014
-
03 - Gas fry-top
7
Construction, equipment installed and
safety devices
Robust steel frame, with 4 legs (adjustable in height).
18/10 chrome-nickel steel outer panelling.
The surface of the special steel plate can be either
smooth or grooved; the plate comes with side and back
splash-guards made of 18/10 chrome-nickel steel.
The appliance is also fitted with a stainless steel fat tray.
The plate is heated by tubular chromium-plated steel burn-
ers, built to withstand thermomechanical stress.
The pilot burner has fixed injectors.
The combustion chamber and flues are made of electro-
galvanised steel sheeting.
The temperature may be adjusted through special cocks
with thermostats, complete with safety devices.
It goes from low (minimum) to high (maximum) through a
range of easily selectable intermediate levels.
Our fry-tops are available either with a grooved or with a
smooth surface.
Models AGB 459/WP - AGB 470/WP - AGB 461/WP -
AGB 465/WP - AGB 467/WP have two separate grilling
areas on the plate. Each area has its own temperature
controls.
Location
The appliance should be installed in a well ventilated
room, and if possible under a range hood.
The appliance can be installed on its own or alongside
other equipment.
If the appliance is to be installed near inflammable walls,
a minimum distance of 200 mm around the sides and
back should be allowed.
If this is impossible, take proper steps to ensure the in-
stallation is safe, such as fitting tiles or heat-reflecting ma-
terial to the walls
Before connecting up the appliance to the gas supply,
check on the data plate that the appliance is fitted for the
type of gas available.
If not, consult paragraph “Running the appliance on other
types of gas”, page 9.
Legal and technical requisites
During assembly, the following legal and technical requi-
sites should be adhered to:
- relevant national legislation;
- local building and fire safety regulations;
- worksheet “Technical rules for installing gas”;
- worksheet “Technical rules for LP gas”;
- worksheet “Gas installations in industrial kitchens”;
- industrial injury legislation;
- local Gas Board regulations;
- current CEI regulations.
INSTALLATION
Assembly, installation and maintenance, i.e.: assembly,
connecting the gas supply, checking power rating, trans-
forming or adapting the appliance to run on other types of
gas, and commissioning, must all be done by contractors
authorised by the local Gas Board in accordance with lo-
cal and national legislation.
Before doing anything else, seek advice from your Gas
Board.
Installation procedure
To level the appliance correctly, adjust the height of the four
legs.
The R 3/4” gas off-take on the appliance can either be
permanently fixed to the mains or made detachable using a
standard gas tap.
If flexible hose is used, it must be in stainless steel and to
DIN 3383 part 1 or DIN 3384 standard.
After completing connection, check for leaks using a
special leak-detector spray.
Gas venting
These appliances are A construction type, thus no gas
venting is required.
For advice on ventilating the premises where the appliance
is installed, observe current regulations.
OPERATING INSTRUCTIONS