GE PVW7301SJSS Installation guide

Category
Cooker hoods
Type
Installation guide

This manual is also suitable for

GE PVW7301SJSS Glass Wall Chimney Vent Hood features a 2-speed, 200-CFM motor that effectively removes smoke, grease, and odors from the air. It also has a dishwasher-safe aluminum mesh filter that captures grease and is easy to clean. With its sleek design and powerful performance, this vent hood is a great addition to any kitchen.

GE PVW7301SJSS Glass Wall Chimney Vent Hood features a 2-speed, 200-CFM motor that effectively removes smoke, grease, and odors from the air. It also has a dishwasher-safe aluminum mesh filter that captures grease and is easy to clean. With its sleek design and powerful performance, this vent hood is a great addition to any kitchen.

Glass Wall Chimney
Vent Hoods
Installation
Instructions
BEFORE YOU BEGIN
Read these instructions carefully and completely.
■ IMPORTANTSavetheseinstructionsfor
localinspector’suse.
■ IMPORTANTObserveallgoverningcodes
andordinances.
■ Note to Installer – Besuretoleavetheseinstructions
withConsumer.
■ Note to Consumer – Keeptheseinstructionsfor
futurereference.
■ Skill level –Installationofthisappliancerequiresa
qualiedinstallerorelectrician.
■ Completion time –Approximately1to3hours
■ Properinstallationistheresponsibilityoftheinstaller.
■ Productfailureduetoimproperinstallationisnot
coveredunderWarranty.
FOR YOUR SAFETY:
WARNING
Beforebeginningtheinstallation,
switchpoweroffattheservicepanelandlockthe
servicedisconnectingmeanstopreventpowerfrom
beingswitchedonaccidentally.Whentheservice
disconnectingmeanscannotbelocked,securely
fastenaprominentwarningdevice,suchasatag,to
theservicepanel.
WARNING
TO REDUCE THE RISK OF FIRE,
ELECTRIC SHOCK OR INJURY TO PERSONS,
OBSERVE THE FOLLOWING:
A.Installationworkandelectricalwiringmustbe
donebyqualiedperson(s)inaccordancewithall
applicablecodesandstandards,includingre-rated
construction.
B.Sufcientairisneededforpropercombustionand
exhaustingofgasesthroughtheue(chimney)of
fuelburningequipmenttopreventbackdrafting.
Followtheheatingequipmentmanufacturer’s
guidelinesandsafetystandardssuchasthose
publishedbytheNationalFireProtection
Association(NFPA),theAmericanSocietyfor
Heating,RefrigerationandAirConditioning
Engineers(ASHRAE)andthelocalcode
authorities.
C.Whencuttingordrillingintowallorceiling,donot
damageelectricalwiringandotherhiddenutilities.
D.Ductedfansmustalwaysbeventedtothe
outdoors.
E.Turnoffbreakertoadjacentroomswhileworking.
WARNING
TO REDUCE THE RISK OF FIRE,
USE ONLY METAL DUCT WORK.
CAUTION
Duetotheweightandsizeof
theseventhoodsandtoreducetheriskofpersonal
injuryordamagetotheproduct,TWO PEOPLE ARE
REQUIRED FOR PROPER INSTALLATION.
If you have questions, call GE Appliances at 800.GE.CARES (800.432.2737)
or visit our website at: GEAppliances.com
PVW7301, PVW7361
(991.0364.613rev2)31-11007-202-17GEA
2 31-11007-2
Installation Instructions
INSTALLATION CLEARANCES
Theseventhoodsaredesignedtobeinstalledontoa
wallwithnoabovecabinets.
•Installthesehoodsbetweenthe24”required
minimumand36”recommendedmaximumabove
thecookingsurface.
Theventhoodmustbeinstalledbetweenthe24”
requiredminimumand36”recommendedmaximum
abovethecookingsurface.Thehoodinstallation
heightabovethecookingsurfacedependsupon
ceilingheightandductcoverlimitations.The
telescopicductcoverconcealstheductworkrunning
fromthetopofthehoodtotheceiling.Forsupplied
ductcoverceilingheights,seetableonpage5.
NOTE: Installationheightshouldbemeasuredfrom
thecookingsurfacetothelowestpartofthehood.
Thishoodmustbeinstalledontoawall.Itcanbe
ventedtotheoutdoors,oritcanbeinstalledfor
recirculatingoperation.Forrecirculationoperation,see
Recirculation Install Planning.
24”RequiredMin.
36”RecommendedMax.
PRODUCT DIMENSIONS
30”to36”
15-3/4”
15-3/4”
18-1/2”
14-3/16”
14-3/16”
1-7/16"
1/4"
21-1/4”
26-1/2"Min-37-1/2"Max.
11-13/16”
10-1/4”
2-9/16”
4-15/16”
4-15/16”
31-11007-2 3
Installation Instructions
POWER SUPPLY
IMPORTANT – (Please read carefully)
WARNING
FORPERSONALSAFETY,THISAPPLIANCEMUST
BEPROPERLYGROUNDED.
Removehousefuseoropencircuitbreakerbefore
beginninginstallation.
Donotuseanextensioncordoradapterplugwith
thisappliance.FollowNationalElectricalCodesor
prevailinglocalcodesandordinances.
Electrical supply
Theseventhoodsmustbesuppliedwith120V,60Hz,
andconnectedtoanindividual,properlygrounded
branchcircuit,andprotectedbya15or20ampcircuit
breakerortimedelayfuse.
•Wiringmustbe2wirewithground.
•Iftheelectricalsupplydoesnotmeettheabove
requirements,callalicensedelectricianbefore
proceeding.
