One Stop Gardens Item 93358 Owner's manual

Type
Owner's manual

This manual is also suitable for

Page 2 For technical questions, please call 1-800-444-3353. Item 93358
Table of Contents
Safety ......................................................... 3
Specifications ............................................. 4
Assembly .................................................... 5
Maintenance .............................................. 29
Warranty .................................................... 32
Parts Lists .................................................. 30
WARNING SYMBOLS AND DEFINITIONS
This is the safety alert symbol. It is used to alert you to potential personal injury hazards.
Obey all safety messages that follow this symbol to avoid possible injury or death.
Indicates a hazardous situation which, if not avoided,
will result in death or serious injury.
Indicates a hazardous situation which, if not avoided,
could result in death or serious injury.
Indicates a hazardous situation which, if not avoided,
could result in minor or moderate injury.
Addresses practices not related to personal injury.
Page 3For technical questions, please call 1-800-444-3353.Item 93358
IMPORTANT SAFETY INFORMATION
The warnings, precautions, and instructions discussed in this manual cannot cover all possible conditions
and situations that may occur. The operator must understand that common sense and caution are factors,
which cannot be built into this product, but must be supplied by the operator.
Assembly / Installation Precautions
1. Assemble only according to these instructions.
Improper assembly can create hazards.
2. Wear ANSI-approved safety goggles and
heavy-duty work gloves during assembly.
3. This unit contains pieces with sharp edges.
The machined edges of the aluminum parts
and the ends of the panel clips may be sharp.
Handle all parts carefully.
4. Keep assembly area clean and well lit.
5. Keep bystanders out of the area during assembly.
6. Do not assemble when tired or when under the
influence of alcohol, drugs or medication.
7. Product capabilities apply to properly and
completely assembled product only.
8. Locate the Greenhouse on a flat, level, surface.
A concrete foundation is recommended
for a high-quality installation.
9. WARNING: The brass bushings inside the
Rollers of this product contain lead, a chemical
known to the State of California to cause
birth defects (or other reproductive harm).
(California Health & Safety Code § 25249.5, et seq.)
Use / Service Precautions
1. This product is not a toy. Do not allow
children to play in or climb on this product.
Although this greenhouse does include some caps,
there are still some exposed sharp edges.
In addition, protective covers may fall off in time.
Children must be supervised if
allowed near the greenhouse.
2. SNOW/DEBRIS ACCUMULATION HAZARD.
The heavy weight of accumulated snow or other
debris can cause parts of this greenhouse to buckle
suddenly. Do not allow debris to accumulate on
top of the greenhouse. If snowfall is expected,
place additional supports (not provided) underneath
the Crown. NEVER enter a greenhouse
with accumulated debris on top.
3. Use as intended only.
4. Inspect periodically; replace damaged parts
immediately and do not enter greenhouse
if parts are loose or damaged.
5. For your safety, service and maintenance should
be performed regularly by a qualified technician.
SAVE THESE INSTRUCTIONS.
Page 4 For technical questions, please call 1-800-444-3353. Item 93358
Specifications
Overall Dimensions 120
1
/
2
″ W x 144
1
/
2
″ L x 123″ H
Window Dimensions 23
1
/
4
″ W x 31
1
/
4
″ L
Door Dimensions 75
1
/
2
″ H x 35
1
/
2
″ W x 1
1
/
4
″ Thick
Materials
Aluminum Frame
Transparent Polycarbonate Sheets
Aluminum Thickness 0.038″
Polycarbonate Sheet Thickness 0.165″
Page 5For technical questions, please call 1-800-444-3353.Item 93358
Assembly
Read the ENTIRE IMPORTANT SAFETY INFORMATION section at the beginning of this document
including all text under subheadings therein before set up or use of this product.
IMPORTANT–READ THE FOLLOWING CAREFULLY BEFORE PROCEEDING
• Thefirststepinassemblyistoassembleaproperbase.Thegreenhousemustbeproperly
supported to help prevent property damage and injury in the event of strong winds or
inclement weather. Wind and ground conditions may vary from site to site, and may affect
the practicality and effectiveness of anchoring methods substantially. If you have any doubt
regarding the stability of the base/foundation you are to use, consult a professional.
• Itisalwaysyourresponsibilitytoensurethatthegreenhouseisproperlyanchored.
Harbor Freight Tools cannot be held responsible for personal injury, damage to the greenhouse,
or other property damage that occurs as a result of improperly anchoring the greenhouse.
• Becertaintocheckwithlocalauthoritiestoobtainallrequiredbuildingpermits
and to familiarize yourself with any building codes that may apply.
• Decideonalocationforthegreenhouse.Thelocationshouldoptimallybea
level, well-lit area that is sheltered from the wind. The door of the greenhouse
should not open towards the prevailing wind, if possible.
IMPORTANT ASSEMBLY TIPS
• AssembleBoltswiththeirheadsfacingtheoutsideofthegreenhouse,unlessstatedotherwise.
Tighten Nuts (67) only about 1/4 turn past finger-tight; be careful not to overtighten.
• Layoutallpartsbynumberpriortoassembly.
• Atleasttwoassistantswillbenecessaryduringassembly.
• Assembleonaclear,calmday.WindwilldamagetheGreenhouseandmakeassemblydifficult.
Page 6 For technical questions, please call 1-800-444-3353. Item 93358
Phase 1: Base Assembly
All parts in this phase
are fastened using
32 Base Bolts (68)
and 32 Base Nuts (69).
Page 7For technical questions, please call 1-800-444-3353.Item 93358
Base Assembly Instructions
1. Excavate an area for the base of the greenhouse.
The area must be 10′ 2″ wide by 12′ 2″ long by
5″ deep. The floor of the hole must be level
and square. The diagonal dimensions, from
corner to corner, should each be 15′ 5″.
2. Assemble the Base outside the hole as shown
below. Note that the angled edges of the
Base Plates (43, 44) need to face the corners of
the base. Use Base Bolts (68), Base Nuts (69), and
Connectors (45, 46) to secure the pieces together.
3. With assistance, lower the Base into the hole.
The diagonal dimensions,
from outside corner to outside corner,
must be equal for the base to be square.
4. Fill the hole around the outside of the base with soil.
5. This base will need to be filled with about
40 cubic feet of gravel or another appropriate
fill material (not provided). The gravel should
reach up to about 1″ below the lip of the base.
Page 8 For technical questions, please call 1-800-444-3353. Item 93358
Phase 2: Floor Plate Installation
All parts in this phase
are fastened using
16 Normal Bolts (65)
and 16 Nuts (67).
44
44
44
43
43
43
43
44
4
4
5
1a
2a
(Front)
(Right)
(Rear)
(Left)
3
6
3
47
a
b
c
Floor
Plate
Base
Plate
gravel
Hold-down Connector (47)
attachment
a. Slide Connector (47) under lip.
b. Insert Regular Bolt (65).
c. Fasten with Nut (67)
Grey parts are in place before this phase.
Page 9For technical questions, please call 1-800-444-3353.Item 93358
Floor Plate Installation Instructions
1.
gravel
ground
Base Plate
(43, 44)
Rear/Side
Floor Plates
(3 – 6)
Front Floor
Plate (1a, 2a)
outside
greenhouse
Cross Section
When placing the Floor Plates (1a–6) on top of
the Base Plates (43, 44), align them as illustrated
above. The lip should extend slightly over the
edge of the Base Plate and the raised flange with
bolt holes should face inside the greenhouse.
2. Place the Front-Left Floor Plate (1a)
on top of the Base Plate (44). Lay the
Front-Right Floor Plate (2a) on top of it and line
up the 2 holes where the Plates overlap.
3. Fasten the Front Floor Plates (1a, 2a) together,
and secure to the Base Plate (44) using a
Hold-down Connector (47) over one of the
Bolts (65), see inset on facing page.
4. Place the Side Floor Plates (4) on the
Side Base Plates (43) on the front-right
and rear left corners as illustrated. Lay the
Upper Side Floor Plates (3) on top so that the
three holes line up where the Plates overlap.
5. Fasten the Side Floor Plates (3, 4) together,
and secure to the Base Plates (43) using
3 Hold-down Connectors (47) on each side
of the greenhouse in the places illustrated;
see illustration and inset on facing page.
