
Before installing and starting the module, read the instructions in the
corresponding documentation. For ordering data of the documentation, please
refer to catalogs or contact your local Siemens representative.
We have checked the contents of this manual for agreement with the
hardware and software described. Since deviations cannot be precluded
entirely, we cannot guarantee full agreement. However, the data in this
manual are reviewed regularly and any necessary corrections included in
subsequent editions. Suggestions for improvement are welcomed.
DisclaimerCopyright E Siemens AG 2001-2005 All rights reserved
The reproduction, transmission or use of this document or its contents is not
permitted without express written authority. Offenders will be liable for
damages. All rights, including rights created by patent grant or registration of
a utility model or design, are reserved.
Siemens AG
Automation and Drives
Industrial Communication
Postfach 4848, D-90327 Nürnberg
Subject to technical change.
Siemens Aktiengesellschaft G79000-G8976-C156-07
5
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
This manual...
... supports you when commissioning your SIMATIC NET PC modules in a PC
station and helps you to use them successfully.
... introduces all the tools made available by the SIMATIC NET software for solving
your communication tasks.
... along with the OPC documentation on the SIMATIC NET PC / Windows CD
answers your questions on all aspects of communication:
Project engineering /
commissioning
Examples
OPC from A to Z
You will find tools for
every situation here:
S Detailed OPC
description
S Extensive sample
programs
S Commissioning:
how to go about it
S General
information on PC
tools
S Functions of NCM
PC
S Configuring the
OPC Server
Manual
Commissioning PC
stations
OPC Documentation
“Industrial
Communication with PG/PC”
S OPC application
with
communication
over Ethernet.
S OPC application
with access to a
DP master system
S PROFInet
applications
S SNMP
This manual...
6
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Among other things, this release includes the following new functions:
S Using the CP 1616 as a PROFINET IO Controller/Device
The manual now includes a detailed description of how the CP 1616 can be
configured as a PROFINET IO controller and device.
The Documentation in the “S7-CPs / NCM S7” Documentation Package and on
the Internet
You can order this manual along with other documents in a manual package.
You will find the current version of the manual on the Internet at:
http://www4.ad.siemens.de/view/cs/de/13542666
Additional Information on SIMATIC S7 and STEP 7
The documentation on SIMATIC S7 and STEP 7 contains additional information on
the STEP 7 basic software of the SIMATIC automation system. You can obtain
these from your local Siemens office.
Validity of this Manual
The information in this manual applies to
S Version 5.3 SP1 and higher of the project engineering software SIMATIC NCM
PC / STEP 7 with the NCM S7 option;
S CD 11/2003 and higher from SIMATIC NET
This manual...
7
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Symbols used in this manual
This symbol appears in the margin to draw your attention to useful tips.
This symbol highlights particularly relevant literature.
Passages marked with this symbol indicate that there is useful information you
should refer to in the basic help of STEP 7.
This symbol indicates that detailed help is available in the context-sensitive help.
You can display this with the F1 key or by clicking on the “Help” button in the
relevant dialog.
Conventions
References to other manuals and documentation are indicated by numbers in
slashes /.../. These numbers refer to the titles of manuals listed in the References
section of the Appendix.
F1
Contents
8
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Contents
This manual... 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Contents 8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1 Welcome to Advanced PC Configuration 13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1 A New Concept for Your Benefit 13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2 PC Stations in SIMATIC 15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.3 A Brief Introduction to Tools and Utilities 18. . . . . . . . . . . . . . . . . . . . . . . . .
1.4 Guide to Installation and Commissioning 19. . . . . . . . . . . . . . . . . . . . . . . .
1.4.1 PG Operation or Configured Mode - Considerations 19. . . . . . . . . . . . . .
1.4.2 Commissioning for PG Operation - Overview 21. . . . . . . . . . . . . . . . . . . .
1.4.3 Commissioning for Configured Mode - Overview 22. . . . . . . . . . . . . . . . .
Getting Started
2 Getting Started “Configured Mode” 26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1 Steps in Creating Project Engineering Data 27. . . . . . . . . . . . . . . . . . . . . .