•Routehousewiringasclosetotheinstallation
locationaspossibleintheceilingorwall.
•Connectthewiringtothehousewiringinaccordance
withlocalcodes.
Grounding instructions
Thegroundingconductormustbeconnectedto
agroundmetal,permanentwiringsystem,oran
equipment-groundingterminalorleadonthehood.
WARNING
Theimproperconnectionofthe
equipment-groundingconductorcanresultinarisk
ofelectricshock.Checkwithaqualiedelectricianor
servicerepresentativeifyouareindoubtwhetherthe
applianceisproperlygrounded.
ADVANCE PLANNING
Duct Install Planning
• Thishoodisdesignedtobeventedvertically
throughtheceiling.Usea6"roundduct.Uselocally
suppliedelbowstoventhorizontallythroughtherear
wall.
• Usemetalductworkonly.
• Determinetheexactlocationoftheventhood.
• Plantherouteforventingexhausttotheoutdoors.
Tomaximizetheventilationperformanceofthevent
system:
1.Minimizetheductrunlengthandnumberof
transitionsandelbows.
2.Maintainaconstantductsize.
3.Sealalljointswithducttapetopreventanyleaks.
4.Donotuseanytypeofexibleducting.
• Installawallcaporroofcapwithdamperatthe
exterioropening.Purchasethewallorroofcapand
anytransitionandlengthofductneededinadvance.
• Whenapplicable,installanymakeup(replacement)
airsysteminaccordancewithlocalbuildingcode
requirements.VisitGEAppliances.comforavailable
makeupairsolutions.
Recirculation Install Planning
Arecirculationduct(included)andonecharcoal
lter(notincluded)arenecessaryforrecirculation
installation.
Power Supply Planning
Thelocationofthepowersupplyconnectioniscalled
outinthePrepare the Wallsectiononpage6.
4 31-11007-2
Installation Instructions
TOOLS AND MATERIALS
REQUIRED (NOTSUPPLIED)
PLAN THE INSTALLATION
CAUTION
Toreduceriskofreandto
properlyexhaustair,besuretoducttheairoutside
–Donotventexhaustairintospaceswithinwallsor
ceilingsorintoattics,crawlspaces,orgarages.
PARTS SUPPLIED FOR INSTALLATION
•1HardwarePackage
•1LiteraturePackage
PARTS NEEDED FOR INSTALLATION
•1StrainRelief
•PowerSupplyCable
•1WallorRoofCap(forductedventingonly)
•AllMetalDuctwork(forductedventingonly)
•RecirculationDuct(forrecirculationinstallonly)
WARNING
PERSONAL INJURY HAZARD
Becauseoftheweightandsizeoftherangehood
canopy.Itisrecommendedthat2peopleareused
toinstalltherangehood.Failuretoproperlylift
rangehoodcouldresultindamagetotheproductor
personalinjury.
NOTE: Thisrangehoodcanbeinstalledaseither
ductedorrecirculation.Inaductedapplication,this
rangehoodcanbeventedthroughthewallorceiling.
Wheninstalledforrecirculation,therangehoodvents
outthesidesoftheductcover.
NOTE: Beforemakinganycutsorholesfor
installation,determinewhichventingmethodwillbe
usedandcarefullycalculateallmeasurements.
REMOVE THE PACKAGING
CAUTION
Wearglovestoprotectagainst
sharpedges.
•Removetheductcovers.
•Removethehardwarebag,literaturepackageand
otherboxedparts.
•Removeandproperlydiscardtheprotectiveplastic
wrappingandotherpackagingmaterials.
Wirecutter/stripper
Level
Aluminized
Ducttape
Safetyglasses
Phillipsscrewdriver
Strainrelieffor
junctionbox
Strain Relief I
Electricdrillwith#2Phillips,at
head,and9/32"drillbit
ULlistedwirenuts
Wire Nuts
Pencilandtapemeasure
31-11007-2 5
Installation Instructions
RANGE HOOD COMPONENTS
RECIRCULATION COMPONENTS HARDWARE COMPONENTS
INSTALLATION DIMENSIONS
TheGlassChimneyHoodsareadjustableand
designedtomeetvaryingceilingheights.Theduct
coverscanbeadjustedforceilingsbetween
7’4-1/4”and9’3-1/4”dependingonthedistance
betweenthebottomofthehoodandthecooktop
(distanceX).
A. CanopySection
B. UpperDuctCover
C. LowerDuctCover
D. MountingScrews
E. DuctCover
MountingBrackets
F. Damper
G. DuctCoverScrews
H. MountingBracket
I. Washers
J. CanopyMounting
Anchors
K. DuctCoverAnchors
L. DryWallSelf-
TappingScrews
(forJunctionBox)
A
D
F
E
D
D
G
G
G
J
H
I
I
C
B
K
K
K
RecirculationDuct
Recirculation
Bracket
RecirculationDuct
Extensions
5-1/8”min
16-1/8”max
21-3/8”
1-3/4”
36”
X
18-1/2”
X=DistanceFromHoodTo
Cooktop
(Variesdependingoninstallation)
RequiredMin-24”,
RecommendedMax-36”
alsoconsultcooktop
manufacturer’srecommendation
Forhigherceiling
installationsup
to10’,usethe
HighCeilingDuct
CoverKitfor
yourmodel.Use
JXDC71SSfor
StainlessSteel,
orJXDC71ESfor
Slate.
Toreacha10’
ceilingwith
theJXDC72
accessory,the
bottomofthe
hoodmustbea
minimumof36”
fromthecooktop.