6. Lay the Rear-right Floor Plate (6) on top of the
Rear-left Floor Plate (5) so that the 2 holes
line up where the Plates overlap. Fasten the
Rear Floor Plates (5, 6) together through those holes.
7. Place the assembled Rear Floor Plates (5, 6)
on top of the Base Plates (44).
8. Secure the Rear Floor Plates (5, 6)
to the Base Plates (44) using
2 Hold-down Connectors (47) in the locations
shown; see illustration and inset on facing page.
Page 10 For technical questions, please call 1-800-444-3353. Item 93358
47
47
67
67
65
65
7
Phase 3: Corner Post Installation
Parts in this phase
are fastened using
10 Normal Bolts (65),
14 Brace Bolts (66),
2 Double Brace Bolts (78),
and 26 Nuts (67).
(Front)
(Right)
(Rear)
(Left)
5
6
4
3
3
4
1a
2a
7
49
49
49
49
7
7
7
31
31
79
79
79
79
80
80
80
80
a
b
d
c
Floor
Plate
Base
Plate
gravel
Hold-down Connector (47)
attachment with Strut (79, 80)
a. Slide Connector (47) under lip.
b. Insert Brace Bolt (66).
c. Slide Strut (79, 80) over Bolt.
d. Fasten with Nut (67)
Grey parts are in place before this phase.
Page 11For technical questions, please call 1-800-444-3353.Item 93358
Corner Post Installation Instructions
1. There are 4 Corner Posts (7) to be attached
to the Floor Plates (1–6). The end with 2
holes should be at the bottom, as shown in
the illustration in the center of this page.
2. Attach one Corner Post (7) on the outside of
the right rear Floor Plates (3, 6) using 2 Normal
Bolts (65), 2 Hold-down Connectors (47),
and 2 Nuts (67), see inset - facing page.
3.
49
66
65
78
67
67
67
7
31
79
80
(Rear)
(Right)
(View from inside greenhouse.)
Fasten a Corner Bracket (49) to the top
of the Corner Post (7) over the Rear Floor
Plate (6) using one Normal Bolt (65) for
now. Install it angled up towards the center
of the greenhouse, as shown above.
4. Install a Double Brace Bolt (78) through the bottom
hole of the Corner Bracket (78). Place a Rear
Brace (31) over it with the arrow pointing towards
the Bolt. Also place Front/Rear Diagonal Strut (79)
over the Bolt, and thread on Nut (67) hand-tight.
5. Fasten a Side Diagonal Strut (80) to
the free top hole on the Corner Post (7)
using Brace Bolt (66) and Nut (67).
6. Fasten Struts (79, 80) to Floor Plates using
Brace Bolts (66), Hold-down Connectors (47),
and Nuts (67), see inset on facing page.
Allow Rear Braces (31) to hang free.
7. Repeat steps 2 through 6 for the left rear
Corner Post (7) on the left side. Keep
in mind that the connections will be
reversed compared to the right side.
8. Attach one Corner Post (7) on the outside
of the front left Floor Plates (1a, 3)
using 2 Normal Bolts (65), 2 Hold-down
Connectors (47), and 2 Nuts (67).
9.
49
66
66
67
67
7
79
80
(Front)
(Left)
(View from inside greenhouse.)
Insert a Brace Bolt (66) through the second
hole from the top of the Corner Post (7) over the
Front Floor Plate (1a). Place the bottom hole
of the Corner Bracket (49) over the Bolt with it
angled up towards the center of the greenhouse,
as shown above. Secure it using a Nut (67).
10. Fasten a Side Diagonal Strut (80) to the top
hole on the Corner Post (7) over the Side Floor
Plate using a Brace Bolt (66) and Nut (67).
11. Secure the Struts (79, 80) to the Floor Plates
using Brace Bolts (66), Hold-down Connectors
(47), and Nuts (67), see inset on facing page.
12. Repeat steps 8 through 11 for the right
front Corner Post (7) on the right side.
Keep in mind that the connections will be
reversed compared to the left side.