2.2 Steps for Initial Configuration 34. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2.1 Case a) Initial configuration using remote configuration with STEP 7 /
NCM PC 35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2.2 Case b) Initial configuration with XDB file 37. . . . . . . . . . . . . . . . . . . . . . . .
2.2.3 Initial configuration without XDB file 39. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 Getting Started “PG Operation” 41. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.1 Configuration for PG Operation - Programming Device (PG/PC) 42. . . .
3.2 Configuration for PG Operation - HMI Stations 44. . . . . . . . . . . . . . . . . . .
4 Using Additional Functions - Special Features to Note 49. . . . . . . . . . . . . . . . . . .
4.1 Checking the Configuration and Diagnostics 49. . . . . . . . . . . . . . . . . . . . .
4.2 Testing with the OPC Scout 49. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.1 Detecting Errors in Communication with the OPC Scout 50. . . . . . . . . . .
4.3 Further Functions / Special Features 52. . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.1 Adopting the Project Engineering and Symbols from PROFINET iMap and
SIMOTION Scout 52. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.2 Configuring Access Points for STEP 7 and STEP 5 53. . . . . . . . . . . . . . .
4.3.3 Points to Note with SOFTNET Industrial Ethernet Modules 55. . . . . . . . .
5 Project Engineering for the OPC Server 56. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.1 Significance of Project Engineering 57. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2 Specifying the Properties of the OPC Server in Project Engineering 58.
5.3 Specifying Connection Properties for the OPC Server in
Project Engineering 60. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.4 Using Symbols for S7 Connections 64. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.5 Configuring OPC Properties for SNMP in Project Engineering 65. . . . . .
Contents
9
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
5.5.1 Significance in SIMATIC NET 65. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.5.2 SNMP Traps 66. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 Using the CP 1616 as a PROFINET IO Controller/Device 68. . . . . . . . . . . . . . . . . . .
6.1 Initialize CP 1616 (IP address and device name) 71. . . . . . . . . . . . . . . . .
6.2 Configuring the CP 1616 72. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.3 Example: Installing Linux Drivers (Suse Linux 9.2) 77. . . . . . . . . . . . . . . .
6.4 installing the PROFINET IO Sample Program (Suse Linux 9.2) 78. . . . .
Examples
7 Example — OPC Application for Industrial Ethernet 79. . . . . . . . . . . . . . . . . . . . . .
7.1 Overview 79. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.2 Hardware and Software Installation 81. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.3 Creating the STEP 7 Project 82. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.3.1 STEP 7 Project Engineering on a Central Engineering Station 82. . . . . .
7.3.2 Using Symbol Files 83. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.4 Configuring the PC Station 86. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.5 Using the OPC Scout 90. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.5.1 Establishing a Connection to the Server 90. . . . . . . . . . . . . . . . . . . . . . . . .
7.5.2 Inserting a Group and Variables 91. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.5.3 Displaying and Modifying Values of Variables 93. . . . . . . . . . . . . . . . . . . . .
8 Example — OPC Application for PROFIBUS-DP 94. . . . . . . . . . . . . . . . . . . . . . . . . .
8.1 Overview 94. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.2 Hardware and Software Installation 96. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.3 Configuring the PC Station 97. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.4 Changing the configuration on the PC station 100. . . . . . . . . . . . . . . . . . . .
8.4.1 Changing the Hardware Configuration - Preparations 100. . . . . . . . . . . . .
8.4.2 Inserting a DP Master System 102. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.4.3 Inserting a DP Slave 103. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.5 Using the OPC Scout 105. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.5.1 Establishing a Connection to the Server 105. . . . . . . . . . . . . . . . . . . . . . . . .
8.5.2 Inserting Groups and Variables 106. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.5.3 Displaying and Modifying Values of Variables 107. . . . . . . . . . . . . . . . . . . . .
9 Example — Unspecified Connection from a PC Application 109. . . . . . . . . . . . . . .
9.1 Overview 109. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.2 Installing the Software 110. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.3 Configuring the PC Station 111. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.4 Creating, Editing and Downloading a STEP 7 Project 116. . . . . . . . . . . . . .