CabinetBase
Upper
DuctCover
Lower
DuctCover
Canopy
Required Min & Recommended
Max Ceiling Height Examples
x=24" x=36"
Min Min
7'4-1/4" 8'4-1/4"
Max Max
8'3-1/4" 9’3-1/4"
D G J K L
6 31-11007-2
Installation Instructions
PREPARE THE WALL
Hood Body
1. Putaprotectivecoveringoverthesurfacebelow
thelocationofthehoodtoprotectfromdirtand/or
damage.
2. Determineandmarkthecenterlineonthewall(draw
lineuptotheceiling)wheretherangehoodwillbe
installed.Basedontheceilingheight,determinethe
distance24”requiredmin,36”recommendedmax
(X)neededbetweenthecookingsurface(B)andthe
bottomofthehood.Tothisdistance,add12-5/8”and
drawahorizontalline(A)about24”longcenteredon
theverticalcenterline(C).
3. Alignthetopedgeofthemountingbracketwiththe
horizontalline(A).Alignthecenternotchesofthe
bracketwiththecenterline(C)andmarkthecenter
ofthebracketholes.Removethebrackettodrill
the2canopymountinganchorsintothewallatthe
markings.Placethemountingbracketbackonthe
wallandinstallthe2mountingscrewswith2washers
intotheanchors.Tightenscrews.
4. Drawasecondhorizontalline(D)thatis1”added
fromthe(X)distance.Drillaholeintothewallwitha
9/32”drillbitattheintersectionofthehorizontalline
(D)andverticalcenterline(C).Insertaductcover
anchor.
Duct Covers and Power Supply
1. Placeoneoftheductcoverbracketsagainstthe
wallsothatitstopedgeis1/16”fromtheceilingand
level.Alignthecenternotchesofthebracketandthe
centerline(C)andmarkthecentersofthebracket
holes.Removethebrackettodrillthe2holesfor
installationwitha9/32”drillbit,andinserttheduct
coveranchors.Placethebracketbackonthewall
andinstallthe2mountingscrewsintotheanchors.
Tightenscrews.
2. Placetheotherductcoverbracketonthewallso
thatitstopedgeis15-1/2”fromtheceilingandlevel.
Alignthecenternotchesofthebracketandthe
centerline(C)andmarkthecentersofthebracket
holes.Removethebrackettodrillthe2holesfor
installationwitha9/32”drillbit,andinserttheduct
coveranchors.Placethebracketbackonthewall
andinstallthe2mountingscrewsintotheanchors.
Tightenscrews.
3. Determineandmarkwheretheholewillbedrilledfor
thepowersupplycabletoberunthroughthewall.
Thecenteroftheholecanbelocated4”totheleftor
rightofthecenterline(C)whileremainingbetween4”
and13”downfromtheceiling.Oncethecenterofthe
holeismarked,drilla1¼”diameterhole.
A
C
B
12-5/8"
1"
X
24to36"
D
C
A
HoodMounting
Bracket
MountingScrews&Washers
DrillHere
1/16"
C
4” 4”
4to13”
from
Ceiling
Ceiling
151/2”
31-11007-2 7
Installation Instructions
PREPARE HOOD FOR INSTALLATION
Removethegreaselterfromthe
unitandsetaside.Thegreaselter
isremovedbypressingthehandle
infrontofthelter.Whenreplacing,
makesurethatthelterisproperly
positionedwiththehandlesinfront
andvisible.
Vented Installations
1.Securelypressthedamperontopoftheexhaust
opening.Checkthatthedamperopensfreely.
2.Removeandproperlydiscardtheprotectiveplastic
wrappingfromthehoodandgreaselter.
3.GotoMount the Glass Range Hood section.
Non-vented (ductless) Installations
NOTE: Arecirculationduct,extensions,andbracket
areallincludedwiththehoodandarenecessaryfor
recirculationinstallation.Acharcoallter,notincluded,is
alsoneededforrecirculationinstallation.Thedamperis
notinstalledontheunitwithrecirculationinstallation.
1.Installtherecirculationductextensionstothe
recirculationduct.
2.Attachtherecirculationductmountingbrackettothe
recirculationductusingtheductcoverscrewsupplied
withthehardwarepackage.
3.Fittherecirculationductwithextensionsoverthe
ventexhaustoutletandpushdowntoseatonoutlet.
Attachtheverticalductworktothetopofthehood.
Checkthattherecirculationductisintheproper
orientation(holefacingtowardsthebackofthe
hood).
4.GotoMounttheGlass Range Hoodsection.
MOUNT THE GLASS RANGE HOOD
NOTE:Ifductless(recirculation)installation,followsteps
1-6.Ifductedinstallation,followsteps1-3.
1.Using2ormorepeople,lifttherangehoodandplace
onthehoodmountingbracket.Makesurethebracket
fullyengagestheholesonthehoodbody.
2.Placeamountingscrewintotheductcoveranchor
atthecenterslotprovidedonthebottomoftheback
sideofthehood.Securelytighten.
3.Securethehoodtothemountingbracketbyfastening
aductcoverscrewinhole(B)onbothsidesof
bracketshownpreviously
AttachUsing
DuctCover
Screw
Recirculation
Ductwith
Extensions
VentExhaust
Outlet
NOTE:Hole
mustbefacing
towardback
ofhood.
B
Hood
Mounting
Bracket
DuctCover
Screw
Hood
MountingScrew
8 31-11007-2
Installation Instructions
MOUNT THE GLASS RANGE HOOD
(Continued)
4.Removethetopductcoverbracketfromthewall.
5.Alignthetopedgeoftheductcoverbracketwith
thetopedgeoftherecirculationductmounting
bracketthatisattachedtotherecirculationduct.
Alignthecenternotchesofeachbracket.Place
bothbracketsbackontothewallintheprevious
position.Installthe2mountingscrewsintothe
anchorsandsecurelytighten.
6.AttachtheCHARCOAL
FILTER(notincluded).
FINISH THE INSTALLATION
1.Ducted installation only:Connectthehouse
ductingtothedamperonthehoodbody.Sealall
connectionswithducttape.
2.For ducted and recirculation installation:Install
theupperductcover.Slightlyspreadthesidesof
thecoverapartandhookthembehindtheduct
covermountingbrackets.Attachthecovertothe
bracketswith4ductcoverscrews.
NOTE:Dependingontheceilingheightandhood
installheight,theupperductcovercanbeinstalled
withtheexhaustventsonthetoptowardsthe
ceiling,oriptheductcoverandhidetheexhaust
ventsunderthelowerductcover.
3.Installthelowerductcover.Slightlyspreadthe
sidesofthecoverapartandhookthembehindthe
upperductcoverandthewall.Slidethelowerduct
coverdowntotsecurelyintothetopoftherange
hood.
4.Finishattachingthelowerductcovertothe
chimneyoftheventhoodwith2ductcoverscrews
intoholesonbothsidesofthecover.
5.Reinstallthemetalgreaseltertotheventhood.
6.Turnthepowersupplyon.Turnonblowerand
light.Iftherangehooddoesnotoperate,checkthat
thecircuitbreakerisnottrippedorthehousefuse
blown.Iftheunitstilldoesnotoperate,disconnect
thepowersupplyandcheckthatthewiring
connectionshavebeenmadeproperly.
ELECTRICAL CONNECTION
1.Removethecoverfromtheeldwiring
compartment.FeedthePowerSupplyCable
throughtheholeinthecompartment.
2.ConnectthePowerSupplyCabletotherange
hoodjunctionboxthroughtheholethatwasdrilled
inthe“PreparingtheWall”sectiononpage6.
AttachtheWhiteleadofthepowersupply(A)to
theWhiteleadoftherangehood(D)withawire
nut.AttachtheBlackleadofthepowersupply(B)
totheBlackleadoftherangehood(C)withawire
nut.ConnecttheGreen(E)(GreenandYellow)
ground
wireunder
theGreen
grounding
screw.
3.Securethe
junction
boxtothe
wallusing
2drywall
self-tapping
screwsintothetwodiagonalholesinthejunction
box.Reattachtheeldwiringcompartmentcover.
Ceiling
TopDuct
Cover
Bracket
Recirculation
DuctBracket
Secure
junctionbox
tothewall
usingthese
holes.
A
D
B
C
E
E
Ascrewhole
islocatedon
eachsideof
theductcover.
Pared de Vidrio Campanas
de Ventilación de la Chimenea
Instrucciones
de instalación
ANTES DE COMENZAR
Lea estas instrucciones por completo y con detenimiento.
■ IMPORTANTE Guardeestasinstrucciones
paraelusodeinspectoreslocales.
■ IMPORTANTECumplacontodosloscódigos
yordenanzasvigentes.
■ Nota al instalador – Asegúresededejarestas
instruccionesconelConsumidor.
■ Nota al consumidor – Conserveestasinstruccionespara
referenciafutura.
■ Nivel de capacidad – Lainstalacióndeestacampanade
ventilaciónrequierecapacidadesmecánicasyeléctricas
básicas..
■ Tiempo de nalización – Aproximadamente
de1a3horas.
■ Elinstaladortienelaresponsabilidaddeefectuaruna
instalaciónadecuada.
■ LaGarantíanocubrelasfallasdelproductodebidoauna
instalaciónincorrecta.
PARA SU SEGURIDAD:
ADVERTENCIA
Antesdecomenzarlainstalación,
desconectelaenergíadelpaneldeservicioybloqueelos
mediosdedesconexiónparaevitarelaccionamientode
laenergíademaneraaccidental.Cuandolosmediosde
desconexióndeservicionopuedenbloquearse,coloque
sobreelpaneldeservicioundispositivodeadvertenciabien
visible,comounaetiqueta.
ADVERTENCIA
PARA REDUCIR EL RIESGO DE
INCENDIO, DESCARGA ELÉCTRICA
O LESIONES A PERSONAS, CUMPLA CON LOS
SIGUIENTES PUNTOS:
A.Eltrabajodeinstalaciónyelcableadoeléctricodebenser
realizadosporunapersona(s)calicadadeacuerdocon
todosloscódigosyestándaresaplicables,incluyendo
construccionesresistentesalfuego.
B.Esnecesariocontarconsucientecantidaddeaire
paraunacombustiónysalidadegasesadecuadasa
travésdelconducto(chimenea)delequipodeconsumo
decombustible,andeevitarráfagasdeaire.Sigalas
pautasdelfabricantedelequipodecalefacciónylos
estándaresdeseguridad,talescomoaquellospublicados
porlaAsociaciónNacionaldeProteccióncontra
Incendios(NationalFireProtectionAssociation,NFPA),la
SociedadEstadounidenseparalaCalefacción(American
SocietyforHeating),losIngenierosdeRefrigeración
yAcondicionadoresdeAire(RefrigerationandAir
ConditioningEngineers,ASHRAE)ylasautoridadesde
loscódigoslocales.
C.Alcortaroperforarunaparedouncielorraso,nodañeel
cableadoeléctricoydeotrosserviciosocultos.