BOTTOM
TOP
Corner Post (7)
Page 12 For technical questions, please call 1-800-444-3353. Item 93358
1. Insert Normal Bolts (65) through all holes in the
front of the Front Ceiling Plates (24, 25), as
shown. Thread a Nut (67) onto each
Bolt, but leave all Nuts loose for now.
2. Slide the slot on the Right
Door Rail (27) over
the heads of the 2
Bolts on the
Front-
right
Ceiling Plate (25) until the right end
is flush, as shown.
The illustration in the center of this
page shows how to slide the Rail
over the Bolt heads.
Tighten the Nuts on those 2 Bolts.
3. Slide the Bolt heads on the Front-left
Ceiling Plate (24) into the slot of the
Right Door Rail (27) from the left edge until
it rests against the Front-right Ceiling
Plate (25).
Tighten the 2 right-most
Nuts on the Ceiling Plate.
4. Slide the slot on the Left Door Rail (26) over the
heads of the remaining three Bolts in the Front-
left Ceiling Plate (24) until it presses against the
Right Door Rail (27).
Tighten the remaining Nuts.
Phase 4a: Ceiling Plate Assembly, Front
26, 27
24, 25
65
Parts in this phase
are fastened using
7 Normal Bolts (65)
and 7 Nuts (67).
Step 3
25
27
24
Tighten these two
Nuts after sliding
Step 4
27
26
25
24
Step 2
25
27
Step 1
24
25
65
65
65
65
65
Page 13For technical questions, please call 1-800-444-3353.Item 93358
Phase 4b: Ceiling Plate Assembly, Side
1. Insert a Plain Side Ceiling Plate (13) in the brackets
on the end of a Side Ceiling Plate with Brackets (12).
2. Secure in place with 6 Normal Bolts (65)
and 6 Nuts (67). The heads of the Bolts
should all face the gutter side of the Ceiling
Plates, as shown in the inset above.
3. Repeat the two previous steps for the
remaining Plain Side Ceiling Plate (13) and
Side Ceiling Plate with Brackets (12).
4. Attach an End Cap (72) to the top outer corner
of each Corner Post (7) at this point.
Parts in this phase
are fastened using
a total of
12 Normal Bolts (65)
and 12 Nuts (67).
13
12
65
65
67
13
12
67
67
67
65
65
67
67
65
65
13
12
13
12
Page 14 For technical questions, please call 1-800-444-3353. Item 93358
Phase 5: Ceiling Plate Installation
Parts in this phase are fastened using
2 Normal Bolts (65),
8 Brace Bolts (66),
and 10 Nuts (67).
Additional Bolts and Nuts are already
in place before this phase.
(Front)
(Right)
(Rear)
(Left)
7
7
7
80
80
80
7
13
12
13
12
31
31
80
24, 25
48
48
Grey parts are in place before this phase.
Means that the nearby Bolt
will be removed and then re-
attached at the same location.
Page 15For technical questions, please call 1-800-444-3353.Item 93358
Ceiling Plate Installation Instructions
1. Insert one Normal Bolt (65) through the Corner
Bracket (49) and the upper hole in the Corner Post
(7) at both front corners of the greenhouse, from
the inside out, as shown above. This is for the later
attachment of the Front Ceiling Plate (24-27).
2.
(View from inside greenhouse.)
49
67
7
(Front)
(Left)
80
79
12
A
To attach one end of a Side Ceiling Plate (12, 13):
a. Remove the Nut (67) where the Side Diagonal
Strut (80) connects to the Corner Post (7) in
one corner, marked A in the illustration above.
b. Temporarily disconnect that
Side Diagonal Strut (80) from the
Brace Bolt (66), but leave the Bolt in place.
c. Orient the gutter opening up as shown above.
d. Place the Side Ceiling Plate (12, 13) then
the Side Diagonal Strut (80) on the end of
the Bolt, and secure with a Nut (65).
3. Secure the other end of that
Side Ceiling Plate (12, 13) similarly.
4. Attach the Front Ceiling Plate (24, 25)
to the 2 Normal Bolts (65) put in
place in step 1 on the outside of the
greenhouse, note orientation at right.
5. Attach the remaining Side Ceiling Plate (12, 13)
along the other side according to steps 2 & 3,
with the gutter opening up.
6.