9.4.1 Creating a New Project 116. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.4.2 Edit the Network and Connection Project Engineering Data 118. . . . . . . .
9.4.3 Downloading the Project Engineering Configuration 124. . . . . . . . . . . . . . .
Contents
10
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
9.5 Configuration Console 126. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10 Example — SNMP Communication with OPC 128. . . . . . . . . . . . . . . . . . . . . . . . . . .
10.1 Hardware and Software Installation 129. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10.2 Configuration of the SNMP OPC Server 130. . . . . . . . . . . . . . . . . . . . . . . . .
10.2.1 Editing the Plant Configuration 132. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10.3 Configuring the PC Station 135. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10.4 Using the OPC Scout 138. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10.4.1 Establishing a Connection to the Server 138. . . . . . . . . . . . . . . . . . . . . . . . .
10.4.2 Inserting a Group 139. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10.4.3 Setting the Trap Recipient based on the Example of an OSM/ESM 141. .
10.5 Creating a Device Profile with the MIB Compiler 143. . . . . . . . . . . . . . . . . .
11 Example — PROFINET Communication with OPC 147. . . . . . . . . . . . . . . . . . . . . . .
11.1 Hardware and Software Installation 148. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11.2 Configuring the PC Station 149. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11.3 Using Symbol Files 151. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tools and Utilities
12 Station Configuration Editor Tool 153. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12.1 Characteristics, Functions and Activation 153. . . . . . . . . . . . . . . . . . . . . . . .
12.2 Managing Components: “Components” Tab 154. . . . . . . . . . . . . . . . . . . . . .
12.3 Evaluating Messages: “Diagnostics” Tab 158. . . . . . . . . . . . . . . . . . . . . . . . .
12.4 Setting the Station Configuration Editor: “Properties” Dialog 158. . . . . . . .
13 SIMATIC NCM PC Project Engineering Tool 160. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13.1 Characteristics, Functions and Activation 160. . . . . . . . . . . . . . . . . . . . . . . .
13.2 Relationship Between SIMATIC NCM PC and STEP 7 163. . . . . . . . . . . .
13.3 Creating a PC Station 165. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13.4 Configuring a PC Station with SIMATIC NCM PC Config 168. . . . . . . . . . .
13.5 Creating the DP Master System 171. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13.6 Creating a PROFINET IO System 173. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13.7 Configuring Connections 175. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13.8 Project Engineering for a PC Station as DP Slave 177. . . . . . . . . . . . . . . .
13.8.1 DP Master is Known in NCM / STEP 7 177. . . . . . . . . . . . . . . . . . . . . . . . . .
13.8.2 Configuration with a “Third-party” DP Master 182. . . . . . . . . . . . . . . . . . . .
13.9 Downloading Project Engineering Data to the PC Station (after Initial
Configuration) 184. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13.9.1 Online Mode 185. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13.9.2 Offline Mode (Engineering Station and Runtime PC Separate) - XDB Import 187
Contents
11
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
13.10 Adapting Mismatched Configurations 189. . . . . . . . . . . . . . . . . . . . . . . . . . . .
14 PC Station Wizard 190. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15 Symbol File Configurator Too 192. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15.1 Characteristics, Functions and Activation 192. . . . . . . . . . . . . . . . . . . . . . . .
15.2 The Meaning of Symbols 195. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15.3 Menus of the Symbol File Configurator in Detail 197. . . . . . . . . . . . . . . . . .
15.4 Managing Symbols 199. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15.4.1 How to Insert a New Symbol 199. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15.4.2 How to Insert a New Folder 200. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15.4.3 How to Add a Name Space Prefix 201. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15.4.4 How to Delete Folders or Symbols 201. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15.4.5 How to Import a Symbol File 201. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15.4.6 How to Export a Symbol File 202. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16 Configuration Console Tool 203. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16.1 Characteristics, Function and Activation 203. . . . . . . . . . . . . . . . . . . . . . . . .
16.2 Support During Commissioning and Operation 205. . . . . . . . . . . . . . . . . . .
16.2.1 Triggering a Restart on the Module 205. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16.2.2 Forcing the OPC Server to Close Down 207. . . . . . . . . . . . . . . . . . . . . . . . .
16.2.3 Activating Configured Protocols Step by Step 209. . . . . . . . . . . . . . . . . . . .
16.2.4 Setting a Symbol File for OPC 211. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16.2.5 Setting Traces 213. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16.2.6 Language Setting 217. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16.2.7 Automatic Startup of Applications and Services; 218. . . . . . . . . . . . . . . . . .
16.2.8 Security Setting (Windows XP + SP2 only) 221. . . . . . . . . . . . . . . . . . . . . . .
16.2.9 Configuration Examples 223. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16.3 Editing the Configuration 224. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16.3.1 Changing the Mode of a Module 224. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16.3.2 Displaying and Setting the Industrial Ethernet Network Parameters for a CP
1613 226. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16.3.3 Setting the Industrial Ethernet Station Addresses 228. . . . . . . . . . . . . . . . .
16.3.4 Assigning Access Points to the Individual Modules 229. . . . . . . . . . . . . . . .
16.3.5 Setting the PROFIBUS DP Slave 231. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16.4 Diagnostics with “Configuration Console” 233. . . . . . . . . . . . . . . . . . . . . . . .
16.4.1 Displaying the Operability of a PROFIBUS Module 233. . . . . . . . . . . . . . . .
16.4.2 Displaying the Industrial Ethernet Network Parameters for a CP 1613 235
16.4.3 Displaying PROFIBUS Network Nodes 236. . . . . . . . . . . . . . . . . . . . . . . . . .
16.4.4 Displaying PROFIBUS Network Parameters 238. . . . . . . . . . . . . . . . . . . . .
16.4.5 Displaying Version Information of Hardware and Firmware 239. . . . . . . . .
17 OPC Scout 240. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.1 Characteristics, Functions and Activation 240. . . . . . . . . . . . . . . . . . . . . . . .
17.2 Connecting the OPC Scout to a Local Server 242. . . . . . . . . . . . . . . . . . . .
17.3 Connecting the OPC Scout to a Remote Server 242. . . . . . . . . . . . . . . . . .
17.4 Create a Group 243. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.5 Browsing the Process Space - OPC Navigator 243. . . . . . . . . . . . . . . . . . .
Contents
12
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
17.6 Create New Variables 245. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.7 Adding and Monitoring Variables 245. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.8 Customizing the Display 246. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.9 Display Attributes 247. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.10 Change Values 248. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.11 Menus of the OPC Scout in Detail 248. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.11.1 File Menu 248. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.11.2 View Menu 249. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.11.3 Server Menu 249. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.11.4 Group Menu 250. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.11.5 Item Menu 250. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17.11.6 ? Menu 251. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18 DCOM Settings with the dcomcnfg System Program 252. . . . . . . . . . . . . . . . . . . . .
18.1 Characteristics, Functions and Activation 252. . . . . . . . . . . . . . . . . . . . . . . .
18.2 ”Default Properties” Tab 255. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18.3 ”Default Security” / ”Default COM Security” / ”COM Security” Tab 257. . .
18.4 DCOM Configuration / “Applications” Tab 260. . . . . . . . . . . . . . . . . . . . . . . .
18.5 “Default Protocols” Tab 261. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18.6 Configuration of the Server Computer 262. . . . . . . . . . . . . . . . . . . . . . . . . . .
18.6.1 “General” Tab: Registering the OPC Server 263. . . . . . . . . . . . . . . . . . . . . .
18.6.2 “Location” Tab 264. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18.6.3 “Identity” Tab 265. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18.6.4 “Security” Tab 267. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18.7 Configuration of the Client Computer 273. . . . . . . . . . . . . . . . . . . . . . . . . . . .
A Notes for Users of Older Versions 266. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A.1 LDB and XDB Databases - Overview 266. . . . . . . . . . . . . . . . . . . . . . . . . . .