D.Losventiladoresconconductosiempredebencontarcon
ventilaciónhaciaelexterior.
E.Desconecteeldisyuntordehabitacionesadyacentes
mientrasestétrabajando.
ADVERTENCIA
A FIN DE REDUCIR EL RIESGO
DE INCENDIOS, USE SÓLO CONDUCTOS DE METAL.
PRECAUCIÓN
Debidoalpesoytamañode
estascampanasdeventilaciónyparareducirelriesgode
lesionespersonalesodañosalproducto,SE NECESITAN
DOS PERSONAS PARA REALIZAR UNA INSTALACIÓN
CORRECTA.
¿Preguntas?Llameal800.GE.CARES(800.432.2737)ovisitenuestrositioWeben:GEAppliances.com
PVW7301, PVW7361
(991.0364.613rev2)31-11007-202-17GEA
2 31-11007-2
Preparación para la instalación
ESPACIO DE INSTALACIÓN
Estascampanasdeventilaciónestándiseñadasparaser
instaladasenunaparedsingabinetessuperiores.
●Instaleestascampanasentreelmínimorequeridode24”
yelmáximorecomendadode36”sobrelasuperficiede
cocción.
Lacampanadeventilacióndebeserinstaladaentreel
mínimorequeridode24”yelmáximorecomendadode36”
sobrelasuperciedecocción.Laalturadeinstalaciónde
lacampanasobrelasuperciedecoccióndependedela
alturadelcielorrasoylaslimitacionesdelacubiertadel
conducto.Lacubiertaplegableocultalosconductosquevan
desdelapartesuperiordelacampanahastaelcielorraso.
Paralasalturasdecielorrasodelascubiertasdeconductos,
consultelatabladelapágina5.
NOTA: Laalturadeinstalacióndebemedirsedesde
lasuperciedecocciónhastalapartemásbajadela
campana.Puedecontarconventilaciónhaciaelexterior,
opuedeserinstaladaparaunfuncionamientocon
recirculación.Paraunfuncionamientoconrecirculación,
consultelaPlanicación para la Instalación con
Recirculación.
MínimoRequeridode24”
MáximoRecomendadode36”
DIMENSIONES DEL PRODUCTO
30”to36”
15-3/4”
15-3/4”
18-1/2”
14-3/16”
14-3/16”
1-7/16"
1/4"
21-1/4”
26-1/2"Min-37-1/2"Max.
11-13/16”
10-1/4”
2-9/16”
4-15/16”
4-15/16”
31-11007-2 3
Preparación para la instalación
SUMINISTRO DE ENERGÍA
IMPORTANTE – (Tenga a bien leer cuidadosamente)
ADVERTENCIA
PARASEGURIDADPERSONAL,ESTEAPARATODEBE
CONECTARSEATIERRADEMANERAADECUADA.
Quiteelfusibleoabraelinterruptordecircuitosantesde
comenzarlainstalación.
Noutiliceuncabledeextensiónounenchufeadaptador
conesteartefacto.SigalosCódigosEléctricosNacionaleso
códigosyordenanzaslocalesvigentes.
Suministro eléctrico
Estascampanasdeventilacióndebencontarconun
suministrode120V,60Hz,debenestarconectadasaun
circuitoderivadoindividualconunaadecuadaconexióna
tierraydebencontarconlaproteccióndeuninterruptorde
circuitosounfusibleconretrasode15o20amperios.
●Elcableadodebeserde2hilosconconexiónatierra.
●Sielsuministroeléctriconocumpleconlosrequisitos
anteriores,llameaunelectricistaconlicenciaantesde
continuar.
●Dirijaelcableadodomésticolomáscercaposiblea
laubicacióndelainstalación,enelcielorrasoopared
trasera.Verpágina14paramásdetalles.
●Conecteelcableadoalcableadodomésticoen
cumplimientoconloscódigoslocales.
Instrucciones de conexión a tierra
Elconductoratierradebeconectarseaunmetalcon
conexiónatierra,unsistemadecableadopermanenteouna
terminaloconductordeconexiónatierradelequipamiento
enlacampana.
ADVERTENCIA
Unaconexióninadecuadadel
conductordeconexiónatierradelequipamientopuede
provocarunriesgodedescargaeléctrica.Consulteaun
electricistacalicadoorepresentantedeserviciotécnicosi
tienedudassobrelacorrectaconexiónatierradelartefacto.
PLANIFICACIÓN PREVIA
Planicación para la Instalación con Conducto
●Estacampanaestádiseñadaparaventilarse
enformaverticalatravésdelcielorraso.Useunconducto
circularde6”.Utilicecodossuministradosenformalocal
paraventilaciónhorizontalatravésdelaparedtrasera.
●Determinelaubicaciónexactadelacampana
deventilación.
●Planiqueelrecorridodelasalidadeventilaciónhacia
elexterior.Andemaximizarelrendimientodela
ventilacióndelsistemadeventilación:
1.Minimicelalongituddelconductoyelnúmerode
transicionesycodos.
2.Mantengauntamañodeconductoconstante.
3.Selletodaslasjuntasconcintaparaconductosande
evitarpérdidas.
4.Noutiliceconductosexiblesdeningúntipo.
●Instaleunacubiertadeparedocasquete
detechoconunreguladordetiroenlaaberturaexterior.
Soliciteporadelantadolacubiertadeparedoelcasquete
detechoycualquiertransiciónolongituddeconducto
necesarios.
●Cuandocorresponda,instaleunsistemadereposición
(reemplazo)deairedeacuerdoconlosrequisitosdel
códigolocaldeconstrucción.Paraaccederasoluciones
deairedisponibles,visiteGEAppliances.com.
