Water Source SPC250 Operating instructions

Type
Operating instructions
SPC-250 instructions
1. Thread the 1-1/2 in. check valve into the discharge of your pump.
2. Slide 1-1/4 in. flexible hose on top of the check valve and tighten a hose clamp to ensure there
are no leaks.
o For permanent installation, using PVC Cement attach a 1-1/2 in. PVC slip coupler to the
top of the check valve. Attach the 1-1/2 in. PVC discharge pipe to the PVC slip coupler.
Allow for proper curing time as suggested by the PVC Cement manufacturer.
- Note: use Teflon tape on all threaded connections to prevent leaks.
  • Page 1 1

Water Source SPC250 Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI