3
Installation S19-210BF
Bradley Corporation • 215-619BF Rev. S; ECM 10-05-031 8/27/10
Installation
Supplies Required:
• (3)3/8"flooranchorsandbolts
• Pipesealant
• Pipingto1/2"NPTwatersupplyinlet
• Pipingto1-1/4"NPTdrainoutlet
• Sign-mountinghardware
NOTE: Local codes may require the installation of
a backflow prevention valve to complete proper
installation. Compliance with local codes is the
responsibility of the installer. Valve must be tested
annually to verify that it is functioning properly.
Backflow prevention valves are not included with
the fixture and may be supplied by the contractor
or purchased from Bradley Corporation.
Step 1: Secure base to floor
1. Installthreesuitableanchors(suppliedby
installer)for3/8"boltsinthefloor.
2. Boltthebasetotheflooranchorsusing3/8"
bolts(suppliedbyinstaller).
Step 2: Assemble eyewash
1. Assembleeyewashcomponentsasshown
onpage4.
• Applypipesealant(suppliedbyinstaller)to
allmale-threadedpipejoints.
• Usetherubbergrippadprovidedora
strapwrencharoundpipeswhentightening
topreventmarring.Placethegrippadon
thepipe,thenputthewrenchoverthegrip
padandturnthepipewiththewrench.
• Usecautionwhenconnectingitems3,4.2
and5.Handtightplus1/8turnissufficient.
Step 3: Connect water supply
1. Connectthewatersupplypiping(supplied
byinstaller)tothe1/2"NPTinletonthe
eyewash.
2. Connectthedrainpiping(suppliedby
installer)tothe1-1/4"NPTdrainoutletonthe
eyewash.
3. Mountthesafetysigntothewallusingsign-
mountinghardware(suppliedbyinstaller).
4. Openthewatersupplylinesandtestfor
leaksandadequatewaterflow.
NOTE: All dimensions assume standard thread engagement.
Variations in manufacturing allow for +/- 1/8”
(3mm) per threaded joint. To find the tolerance of
a dimension, add the number of thread joints in
between a dimension and multiply it by 1/8” (3mm).
27"
(686mm)
Ø 10-3/4"
(273mm)
18-3/4"
(476mm)
15-3/4"
(400mm)
6"
(152mm)
31"
(787mm)
5-5/8" (143mm)
Ø9"(229mm)Flange
with(3)Ø3/8"(10mm)
HolesonØ8"(203mm)
Bolt Circle