Planicación de Instalación con Recirculación
Unconductoderecirculación(incluido)yunltrode
carbón(noincluido)sonnecesariosparalainstalacióncon
recirculación.
Planicación del Suministro de Corriente
Laubicacióndelaconexióndelsuministrodecorrientees
indicadaenlaseccióndePreparacióndelaParedenla
página6.
4 31-11007-2
Preparación para la instalación
HERRAMIENTAS Y MATERIALES
REQUERIDOS (NOSUMINISTRADOS)
PLAN DE INSTALACIÓN
PRECAUCIÓN
Andereducirriesgosde
incendiosyparaqueelairesalgadeformaapropiada,
asegúresedequeelaireseaconducidohaciafuera-No
ventileelairedelasalidahaciaespaciosdentrodeparedes
ocielorrasosoáticos,espaciosmuybajosogarajes.
PIEZAS PROVISTAS PARA LA INSTALACIÓN
●1PaquetedeHerramientas
●1PaqueteEscrito
PIEZAS NECESARIAS PARA LA INSTALACIÓN
1AmortiguadordeRefuerzo
CabledeSuministrodeCorriente
UnaTapadeParedoTecho(paraventilacióncon
conductoúnicamente)
TodalaTuberíaMetálica(paraventilaciónconconducto
únicamente)
ConductodeRecirculación(parainstalacióncon
recirculaciónúnicamente)
ADVERTENCIA
! RIESGO DE LESIONES PERSONALES
Debidoalpesoytamañodelabasedelacampana
extractora.Esrecomendablequelacampanaextractorasea
instaladapor2personas.Silacampananoeselevadade
formacorrecta,sepodránproducirdañossobreelproducto
olesionespersonales.
NOTA: Estacampanapuedeserinstaladaconconducto
oconrecirculación.Enunaaplicaciónconconducto,esta
campanapuedeserventiladaatravésdelaparedodel
cielorraso.Alserinstaladaporrecirculación,lacampana
ventilahaciaafueraloscostadosdelacubiertadel
conducto.
NOTA: Antesderealizarcualquiercorteoagujeroparala
instalación,determinequémétododeventilaciónseráusado
yconcuidadocalculetodaslasmedidas.
QUITE EL ENVOLTORIO
PRECAUCIÓN
Seguantesparaprotegersede
losbordesalados.
●Quitelascubiertasdelosconductos.
●Quitelabolsadepiezas,elpaquetedeinstruccionesy
otraspiezasencajas.
●Quiteydescarteadecuadamenteelenvoltorioplásticode
protecciónyotrosmaterialesdeempaque.
Alicatepelacables
Nivel
Cintaaislante
dealuminio
Gafasdeseguridad
Destornilladordeestrella
Aliviodetensiónpara
lacajadeconexiones
Strain Relief I
BrocaeléctricaconPhillipsNº2de
cabezaplanaybrocade9/32”
Taponesdealambre
aprobadosporUL
Wire Nuts
Lápizycintamétrica
31-11007-2 5
Preparación para la instalación
COMPONENTES DE LA CAMPANA
EXTRACTORA
COMPONENTES DE RECIRCULACIÓN COMPONENTES DE LAS
HERRAMIENTAS
DIMENSIONES DE INSTALACIÓN
LasCampanasconChimeneadeVidriosonajustablesy
estándiseñadasparaadaptarseadiferentesalturasde
cielorraso.Lascubiertasdelosconductospuedenser
ajustadasparacielorrasosdeentre7’41/4”y9’31/4”,
dependiendodeladistanciaentrelaparteinferiordela
campanaylasuperciedecocción(distanciaX).
A. SeccióndelaBase
B. CubiertadelConducto
Superior
C. CubiertadelConducto
Inferior
D. TornillosdeMontaje
E. SoportesdeMontajede
laCubiertadelConducto
F. Regulador
G. TornillosdelaCubierta
delConducto
H. SoportedeMontaje
I. Arandelas
J. SoportesdeMontajede
laBasedelaCampana
K. SoportesdelaCubierta
delConducto
L. TornillosAutorroscantes
paraParedSeca(Para
laCajadeEmpalmes)
A
D
F
E
D
D
G
G
G
J
H
I
I
C
B
K
K
K
ConductodeRecirculación
SoportedeRe-
circulación
ExtensionesdelCon-
ductodeRecirculación
Mín.de51/8”
Máx.de161/8
21-3/8”
1-3/4”
36”
X
18-1/2”
X = Distancia Desde la Campana
Hasta la Supercie de Cocción
(Varíadependiendodela
instalación)MínimoRequerido–24”,
MáximoRequerido–36”;
tambiénconsultelarecomendación
delfabricantedecocinas
Parainstalaciones
encielorasos
másaltosde
hasta10’,useel
KitdelCobertor
deTuberíaspara
CieloRasos
acordeasu
modelo.Useel
JXDC71SSpara
AceroInoxidable,
oelJXDC71ES
paraLosa.
Parallegaraun
cielorasode10’
conelaccesorio
JXDC72,laparte
inferiordela
campanadeberá
estaraunmínimo
de36”desde
lasuperciede
cocción.
BasedelGabinete
Cubiertadel
ConductoSuperior
Cubiertadel
ConductoInferior
Dosel
Ejemplos de Altura Mínima
Requerida y Altura Máxima
Recomendada de Cielorraso
x=24" x=36"
Mín Mín
7'4-1/4" 8'4-1/4"
Máx Máx
8'3-1/4" 9’3-1/4"
D G J K L
6 31-11007-2
Preparación para la instalación
PREPARE LA PARED
Cuerpo de la Campana
1. Coloqueunacubiertaprotectorasobrelasuperciedebajo
delaubicacióndelacampana,andeprotegerdela
suciedady/odaños.