A.2 Project Engineering up to SIMATIC NET CD 05/2000 267. . . . . . . . . . . . .
A.3 Continued Use of Previous Project Engineering 269. . . . . . . . . . . . . . . . . .
A.4 Industrial Ethernet - Effects on Older Product Versions
(SIMATIC NET CD 05/2000 and earlier) 270. . . . . . . . . . . . . . . . . . . . . . . . .
A.5 PROFIBUS - Effects on Older Product Versions
(SIMATIC NET CD 05/2000 and earlier) 272. . . . . . . . . . . . . . . . . . . . . . . . .
B Description of the PROFINET Configuration File 276. . . . . . . . . . . . . . . . . . . . . . . . .
C References and Literature 281. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
D Glossary 284. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1 Welcome to Advanced PC Configuration
13
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
1 Welcome to Advanced PC Configuration
1.1 A New Concept for Your Benefit
Advanced PC Configuration is the new tool with which you can commission a PC
station as part of an industrial communication network.
SIMATIC NET supports the option of using Advanced PC Configuration on a
central engineering station (ES) to configure not only PC stations but also, for
example, operator stations (OS). The engineering station is a networked PC with
the SIMATIC NCM PC program or STEP 7 installed.
Characteristics - Comparison with Previous Products
The new features of the SIMATIC NET software involve several changes to the
previous configuration and project engineering procedures and these are
summarized below:
S You can make all settings with one tool during project engineering and
download them completely to the PC station.
The tool is SIMATIC NCM PC or STEP 7. Depending on your system
configuration, you also use the Station Configuration Editor during the initial
configuration.
The functions of these two tools are now so clearly delineated that you no
longer need the aid of a further tool the Commissioning Wizard.
S Properties that you previously configured using the “Set PG/PC Interface”
program are now part of the project engineering and are downloaded to the PC
station. These include, for example, the station address and the bus
parameters. It is no longer necessary to create several databases.
S Properties that were previously specified in various project engineering
programs are now configured in the project engineering in SIMATIC NCM PC /
STEP 7. Examples of such project engineering tools include COML S7, COM
PROFIBUS.
S Configuration parameters for the OPC Server that were previously stored in
TXT files are now configured in the project engineering in SIMATIC NCM PC /
STEP 7 and downloaded to the PC station.
S The OPC server can also handle communication on unconfigured S7
connections in PG operation. This function is, for example, required for use in
HMI stations.
Supported Modules
You will find a list of modules supported and not supported by Advanced PC
Configuration in the “hinw_e.rtf” file on the SIMATIC NET product CD (<CD drive>
/ sw / cdintern / hinw_e.rtf).
1 Welcome to Advanced PC Configuration
14
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
LDB Databases no Longer Required
By configuring on a central station and with the option of downloading, LDB
databases are no longer required for the DP, FMS, and S7 protocols. Configuration
and project engineering data can be exported to XDB files in STEP 7; they must
be imported into the central data management on the PC station using the Station
Configuration Editor.
Note
For more detailed information on the differences compared with the previous
procedure and handling the software and modules, refer to Appendix A.
1 Welcome to Advanced PC Configuration
15
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
1.2 PC Stations in SIMATIC
Use of PCs in Automation
A “PC station” is a PC with communication modules and software components
within an automation solution with SIMATIC.
The hardware configuration of a PC station can be compared with the configuration
of an S7 controller In SIMATIC:
In the same way, components of
a PC station, for example
modules, are assigned to a
virtual slot per software.
The virtual rack is implemented
on the PC station by software.
In an SIMATIC S7-400,
modules are inserted in the
slots in the rack.
PC Station
Virtual rack in the PC stationVirtual rack in the PC station
Slot
Software - The OPC Server as Central Component
A PC station contains SIMATIC NET communication modules and software
applications. One typical software application with which user programs can
communicate is the SIMATIC NET OPC server.
1 Welcome to Advanced PC Configuration
16
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Uniform Engineering Environment
The PC station is handled just like a SIMATIC S7 controller during project
engineering with STEP 7 / NCM PC: You connect the S7 stations and PC stations
to the network in the network view and specify communication connections.
The project engineering data is downloaded to the stations at the touch of a button.
With PC stations, you have two options:
S Remote Configuration and Download:
Direct initial configuration or modification of a configuration and transfer of
project engineering data to an (online) PC station over an Ethernet adapter.
S Load a PC Station (XDB import)
In this situation, project engineering data is saved to a file and can be imported
into the PC station using any method of data transfer (applies to PROFIBUS
and Ethernet).
S Download
S Remote
Configuration /
Download
S Load a PC
Station
(XDB import)
Project engineering
tool STEP 7 /
NCM PC
Virtual rack in the PC station
1 Welcome to Advanced PC Configuration
17
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Index for Every Component
To allow communication between the components in the PC station and to receive
project engineering data, each component is assigned a unique identification
number. The identification number for modules, applications, and other
components in a PC station is the index. Analogous to the slot of a module in an
S7-400 controller, the index corresponds to a virtual slot in a PC station.
Note
Be careful not to confuse this “index” with a hardware slot, for example on the PCI
bus of the computer. The slot on the PCI bus is not relevant for commissioning
and is not used at any point.
1 Welcome to Advanced PC Configuration
18
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
1.3 A Brief Introduction to Tools and Utilities
Once you have installed the SIMATIC NET software, you have the following tools
available:
Basic tools:
Station Configuration Editor
With this tool, you insert the modules and components into the “virtual”
slots of the PC station and assign them addresses and parameters.
Project engineering tool SIMATIC NCM PC
SIMATIC NCM PC is a version of STEP 7 specially for project engineering
of PC stations. It provides the full range of features of STEP 7 for PC
stations.
Additional tools / utilities:
PC Station Wizard
The PC Station Wizard supports you when creating projects in SIMATIC
NCM PC or STEP 7. It allows the automatic adoption of configuration on
the local PC station. This helps you to make sure that your configuration
data is consistent.
Symbol File Configurator
With the Symbol File Configurator, you can create symbol files that allow
you the option of access to symbolic variables over the SIMATIC NET
OPC server.
Configuration Console
The Configuration Console provides a variety of options for configuration
and diagnostics of PC hardware components and PC user programs as
well as the OPC server.
SIMATIC NET Information Service
The information service displays information on events that occurred due
to activated trace requests. Trace requests can be made in the
Configuration Console.
OPC Scout
With the OPC Scout, you can test an OPC application or commission the
OPC server.
DCOM Settings (Windows system program)
To allow a client to use a COM object on another computer, the properties
of the COM object must be configured on the client and on the remote
computer.
1 Welcome to Advanced PC Configuration
19
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
1.4 Guide to Installation and Commissioning
Before you start commissioning, you should clarify the area of operation of your
PC station and select the required mode for your communication module. The
steps involved in commissioning differ depending on the mode you select for your
communication module.
Below, you can see an overview of the steps involved in commissioning. The
sections following then describe the individual steps and tools in greater detail.
1.4.1 PG Operation or Configured Mode - Considerations
When commissioning and operating a SIMATIC PC station, distinctions must be
made between the following areas of application: Depending on the area of
application, select the mode of the communication module.
S PG Operation
This is the default mode for a programming device (PG/PC) and HMI station.
S Configured Mode
This mode should be selected for productive communication between
applications in the PC station and the programmable controllers, for example
SIMATIC S7-400.
The primary use of your PC station
is:
resulting area of
application:
Selectable mode:
S For diagnostics and maintenance
and for programming and project
engineering (STEP 7).
Programming
device (PG/PC)
S For process control tasks (operator
control and monitoring).
It should be possible to use the
station independent of a STEP 7
project.
HMI station
PG operation
(default)
S For project engineering (STEP 7) in
an automated plant operated with
S7 stations
S For tasks in process control and
visualization.
Engineering
station (ES)
Configured
mode
S As an automation system
networked with programmable
controllers.
Runtime PC
mode
1 Welcome to Advanced PC Configuration
20
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
Mixed operation is possible.
Since you can set the mode for individual communication modules, you can also
use the PC station in mixed operation.
