SportsPlay 571-202 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the SportsPlay 571-202 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
571-202, 203, 204 Ground Socket
Page 1 of 1
Rev. 05/16/03
SportsPlay Equipment, Inc. 5642 Natural Bridge, St. Louis MO 63120
Please retain this instruction sheet in your files. It contains important
maintenance instructions as well as replacement parts information.
571-202 Parts 15# 571-203 Parts 18# 571-204 Parts 21#
1 573-515 Neolock Cap 1 573-516 Neolock Cap 1 573-517 Neolock Cap
1 573-615 Post Support 1 573-616 Post Support 1 573-617 Post Support
1 416-500 5/16” Socket
Key
1 416-500 5/16” Socket
Key
1 416-500 5/16” Socket
Key
1 CTN 1 PIPE 2 TOTAL PIECES WEIGHT 15/18/21# CLASS 70
571-202, 203, 204 Ground Socket
Page 2 of 2
Rev. 05/16/03
SportsPlay Equipment, Inc. 5642 Natural Bridge, St. Louis MO 63120
GENERAL ASSEMBLY INSTRUCTIONS:
Check all parts and hardware against the packing list to insure you have
received everything needed to assemble this product.
Check each part carefully and remove any sharp edges or projections that may
have been caused in shipping. Contact your distributor with notification of
any missing or damaged parts. Contact must be made within ten days of
receipt of your order.
After assembly is complete, all threaded ends of bolts protruding beyond nuts
should be cut off and/or peened over to remove any sharp projections. Also,
there are a few extra washers supplied to be used as spacers where needed to
prevent any thread projection beyond the nuts.
SPECIFIC ASSEMBLY INSTRUCTIONS:
STEP #1: Mark and dig holes.
STEP #2: Prop ground sockets in holes and pour concrete. Allow at least
48 hours for concrete to harden.
STEP #3: If installation is on blacktop, footings should be flush with
surface and crowned slightly for drainage.
STEP #4: I installed in dirt, footings should be left 3” below surface but
crowned for drainage. After concrete hardens fill in with dirt.
This also applies if installation is in sand, wood chips, or
other resilient safety surface.
MAINTENANCE INSTRUCTIONS:
Check periodically for loose bolts or broken parts. Replace any
broken or damaged parts immediately.
/