2. Determineymarquelalíneacentralsobrelapared
(dibujelalíneahaciaarribahastaelcielorraso)dondela
campanaextractoraseráinstalada.Enbasealaalturadel
cielorraso,determineladistanciamínimarequeridade24”
yladistanciamáximarecomendadade36”(X),necesarias
entrelasuperciedecocción(B)ylaparteinferiordela
campana.Aestadistancia,agregue125/8”ydibujeuna
líneahorizontal(A)deaproximadamente24”delongitud
centradasobrelalíneacentralvertical(C).
3. Alineeelextremosuperiordelsoportedemontajeconla
líneahorizontal(A).Alineelasranurascentralesdelsoporte
conlalíneacentral(C)ymarqueelcentrodelosagujeros
delsoporte.Retireelsoporteparaperforarlos2sostenes
demontajedelabaseenlapared,dondeseencuentran
lasmarcas.Vuelvaacolocarelsoportedemontajeenla
paredeinstalelos2tornillosdemontajecon2arandelas
enlossostenes.Ajustelostornillos.
4. Dibujeunasegundalíneahorizontal(D)con1”agregada
desdeladistanciaX.Dibujeunagujeroenlaparedcon
unabrocade9/32”enlainterseccióndelalíneahorizontal
(D)ylalíneacentralvertical(C).Inserteunsosténenla
cubiertadelconducto.
Cubiertas de Conductos y Suministro de Corriente
1. Coloqueunodelossoportesdelacubiertadelconducto
contralapared,demodoquesuextremosuperioresté
a1/16”delcielorrasoyquequedenivelado.Alineelas
ranurascentralesdelsoporteconlalíneacentral(C)y
marqueloscentrosdelosagujerosdelsoporte.Retireel
soporteparaperforar2agujerosparalainstalacióncon
unabrocade9/32”,einsertelossostenesdelacubierta
delconducto.Vuelvaacolocarelsoporteenlaparede
instalelos2tornillosdemontajeenlossostenes.Ajustelos
tornillos.
2. Coloqueelotrosoportedelacubiertadelconductocontra
lapared,demodoquesuextremosuperiorestéa151/2”
delcielorrasoyquequedenivelado.Alineelasranuras
centralesdelsoporteconlalíneacentral(C)ymarquelos
centrosdelosagujerosdelsoporte.Retireelsoportepara
perforar2agujerosparalainstalaciónconunabrocade
9/32”,einsertelossostenesdelacubiertadelconducto.
Vuelvaacolocarelsoporteenlaparedeinstalelos2
tornillosdemontajeenlossostenes.Ajustelostornillos.
3. Determineymarqueellugardondeelagujeroserá
perforadoparaqueelcabledesuministrodecorriente
puedapasaratravésdelapared.Elcentrodelagujero
puedeserubicadoa4”hacialaizquierdaoderechadela
líneacentral(C),mientraspermaneceaentre4”y13”del
cielorraso.Unavezmarcadoelcentrodelagujero,hagaun
agujerode1¼”dediámetro.
A
C
B
12-5/8"
1"
X
24a36"
D
C
A
SoportedeMontaje
delaCampana
TornillosyArandelasdeMontaje
PerforeAquí
1/16"
C
4” 4”
4a13”del
Cielorraso
Cielorraso
151/2”
31-11007-2 7
Preparación para la instalación
PREPARE LA CAMPANA PARA SU INSTALACIÓN
Retireelltrodegrasadelaunidady
dejeelmismoaunlado.Elltrodegrasa
esretiradopresionandolamanijaque
seencuentrafrentealltro.Alrealizar
elreemplazo,asegúresedequeelltro
estécorrectamenteposicionadoconlas
manijasenelfrenteyvisibles.
Instalaciones Ventiladas
1.Deformasegura,presioneelreguladorquese
encuentrasobrelaaberturadelescape.Controleque
elreguladorsepuedaabrirlibremente.
2.Retireydescartedeformaadecuadaelenvoltorio
protectordeplásticodelacampanaydelosltrosde
grasa.
3.ConsultelaseccióndeMontaje de la Campana
Extractora de Vidrio.
Instalaciones sin ventilación (sin conducto)
NOTA: Incluidosconlacampanaseencuentranunconducto
derecirculación,extensionesyunsoporte,ytodosson
necesariosparalainstalaciónconrecirculación.Unltrode
carbón,noincluido,tambiénesnecesarioparalainstalación
conrecirculación.El regulador no está instalado en la
unidad con instalación con recirculación.
1.Instalelasextensionesdelconductoconrecirculaciónal
conductoconrecirculación.
2.Adhieraelsoportedemontajedeconductoscon
recirculaciónalconductomismo,utilizandoeltornillopara
cubiertasdeconductossuministradoconelpaquetede
herramientas.
3.Inserteelconductoderecirculaciónconextensiones
sobrelasalidadelescapedeventilaciónyempujehacia
abajoparaquecoincidaconlasalida.Adhieraelconducto
verticalalapartesuperiordelacampana.Controlequeel
conductoderecirculaciónseencuentreenlaorientación
correcta(conelagujerohacialapartetraseradela
campana).
4.ConsultelaseccióndeMontaje de la Campana
Extractora de Vidrio.
MONTE LA CAMPANA EXTRACTORA DE VIDRIO
NOTA: Sisetratadeunainstalaciónsinconducto
(recirculación),sigalospasos1a6.Sisetratadeuna
instalaciónconconducto,sigalospasos1a3.