Mixed operation, in this sense, means the use of several communications modules
some in the configured and some in the PG mode.
Depending on the selected mode, the information below applies to the individual
modules of the PC station.
Characteristics of the Selectable Modes
The table below shows the differences between the two selectable modes and how
this affects handling of the PC station during commissioning and operation.
Table 1-1
Mode
Characteristics/Advantages when Commissioning and During
Operation
PG operation (default
mode)
The module used in a PC station in this mode is not included in the STEP 7
project (it is, however, possible to take this module into account in the bus
parameter calculation using the PG/PC station object).
If your module in the PG or engineering station is configured for this mode,
you must specify the interface on the PG or the engineering station explicitly
with the “Set PG/PC Interface” or Configuration Console tool.
With HMI stations, connections to communication partners are set up for
process control over unconfigured S7 connections.
Configured mode The PC station along with the modules planned in the project engineering is
included in a STEP 7 project so that the communication relations with the
stations can be planned in the project.
This has the following advantages:
S Very simple commissioning (initial configuration) by using this
configuration.
S Networking parameters stored in the project are adopted (PROFIBUS).
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176
  • Page 177 177
  • Page 178 178
  • Page 179 179
  • Page 180 180
  • Page 181 181
  • Page 182 182
  • Page 183 183
  • Page 184 184
  • Page 185 185
  • Page 186 186
  • Page 187 187
  • Page 188 188
  • Page 189 189
  • Page 190 190
  • Page 191 191
  • Page 192 192
  • Page 193 193
  • Page 194 194
  • Page 195 195
  • Page 196 196
  • Page 197 197
  • Page 198 198
  • Page 199 199
  • Page 200 200
  • Page 201 201
  • Page 202 202
  • Page 203 203
  • Page 204 204
  • Page 205 205
  • Page 206 206
  • Page 207 207
  • Page 208 208
  • Page 209 209
  • Page 210 210
  • Page 211 211
  • Page 212 212
  • Page 213 213
  • Page 214 214
  • Page 215 215
  • Page 216 216
  • Page 217 217
  • Page 218 218
  • Page 219 219
  • Page 220 220
  • Page 221 221
  • Page 222 222
  • Page 223 223
  • Page 224 224
  • Page 225 225
  • Page 226 226
  • Page 227 227
  • Page 228 228
  • Page 229 229
  • Page 230 230
  • Page 231 231
  • Page 232 232
  • Page 233 233
  • Page 234 234
  • Page 235 235
  • Page 236 236
  • Page 237 237
  • Page 238 238
  • Page 239 239
  • Page 240 240
  • Page 241 241
  • Page 242 242
  • Page 243 243
  • Page 244 244
  • Page 245 245
  • Page 246 246
  • Page 247 247
  • Page 248 248
  • Page 249 249
  • Page 250 250
  • Page 251 251
  • Page 252 252
  • Page 253 253
  • Page 254 254
  • Page 255 255
  • Page 256 256
  • Page 257 257
  • Page 258 258
  • Page 259 259
  • Page 260 260
  • Page 261 261
  • Page 262 262
  • Page 263 263
  • Page 264 264
  • Page 265 265
  • Page 266 266
  • Page 267 267
  • Page 268 268
  • Page 269 269
  • Page 270 270
  • Page 271 271
  • Page 272 272
  • Page 273 273
  • Page 274 274
  • Page 275 275
  • Page 276 276
  • Page 277 277
  • Page 278 278
  • Page 279 279
  • Page 280 280
  • Page 281 281
  • Page 282 282
  • Page 283 283
  • Page 284 284
  • Page 285 285
  • Page 286 286
  • Page 287 287
  • Page 288 288
  • Page 289 289
  • Page 290 290
  • Page 291 291
  • Page 292 292
  • Page 293 293
  • Page 294 294
  • Page 295 295
  • Page 296 296
  • Page 297 297
  • Page 298 298
  • Page 299 299
  • Page 300 300

Siemens SIMATIC NET Commissioning PC Stations User manual

Category
General utility software
Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI