Toro 8" x 3' Soil Chain Kit, Dingo Compact Utility Loader Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Toro 8" x 3' Soil Chain Kit, Dingo Compact Utility Loader Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Form No. 3353-224 Rev -
8in x 3ft Soil Chain Kit
For Dingo® Compact Utility Loaders
Model No. 108–5539
Installation Instructions
Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Step
Description
Qty.
Use
1
No parts required
Remove the spoils auger.
Left soil tooth
1
Right soil tooth
1
8 inch spacer
3
Bolt (3/8 x 2-1/2 inches)
10
2
Locknut (3/8 inch)
5
Install the teeth.
3
No parts required
Install the spoils auger.
Note: Deter mine the left and right sides of the mac hine from the nor mal operating position.
Step
1
Removing the Spoils Auger
No Parts Required
Procedure
1. Lo w er the loader ar ms , stop the engine , and
remo v e the k ey .
2. R emo v e the bolt and n ut securing the spoils
aug er to the trenc her ( Figure 17 ).
3. Star t the engine and raise the loader ar ms
slightly (2 to 3 inc hes).
4. Stop the engine and remo v e the k ey .
5. R emo v e the aug er and retain the bolt and n ut.
Step
2
Installing the Teeth
Parts needed for this step:
1
Left soil tooth
1
Right soil tooth
3
8 inch spacer
10
Bolt (3/8 x 2-1/2 inches)
5
Locknut (3/8 inch)
Procedure
T he c hain on y our trenc her comes from the
factor y with teeth designed to dig a 6 inc h trenc h
in soil. T his kit contains the par ts y ou need to
con v er t the c hain into an 8 inc h cutting width
c hain. T he c hain has 32 links , and eac h link can
ha v e dig ging teeth fastened to it and is refer red
to as a tooth position. F or the 8 inc h soil c hain,
© 2005—The Toro® Company
8111 Lyndale Avenue South
Bloomington, MN 55420
Register at www.Toro.com. Original Instructions (EN)
Printed in the USA.
All Rights Reserved
the a teeth are fastened onto ev er y other link, for
a total of 16 teeth. At eac h tooth position, the
teeth are fastened in v arious configurations with
spacers and tubes to v ar y the width of cut. T he
tooth configurations are ar rang ed along the c hain
to maximize dig ging efficiency .
T he teeth are cupped differently de pending on the
side of the c hain to whic h they are fastened (left
or right). T he teeth are fastened to the c hain links
with bolts , n uts , tubes , and spacers of v ar ying sizes .
1. Lo w er the loader ar ms .
Note: Y ou do not need to tur n the engine
on to lo w er the ar ms .
2. R emo v e all of the teeth and other hardw are
from the top span of the c hain.
Important: W hen r emo ving teeth, k eep
the components of each tooth set to gether
so that y ou can assemble them later . Some
of the teeth y ou r emo v e will be r equir ed
later in this pr ocedur e.
3. Star t the engine , raise the trenc her slightly off
the g round using the loader ar ms , and slo wly
r un the c hain forw ard to mo v e the other 16
links to the top .
4. Lo w er the loader ar ms , stop the engine , and
remo v e the k ey .
5. R emo v e the remaining teeth and other
hardw are from the c hain.
6. On an empty c hain link in the front of the
trenc her , install a right soil tooth on the left
side of the c hain as illustrated in Figure 1 .
Important: Ensur e that the teeth point
f orw ard, a w ay fr om the tr encher body .
Figure 1
1. Chain link
4. Bolt (3/8 x 7/8 inch)
2. Right soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
7. T w o c hain links behind the first tooth y ou
installed, to w ard the body of the trenc her ,
install a right soil tooth on the right side of the
c hain as illustrated in Figure 2 .
Figure 2
1. Chain link
4. Bolt (3/8 x 7/8 inch)
2. Right soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
2
8. T w o c hain links bac k, install a left soil tooth
on the left side of the c hain as illustrated in
Figure 3 .
Figure 3
1. Chain link
4. Bolt (3/8 x 7/8 inch)
2. Left soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
9. T w o c hain links bac k, install right and left soil
teeth on both sides of the c hain as illustrated
in Figure 4 .
Figure 4
1. Chain link
5. Bolt (3/8 x 1-1/4 inches)
2. Left soil tooth 6. Tube
3. Right soil tooth
7. Locknut (3/8 inch)
4. Bolt (3/8 x 4 inches)
8. Spacer
10. T w o c hain links bac k, install right and left soil
teeth on both sides of the c hain as illustrated
in Figure 5 .