1.Entre2omáspersonas,levantenlacampanaextractoray
coloquenelsoportedemontajedelacampana.Asegúrese
dequeelsoporteseadhieracompletamentealcuerpode
lacampana.
2.Coloqueuntornillodemontajeenelsosténdelacubierta
delconducto,sobrelaranuracentralprovistaenlaparte
inferiordelladotraserodelacampana.Ajustedeforma
segura.
3.Asegurelacampanaalsoportedemontaje,ajustando
eltornillodelacubiertadelconductoenelagujero(B)a
ambosladosdelsoportemostradopreviamente.bracket
shownpreviously
Adhierael
mismoUsando
elTornillode
laCubiertadel
Conducto
Conductode
Recirculación
con
Extensiones
Salidadel
Escapedela
Ventilación
NOTA:El
agujerodebe
estarenfrentado
hacialaparte
traseradela
campana.
B
SoportedeMontaje
delaCampana
TornillodelaCubierta
delConducto
Campana
TornillodeMontaje
8 31-11007-2
Preparación para la instalación
MONTE LA CAMPANA
EXTRACTORA DE VIDRIO (continúa)
4.Retiredelaparedelsoportesuperiordelacubiertadel
conducto.
5.Alineeelextremosuperiordelsoportedelacubiertadel
conductoconelextremosuperiordelsoportedemontaje
delconductoderecirculación,elcualestáadheridoal
conductoderecirculación.Alineelasranurascentrales
decadasoporte.Vuelvaacolocarambossoportesen
lapared,enlaposiciónprevia.Instalelos2tornillosde
montajeenlossostenesyajustedeformasegura.
6.AdhieraelFILTRODE
CARBÓN(noincluido)
FINALICE LA INSTALACIÓN
1.Instalaciónconconductoúnicamente:Conecteel
conductohogareñoalreguladordelcuerpodela
campana.Selletodaslasconexionesconcintapara
conducto.
2.Parainstalacionesderecirculaciónyconconducto:
Instalelacubiertadelconductosuperior.Lentamente
separeloscostadosdelacubiertayengancheambos
detrásdelossoportesdemontajedelacubiertadel
conducto.Adhieralatapaalossoportescon4tornillos
delacubiertadelconducto.NOTA:Dependiendodela
alturadelcielorrasoydelaalturadeinstalacióndela
campana,lacubiertadelconductosuperiorpuedeser
instaladaconlasventilacionesdeescapeenlaparte
superiorhaciaelcielorraso,odarlavueltaalacubierta
delconductoyesconderlasventilacionesdeescape
debajodelacubiertadelconductoinferior.
3.Instalelacubiertadelconductoinferior.Lentamente
separeloscostadosdelacubiertayengancheambos
detrásdelacubiertadelconductosuperiorydelapared.
Deslicelacubiertadelconductosuperiorhaciaabajo
parahacerquelamismacoincidadeformaseguracon
lapartesuperiordelacampanaextractora.
4.Finaliceadhiriendolacubiertadelconductoinferiora
lachimeneadelacampanadeventilacióncolocando2
tornillosenlacubiertadelconductosobrelosagujeros
queseencuentranaambosladosdelatapa.
5.Vuelvaainstalarelltrodegrasametálicoalacampana
deventilación.
6.Enciendaelsuministrodecorriente.Enciendael
calefactorylaluz.Silacampanaextractoranofunciona,
controlequeeldisyuntornosehayaactivadooqueel
fusiblehogareñonoestéquemado.Silaunidadaún
nofunciona,desconecteelsuministrodecorrientey
controlequelasconexionesdelcableadohayansido
realizadasdeformacorrecta.
CONEXIÓN ELÉCTRICA
1.Retirelacubiertadelcompartimientodelcableadode
campo.AlimenteelCabledeSuministrodeCorrientea
travésdelagujerodelcompartimiento.
2.ConecteelCabledeSuministrodeCorrientealacaja
deempalmesdelacampanaextractora,atravésdel
agujeroquefuerealizadoenlasecciónde“Preparación
delaPared”enlapágina6.Adhieraelcableblanco
delsuministrodecorriente(A)alcableblancodela
campanaextractora(D)conunatuercaparacable.
Adhieraelcablenegrodelsuministrodecorriente(B)al
cablenegrodelacampanaextractora(C)conunatuerca
paracable.Conecteelcableatierraverde(E)(verdey
amarillo)debajodeltornillodeconexiónatierraverde.
3.Asegurelacajadeempalmesalaparedusando2
tornillos
autorroscantes
parapared
secaenlos
dosagujeros
diagonales
delacajade
empalmes.
Vuelvaa
adherirla
cubiertadel
compartimiento
decableado
decampo.
Cielorraso
Soportede
laCubierta
delConducto
Superior
Soportedel
Conductode
Recirculación
Asegure
lacajade
empalmes
alapared
usandoestos
agujeros.
A
D
B
C
E
E
Lacubiertadel
conductocuenta
conunagujero
paratornilloa
cadaladodela
misma.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16

GE PVW7301SJSS Installation guide

Category
Cooker hoods
Type
Installation guide
This manual is also suitable for

GE PVW7301SJSS Glass Wall Chimney Vent Hood features a 2-speed, 200-CFM motor that effectively removes smoke, grease, and odors from the air. It also has a dishwasher-safe aluminum mesh filter that captures grease and is easy to clean. With its sleek design and powerful performance, this vent hood is a great addition to any kitchen.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI

in other languages