Water Source SPC250 Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Water Source SPC250 Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
SPC-250 instructions
1. Thread the 1-1/2 in. check valve into the discharge of your pump.
2. Slide 1-1/4 in. flexible hose on top of the check valve and tighten a hose clamp to ensure there
are no leaks.
o For permanent installation, using PVC Cement attach a 1-1/2 in. PVC slip coupler to the
top of the check valve. Attach the 1-1/2 in. PVC discharge pipe to the PVC slip coupler.
Allow for proper curing time as suggested by the PVC Cement manufacturer.
- Note: use Teflon tape on all threaded connections to prevent leaks.
/