31
31
48
48
(View from
inside
greenhouse.)
67
67
67
67
66
66
66
66
Bolt 2 Post Connectors (48) to a Rear Brace (31)
using Brace Bolts (66) through their bottom holes,
from the outside in. Place Post Connectors
on the outside of the greenhouse with the
flat side against the Brace, as shown above.
Only finger tighten for now.
7. Swing the Rear Braces (31) together and bolt the
second Brace to the second from bottom holes on
the Post Connectors (48), using Brace Bolts (66)
from the outside in. Only finger tighten for now.
Note: The Rear Braces (31) will be under tension.
8. If you cannot attach the second
Post Connector (48), or if they are not parallel:
Make sure that the arrows on both
of the Rear Braces (31) are pointing
towards the Corner Posts (7).
Page 16 For technical questions, please call 1-800-444-3353. Item 93358
Phase 6: Post Installation
Parts in this phase are fastened using
8 Normal Bolts (65),
2 Brace Bolts (66),
4 Double Brace Bolts (78),
and 14 Nuts (67).
Additional Bolts and Nuts are already
in place before this phase.
(Front)
(Right)
(Rear)
(Left)
80
80
80
14
66(x4)
14
66(x4)
14
66(x4)
14
66,78,66
31
31
80
13
12
13
12
14
66(x4)
14
66(x4)
14
66(x4)
14
66,78,66
14
66,78,66
14
66(x4)
17
66(x2)
16
66(x2)
14
66(x4)
14
66,78,66
81
81
81
81
44 Brace Bolts (66)
are inserted into Posts
during this phase for
use in phase 7.
3
3
4
4
5
6
48
48
Grey parts are in place before this phase.
Means that the nearby Bolt will be removed
and then re-attached at the same location.
Means that the bolt underneath will be
loosened, a Post will slide over the bolt
head, and then it will be re-tightened.
Page 17For technical questions, please call 1-800-444-3353.Item 93358
Post Installation Instructions
Note: All Posts (14, 16, 17) in this
phase require extra Bolts to be
inserted into their slot before
assembly. The small numbers
under the main part number on the
facing page are the type and
number of hardware.
See the examples below:
14
66,78,66
17
66(x2)
Post Part Number
Inserted Bolt
Part Numbers
Meaning: Insert 2 Brace
Bolts (66) into the
Rear Right Post (17)
before attaching it.
Meaning: Insert a Brace
Bolt (66), then a Double
Brace Bolt (78), then
another Brace Bolt (66)
into this Side Post (14)
before attaching it.
1. Loosen a Bolt on one of the Side Floor
Plates (3,4) in an attachment location
as shown. Slide the slot in a Side Post
(14) over the head of that Bolt.
2. Insert the required Bolts (See note
above and illustration on facing page)
into the slot in the Side Post.
3. Attach the top of the Side Post (14) to
the Ceiling Plate (12, 13), using a Normal
Bolt (65) in the slot or using the Bolt
already in place for the center Post.
4. Repeat above steps for all 10 Side Posts (14)
on the left and right sides of the greenhouse.
5. Slide a white Bushing (81) over all 4
inserted Double Brace Bolts (78). Place
the center hole of each Side Diagonal
Strut (80) over the end of each Double
Brace Bolt and secure with a Nut (67).
6. Loosen a Bolt on the Rear Floor Plate
(5, 6) in a location that a Side Post (14)
attaches, and slide a Side Post over
the head of that Bolt. Insert 4 Brace
Bolts (66) into the slot of that Post.
7.
(View from outside greenhouse.)
66
66
48
31
31
14
Side Post (14) must extend
no farther than halfway up
the Post Connector (48).
Remove the 2 Brace Bolts (66) connecting
the Post Connector (48) near that Side
Post. Slide the heads of those Bolts into the
Side Post and insert them through the Post
Connector. Align the top of the Post with the
center of the Connector as shown above, and
press it in place. Reattach the Rear Braces
(31) to the Brace Bolts (66) and secure them.
8. Repeat steps 6 & 7 for another Side
Post (14) and Post Connector (48).