Figure 5
1. Chain link
4. Bolt (3/8 x 2-1/2 inches)
2. Left soil tooth 5. 8 inch spacer
3. Right soil tooth
6. Locknut (3/8 inch)
11. T w o c hain links bac k, install a left soil tooth
on the right side of the c hain as illustrated in
Figure 6 .
Figure 6
1. Chain link
4. Bolt (3/8 x 7/8 inch)
2. Left soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
3
12. T w o c hain links bac k, install a left soil tooth
on the left side of the c hain as illustrated in
Figure 7 .
Figure 7
1. Chain link
4. Bolt (3/8 x 7/8 inch)
2. Left soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
13. T w o c hain links bac k, install a right soil tooth
on the right side of the c hain as illustrated in
Figure 8 .
Figure 8
1. Chain link
4. Bolt (3/8 x 7/8 inch)
2. Right soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
14. T or que all bolts and n uts y ou installed
previously to 27 to 33 ft-lb (37 to 45 N m).
15. Star t the engine , raise the trenc her slightly off
the g round using the loader ar ms , and slo wly
r un the c hain forw ard to mo v e the other 16
links to the top .
16. Lo w er the loader ar ms , stop the engine , and
remo v e the k ey .
17. T w o c hain links bac k from the last tooth y ou
installed, install right and left soil teeth on both
sides of the c hain as illustrated in Figure 9 .
Figure 9
1. Chain link
5. Bolt (3/8 x 1-1/4 inches)
2. Left soil tooth 6. Tube
3. Right soil tooth
7. Locknut (3/8 inch)
4. Bolt (3/8 x 4 inches)
8. Spacer
18. T w o c hain links bac k, install right and left soil
teeth on both sides of the c hain as illustrated
in Figure 10 .
Figure 10
1. Chain link
4. Bolt (3/8 x 2-1/2 inches)
2. Left soil tooth 5. 8 inch spacer
3. Right soil tooth
6. Locknut (3/8 inch)
4
19. T w o c hain links bac k, install a right soil tooth
on the left side of the c hain as illustrated in
Figure 11 .
Figure 11
1. Chain link
4. Bolt (3/8 x 7/8 inch)
2. Right soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
20. T w o c hain links bac k, install a right soil tooth
on the right side of the c hain as illustrated in
Figure 12 .
Figure 12
1. Chain link
4. Bolt (3/8 x 7/8 inch)
2. Right soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
21. T w o c hain links bac k, install a left soil tooth
on the left side of the c hain as illustrated in
Figure 13 .
Figure 13
1. Chain link
4. Bolt (3/8 x 7/8 inch)
2. Left soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
22. T w o c hain links bac k, install right and left soil
teeth on both sides of the c hain as illustrated
in Figure 14 .
Figure 14
1. Chain link
5. Bolt (3/8 x 1-1/4 inches)
2. Left soil tooth 6. Tube
3. Right soil tooth
7. Locknut (3/8 inch)
4. Bolt (3/8 x 4 inches)
8. Spacer
5
23. T w o c hain links bac k, install right and left soil
teeth on both sides of the c hain as illustrated
in Figure 15 .
Figure 15
1. Chain link
4. Bolt (3/8 x 2-1/2 inches)
2. Left soil tooth 5. 8 inch spacer
3. Right soil tooth
6. Locknut (3/8 inch)
24. T w o c hain links bac k, install a left soil tooth
on the right side of the c hain as illustrated in
Figure 16 .
Figure 16
1. Chain link
4. Bolt (3/8 x 7/8 inch)
2. Left soil tooth 5. Tube
3. Bolt (3/8 x 2-1/2 inches) 6. Locknut (3/8 inch)
25. T or que all bolts and n uts y ou installed
previously to 27 to 33 ft-lb (37 to 45 N m).
Step
3
Installing the Spoils Auger
No Parts Required
Procedure
Important: F ailing to position the spoils
auger cor r ectl y may dama ge the tr encher .
1. Star t the engine and raise the loader ar ms
slightly (2 to 3 inc hes).
2. Stop the engine and remo v e the k ey .
3. Using the bolt and n ut y ou remo v ed previously ,
connect the spoils aug er to the aug er shaft.
P air the hole far thest from the aug er blade , in
the end of the aug er with 1 hole , with the inner
hole on the shaft ( Figure 17 ).
Figure 17
1. Spoils auger
2. Hole position for a 4 inch chain.
3. Hole position for a 6 inch chain.
4. Hole position for a 8 inch chain.
5. Hole position for a 12 inch chain.
6
4. T or que the bolt and n ut to 75 ft-lb (101 N m).
5. Lo w er the loader ar ms .
7
/