9. Loosen the Bolts (66) where the Rear
Diagonal Struts (79) connect to the Rear Floor
Plate (5, 6). Slide the slot in the Rear-Left
Post (16) over the head of the left Bolt and
the Rear-Right Post (17) over the right Bolt.
10. The slanted ends of the Posts must be
on top and slant towards the center of
the greenhouse. Retighten the Bolts.
11. Slide 2 Brace Bolts (66) into the slot
of each Rear Post (16, 17).
12. Slide one more Brace Bolt (66) into the top
of each Rear Post. Attach the Rear Posts
to the Rear Braces (31) using those Bolts.
13. The frame should now rest square. Measure
diagonally from corner to corner at the top. If
the measurements are not equal, adjust the
frame as needed until square. Some Nuts
(67) may need to be loosened to adjust the
frame. Tighten all Nuts after adjustment.
Page 18 For technical questions, please call 1-800-444-3353. Item 93358
Phase 7: Brace Installation
Parts in this phase are fastened using
2 Normal Bolts (65),
20 Brace Bolts (66),
and 66 Nuts (67).
Additional Bolts and Nuts are already
in place before this phase.
Grey parts are in place before this phase.
Means that the nearby Bolt will be removed
and then re-attached at the same location.
(Front)
(Right)
(Rear)
(Left)
7
80
14
14
14
14
14
17
14
14
16
80
28
80
29
80
31
31
31
31
30
30
30
30
30
30
30
30
14
14
14
14
14
7
7
24, 25
7
32
32
32
32
Page 19For technical questions, please call 1-800-444-3353.Item 93358
Brace Installation Instructions
Note:
Brace
(30 - 32)
Strut (79, 80)
Post (14, 16, 17)
Corner Post (7)
All Braces are installed inside the Posts,
but outside the Struts. See diagram above,
shown from inside the greenhouse facing out.
1.
to (left)
Corner
Post (7)
(Outside greenhouse)
(Doorway)
(Inside greenhouse)
to (right)
Corner
Post (7)
29 28
(View from above.)
Using a Normal Bolt (65) at top and the Brace
Bolt (66) already in place at the bottom for each,
attach the Left and Right Doorway Posts (28, 29)
to the outside of the Front Floor Plates (1a, 2a)
and to the inside of the Front Ceiling Plates (24,
25). Install the Posts with the cut-outs at top and
oriented as shown in the illustration above.
2. Using Brace Bolts (66), connect the Front
Braces (32) between the Corner Posts (7) and
the Doorway Posts (28, 29). Install Braces
inside Posts but outside Struts, as shown
in the diagram at the top of this page.
Note: Install the Braces on the walls so that they are
level. If the frame is level and all Braces are level,
the Braces should not interfere with one another.
3. Connect the 4 remaining Rear Braces (31) onto
the rear wall as shown on the facing page, with
the arrows pointing towards the Corner Posts (7).
Secure in place using Brace Bolts (66) at the Corner
Post and the inserted Brace Bolts in the remaining
holes. Install Braces inside Posts but outside Struts,
as shown in the diagram at the top of this page.
4. Connect 4 Side Braces (30) onto each side wall
as shown on the facing page, with the arrows
pointing towards the Corner Posts (7). Secure in
place using Brace Bolts (66) at the Corner Post and
the inserted Brace Bolts in the remaining holes.
Install Braces inside Posts but outside Struts, as
shown in the diagram at the top of this page.
5. Place the Gutter End Caps (73) onto the ends of the
Side Ceiling Plates (12, 13) oriented with a gap in
the bottom to allow water to drain out of the gutters.
Page 20 For technical questions, please call 1-800-444-3353. Item 93358
(Front)
(Right)
(Rear)
(Left)
17
14
14
16
28
29
24, 25
8
18
10
11
9
22
20
21
23
8
19
9
Phase 8: Gable and Crown Installation
Parts in this phase are fastened using
36 Normal Bolts (65)
and 36 Nuts (67).
Additional Bolts and Nuts are already
in place before this phase.
Grey parts are in place before this phase.
Means that the bolt underneath will be
loosened, a Post will slide over the bolt
head, and then it will be re-tightened.
12
12
13
13
48
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32

One Stop Gardens Item 93358 Owner's manual

Type
Owner's manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI